Back to kitchen remodel contractors
Nelson Contracting
- Based in
- San Francisco
- On San Francisco permits
- Feb 2008 to Feb 2026
- Last 24 months
- 3 permits filed
58 permits since 2000: 54 completed, 1 in progress, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
24 kitchen remodel permits: 23 completed, 1 never finaled. Typically 0 days from filing to permit and 106 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2026 | Completed final sign-off Sep 2026 | 561 Connecticut St | complete kitchen remodel: all new cabinets/appliances (no walls removed). 2 complete bathroom remodel, all in-kind, no walls removed. add 1 new bathroom @ 2/f (add forced vents to all baths). refinished floors, painting throughout entire interior.Details
complete kitchen remodel: all new cabinets/appliances (no walls removed). 2 complete bathroom remodel, all in-kind, no walls removed. add 1 new bathroom @ 2/f (add forced vents to all baths). refinished floors, painting throughout entire interior. | $250,000 |
| Jul 10, 2025 | Completed final sign-off Apr 2026 | 246 Romain St | 1/f garage level - recess (e) garage door and add new man door. new bathroom with new fixtures. new kitchenette with new fixtures and appliances. replace (e) 1/f fiberglass windows at rear of house. no work on basement, 2/f or roof. no structural work.Details
1/f garage level - recess (e) garage door and add new man door. new bathroom with new fixtures. new kitchenette with new fixtures and appliances. replace (e) 1/f fiberglass windows at rear of house. no work on basement, 2/f or roof. no structural work. | $130,635 |
| Feb 28, 2025 | Completed final sign-off May 2025 | 286 Romain St | basic kitchen remodel - complete demo new/upgrade electrical and plumbing as needed new cabinets, countertops, appliances keep within (e) footprintDetails
basic kitchen remodel - complete demo new/upgrade electrical and plumbing as needed new cabinets, countertops, appliances keep within (e) footprint | $50,000 |
| Jul 12, 2023 | Completed final sign-off Jan 2024 | 246 Romain St | kitchen remodel- like in kind. same locationDetails
kitchen remodel- like in kind. same location | $40,000 |
| Jul 11, 2023 | Completed final sign-off May 2024 | 752 Clayton St | remodel 2 bathrooms and 1 kitchen. all in kind.Details
remodel 2 bathrooms and 1 kitchen. all in kind. | $70,000 |
| Dec 8, 2020 | Completed final sign-off May 2021 | 1111 Carolina St | 2 bathroom remodels in like kind; add forced ventilaiton. kitchen remode - in like kind. no walls to be removedDetails
2 bathroom remodels in like kind; add forced ventilaiton. kitchen remode - in like kind. no walls to be removed | $30,000 |
| Jul 30, 2019 | Completed final sign-off Apr 2021 | 238 Mississippi St | remodel both dwelling units (upper & lower): relocate kitchens & 2(n) baths in each unit. enclose exterior space at 1/f underneath (e) habitable space. replace windows at front facade w/(n) alum clad wood windows at (e) openingDetails
remodel both dwelling units (upper & lower): relocate kitchens & 2(n) baths in each unit. enclose exterior space at 1/f underneath (e) habitable space. replace windows at front facade w/(n) alum clad wood windows at (e) opening | $120,000 |
| Jun 11, 2018 | Completed final sign-off Oct 2018 | 83 Meadowbrook Dr | standard kitchen remodel - no walls removed, remove/replace cabinets w/new appliances, 10'x16' footprintDetails
standard kitchen remodel - no walls removed, remove/replace cabinets w/new appliances, 10'x16' footprint | $30,000 |
| Oct 31, 2017 | Completed final sign-off Jun 2018 | 379 Capp St | interior remodel of (e) 1 story portion of residence: kitchen, bath remodel, replacement of exterior doors and windows, rebuild e wood deck and structural footings and posts. new tankless heater and radiant floor heating.Details
interior remodel of (e) 1 story portion of residence: kitchen, bath remodel, replacement of exterior doors and windows, rebuild e wood deck and structural footings and posts. new tankless heater and radiant floor heating. | $100,000 |
| Jul 31, 2017 | Completed final sign-off Jan 2018 | 2628 Sutter St | to comply nov#201653811, install new foundation and footing at rear of house, new beams, floor joist, 2 windows, 1 door @ rear of house. remodel kitchen and move (e) bathroom to new location, all new led lighting in construction area.Details
