Back to bathroom remodel contractors
Nelson Contracting
- Based in
- San Francisco
- On San Francisco permits
- Feb 2008 to Feb 2026
- Last 24 months
- 3 permits filed
58 permits since 2000: 54 completed, 1 in progress, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
29 bathroom remodel permits: 27 completed, 2 never finaled. Typically 0 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2026 | Completed final sign-off Sep 2026 | 561 Connecticut St | complete kitchen remodel: all new cabinets/appliances (no walls removed). 2 complete bathroom remodel, all in-kind, no walls removed. add 1 new bathroom @ 2/f (add forced vents to all baths). refinished floors, painting throughout entire interior.Details
complete kitchen remodel: all new cabinets/appliances (no walls removed). 2 complete bathroom remodel, all in-kind, no walls removed. add 1 new bathroom @ 2/f (add forced vents to all baths). refinished floors, painting throughout entire interior. | $250,000 |
| Jul 10, 2025 | Completed final sign-off Apr 2026 | 246 Romain St | 1/f garage level - recess (e) garage door and add new man door. new bathroom with new fixtures. new kitchenette with new fixtures and appliances. replace (e) 1/f fiberglass windows at rear of house. no work on basement, 2/f or roof. no structural work.Details
1/f garage level - recess (e) garage door and add new man door. new bathroom with new fixtures. new kitchenette with new fixtures and appliances. replace (e) 1/f fiberglass windows at rear of house. no work on basement, 2/f or roof. no structural work. | $130,635 |
| Jul 8, 2024 | Completed final sign-off Sep 2024 | 1200 18th St | apt c: primary bathroom remodel: include new shower pan, lighting, cabinets and tile. no wall removals.Details
apt c: primary bathroom remodel: include new shower pan, lighting, cabinets and tile. no wall removals. | $45,000 |
| Jul 8, 2024 | Completed final sign-off Sep 2024 | 235 Romain St | bathroom remodel: new bathtub, tile, cabinet, lighting, plumbing, replace existing window with fire rated at prop. line. no walls to be removed. not visible from the street.Details
bathroom remodel: new bathtub, tile, cabinet, lighting, plumbing, replace existing window with fire rated at prop. line. no walls to be removed. not visible from the street. | $47,000 |
| Jul 11, 2023 | Completed final sign-off May 2024 | 752 Clayton St | remodel 2 bathrooms and 1 kitchen. all in kind.Details
remodel 2 bathrooms and 1 kitchen. all in kind. | $70,000 |
| Aug 4, 2021 | Completed final sign-off Feb 2023 | 546 Arkansas St | addition of (1) master bedroom, master bathroom and architectural walk in closet at ground floor within (e) boundary of the bldg, interior remodel within (e) boundary of the bldgDetails
addition of (1) master bedroom, master bathroom and architectural walk in closet at ground floor within (e) boundary of the bldg, interior remodel within (e) boundary of the bldg | $100,000 |
| Dec 8, 2020 | Completed final sign-off May 2021 | 1111 Carolina St | 2 bathroom remodels in like kind; add forced ventilaiton. kitchen remode - in like kind. no walls to be removedDetails
2 bathroom remodels in like kind; add forced ventilaiton. kitchen remode - in like kind. no walls to be removed | $30,000 |
| Jul 30, 2019 | Completed final sign-off Apr 2021 | 238 Mississippi St | remodel both dwelling units (upper & lower): relocate kitchens & 2(n) baths in each unit. enclose exterior space at 1/f underneath (e) habitable space. replace windows at front facade w/(n) alum clad wood windows at (e) openingDetails
remodel both dwelling units (upper & lower): relocate kitchens & 2(n) baths in each unit. enclose exterior space at 1/f underneath (e) habitable space. replace windows at front facade w/(n) alum clad wood windows at (e) opening | $120,000 |
| Apr 30, 2019 | Completed final sign-off Sep 2019 | 754 Clayton St | complete bathroom remodel. no wall removalsDetails
complete bathroom remodel. no wall removals | $40,000 |
| Aug 31, 2018 | Completed final sign-off Feb 2020 | 1200 18th St | add private elevator, rebuild stairs, remodel bathroom. no exterior work. no additional condidioned floor areaDetails
add private elevator, rebuild stairs, remodel bathroom. no exterior work. no additional condidioned floor area | $60,000 |
| Jun 11, 2018 | Completed final sign-off Oct 2018 | 62 Chenery St | standard bathroom remodel - remove claw foot tub, add shower pan & forced ventilation 3' clr of property line, no walls removed 8'x10' footprintDetails
standard bathroom remodel - remove claw foot tub, add shower pan & forced ventilation 3' clr of property line, no walls removed 8'x10' footprint | $25,000 |
| Oct 31, 2017 | Completed final sign-off Jun 2018 | 379 Capp St | interior remodel of (e) 1 story portion of residence: kitchen, bath remodel, replacement of exterior doors and windows, rebuild e wood deck and structural footings and posts. new tankless heater and radiant floor heating.Details
interior remodel of (e) 1 story portion of residence: kitchen, bath remodel, replacement of exterior doors and windows, rebuild e wood deck and structural footings and posts. new tankless heater and radiant floor heating. | $100,000 |
| Jul 31, 2017 | Completed final sign-off Jan 2018 | 2628 Sutter St | to comply nov#201653811, install new foundation and footing at rear of house, new beams, floor joist, 2 windows, 1 door @ rear of house. remodel kitchen and move (e) bathroom to new location, all new led lighting in construction area.Details
to comply nov#201653811, install new foundation and footing at rear of house, new beams, floor joist, 2 windows, 1 door @ rear of house. remodel kitchen and move (e) bathroom to new location, all new led lighting in construction area. | $130,000 |
| Sep 23, 2016 | Completed final sign-off Jan 2017 | 481 14th Av | bathroom remodel, remove tub, replace with shower pan, all new tile, new led lightng and forced ventilation. no changes to wall locations.Details
bathroom remodel, remove tub, replace with shower pan, all new tile, new led lightng and forced ventilation. no changes to wall locations. | $14,800 |
| Apr 12, 2016 | Completed final sign-off Jul 2016 | 895 Rhode Island St | bathroom remodel, new shower valve, sink and toilet (no pan or tub) to include led can lights & forced ventilation, with humid stat. kitchen remodel, new led can lights, gfi, new cabinets, move gas line for stove and add shut off. new gas line to new fireplace in living room and direct vent.Details
bathroom remodel, new shower valve, sink and toilet (no pan or tub) to include led can lights & forced ventilation, with humid stat. kitchen remodel, new led can lights, gfi, new cabinets, move gas line for stove and add shut off. new gas line to new fireplace in living room and direct vent. | $32,000 |
| Apr 12, 2016 | Completed final sign-off May 2016 | 62 Chenery St | 1/2 bath remodel - 2 new led, new forced ventilation with humid stat. kitchen remodel - new cabinets, remove walls, new insulation, 3 new led lights, new gas shut off. new /replace existing federal pacific panel.Details
1/2 bath remodel - 2 new led, new forced ventilation with humid stat. kitchen remodel - new cabinets, remove walls, new insulation, 3 new led lights, new gas shut off. new /replace existing federal pacific panel. | $30,000 |
| Feb 5, 2016 | Completed final sign-off Feb 2017 | 131 Bella Vista Wy | convert (e) non-conditioned space at ground floor into habitable space, (n) bedroom, (n) bath, (n) den, (n) interior stairs connecting g/f with upper floor. (n) deck & stairs at rear yard, less than 10' above deck.Details
convert (e) non-conditioned space at ground floor into habitable space, (n) bedroom, (n) bath, (n) den, (n) interior stairs connecting g/f with upper floor. (n) deck & stairs at rear yard, less than 10' above deck. | $50,000 |
| Nov 13, 2015 | Completed final sign-off Feb 2016 | 4545 Lincoln Wy | enlarge and remodel (e) bathroom by relocating non-structural closet wallDetails
enlarge and remodel (e) bathroom by relocating non-structural closet wall | $15,208 |
| Aug 20, 2015 | Completed final sign-off Nov 2015 | 141 San Carlos St | complete kitchen and bathroom remodel. all new plumb & elect. to comply with title 24. new bathtub, cabinets 7 countertops. refinish floors. no showe panDetails
complete kitchen and bathroom remodel. all new plumb & elect. to comply with title 24. new bathtub, cabinets 7 countertops. refinish floors. no showe pan | $60,000 |
| Mar 30, 2015 | Completed final sign-off Jun 2015 | 128 Noe St | complete kitchen & bathroom remodel, no wall removals, all appliances to remain in (e) location, new shower pan in bathroom . to comply with cec 150.0 (k) 3.5Details
complete kitchen & bathroom remodel, no wall removals, all appliances to remain in (e) location, new shower pan in bathroom . to comply with cec 150.0 (k) 3.5 | $80,000 |
| Jul 15, 2014 | Completed final sign-off Nov 2014 | 171 Melrose Av | one bathroom remodel. new electrical 4" led lights, exhaust fan. new plumbing with tub. no showerpan. no removal of walls.Details
one bathroom remodel. new electrical 4" led lights, exhaust fan. new plumbing with tub. no showerpan. no removal of walls. | $19,000 |
| Jan 6, 2014 | Completed final sign-off Dec 2014 | 5151 Diamond Heights Bl | revision to pa# 201311061238. 1st fl: add bathroom, 2nd fl: add frieplace at living room. 3rd fl: extend walking closet, create storage room at back of garage. replace shed roof w/roof deck at master bedroom & replace window w/sliding door.Details
revision to pa# 201311061238. 1st fl: add bathroom, 2nd fl: add frieplace at living room. 3rd fl: extend walking closet, create storage room at back of garage. replace shed roof w/roof deck at master bedroom & replace window w/sliding door. | $34,000 |
| Nov 6, 2013 | Never finaled issued Nov 2013, no final | 5151 Diamond Heights Bl | full kitchen remodel, 2 full bathroom remodel, 2 shower pans, one 1/2 bath remodel, new can lights throughout, all title 24 compliance, remove and replace decorative appliance with newDetails
full kitchen remodel, 2 full bathroom remodel, 2 shower pans, one 1/2 bath remodel, new can lights throughout, all title 24 compliance, remove and replace decorative appliance with new | $60,000 |
| Oct 7, 2013 | Completed final sign-off May 2014 | 679 Connecticut St | add a bedroom, bathroom and closet at (e) social room area behind the garage. enclose the mechanical area and add a stair to grade from (e) back deck, add pass thru door from 677 to stair.Details
add a bedroom, bathroom and closet at (e) social room area behind the garage. enclose the mechanical area and add a stair to grade from (e) back deck, add pass thru door from 677 to stair. | $63,500 |
| Aug 8, 2013 | Completed final sign-off Oct 2013 | 379 Capp St | complete remodel of bathroom, add shower pan, add high efficiency lighting, new fan in ceiling, add plumbing and electrical in large hallway closet for washer/dryer, remove no walls. - 1st floorDetails
complete remodel of bathroom, add shower pan, add high efficiency lighting, new fan in ceiling, add plumbing and electrical in large hallway closet for washer/dryer, remove no walls. - 1st floor | $20,000 |
| Mar 15, 2013 | Completed final sign-off Apr 2013 | 377 Capp St | remodel 8'x7' bathroom - new electrical & plumbing all new fixtures, drywall, tile, shower pan, paint.Details
remodel 8'x7' bathroom - new electrical & plumbing all new fixtures, drywall, tile, shower pan, paint. | $20,000 |
| Aug 8, 2012 | Completed final sign-off Nov 2012 | 2358 28th Av | complete kitchen remodel. complete bathroom remodelDetails
complete kitchen remodel. complete bathroom remodel | $50,000 |
| Sep 13, 2010 | Never finaled issued Sep 2010, no final | 233 Corbett Av | bath room remodel on the housekeeping unit # 233a. no wall removal, work on housingkeeping area 233aDetails
bath room remodel on the housekeeping unit # 233a. no wall removal, work on housingkeeping area 233a | $5,000 |
| Feb 12, 2008 | Completed final sign-off Mar 2008 | 578 Waller St | non structural kitchen remodel: replace existing cabinets and floors. replace countertops. replace range, microwave and refrig. relocate sink and dishwasher, new sink in bathroom. min 50% of kitchen light wattage must be fluorescent, provide fluorescent light or occupancy sensor in bath.Details
non structural kitchen remodel: replace existing cabinets and floors. replace countertops. replace range, microwave and refrig. relocate sink and dishwasher, new sink in bathroom. min 50% of kitchen light wattage must be fluorescent, provide fluorescent light or occupancy sensor in bath. | $20,000 |