to comply nov#201653811, install new foundation and footing at rear of house, new beams, floor joist, 2 windows, 1 door @ rear of house. remodel kitchen and move (e) bathroom to new location, all new led lighting in construction area. | $130,000 |
| Sep 23, 2016 | Completed final sign-off Jan 2017 | 488 Gellert Dr | kitchen remodel, remove (e) cabinets, replace with new and add all new appliances. all new led lighting, including under cab lights. connect to (e) hood vnting. no changes to wall locations.Details
kitchen remodel, remove (e) cabinets, replace with new and add all new appliances. all new led lighting, including under cab lights. connect to (e) hood vnting. no changes to wall locations. | $35,000 |
| May 25, 2016 | Completed final sign-off Sep 2016 | 740 Arkansas St | kitchen remodel, replace (e) cabinets w/new, install new appliances, add new gas line for exterior bbq, no wall removal.Details
kitchen remodel, replace (e) cabinets w/new, install new appliances, add new gas line for exterior bbq, no wall removal. | $20,000 |
| Apr 12, 2016 | Completed final sign-off May 2016 | 62 Chenery St | 1/2 bath remodel - 2 new led, new forced ventilation with humid stat. kitchen remodel - new cabinets, remove walls, new insulation, 3 new led lights, new gas shut off. new /replace existing federal pacific panel.Details
1/2 bath remodel - 2 new led, new forced ventilation with humid stat. kitchen remodel - new cabinets, remove walls, new insulation, 3 new led lights, new gas shut off. new /replace existing federal pacific panel. | $30,000 |
| Apr 12, 2016 | Completed final sign-off Jul 2016 | 895 Rhode Island St | bathroom remodel, new shower valve, sink and toilet (no pan or tub) to include led can lights & forced ventilation, with humid stat. kitchen remodel, new led can lights, gfi, new cabinets, move gas line for stove and add shut off. new gas line to new fireplace in living room and direct vent.Details
bathroom remodel, new shower valve, sink and toilet (no pan or tub) to include led can lights & forced ventilation, with humid stat. kitchen remodel, new led can lights, gfi, new cabinets, move gas line for stove and add shut off. new gas line to new fireplace in living room and direct vent. | $32,000 |
| Aug 20, 2015 | Completed final sign-off Nov 2015 | 141 San Carlos St | complete kitchen and bathroom remodel. all new plumb & elect. to comply with title 24. new bathtub, cabinets 7 countertops. refinish floors. no showe panDetails
complete kitchen and bathroom remodel. all new plumb & elect. to comply with title 24. new bathtub, cabinets 7 countertops. refinish floors. no showe pan | $60,000 |
| Jul 16, 2015 | Completed final sign-off Dec 2015 | 191 Collingwood St | kitchen remodel - remove all lath and plaster, new insulation, new plumbing as necessary. existing lights to remain, ceiling to remain, new appliances, relocate and extend store gas line. new cabinets and countertops, new electrical to code.Details
kitchen remodel - remove all lath and plaster, new insulation, new plumbing as necessary. existing lights to remain, ceiling to remain, new appliances, relocate and extend store gas line. new cabinets and countertops, new electrical to code. | $30,000 |
| Mar 30, 2015 | Completed final sign-off Jun 2015 | 128 Noe St | complete kitchen & bathroom remodel, no wall removals, all appliances to remain in (e) location, new shower pan in bathroom . to comply with cec 150.0 (k) 3.5Details
complete kitchen & bathroom remodel, no wall removals, all appliances to remain in (e) location, new shower pan in bathroom . to comply with cec 150.0 (k) 3.5 | $80,000 |
| Nov 18, 2014 | Completed final sign-off Dec 2014 | 101 Mateo St | kitchen remodel, replace existing cabinets, countertop and appliances, add dishwasher, no wall removals.Details
kitchen remodel, replace existing cabinets, countertop and appliances, add dishwasher, no wall removals. | $10,000 |
| Sep 3, 2014 | Completed final sign-off Nov 2014 | 3065 26th Av | complete kitchen remodel, remove wall, add beam, new cabinets, drywall, electrical, minor plumbing, all new 4" led can lights, gfi, dedicated as required.Details
complete kitchen remodel, remove wall, add beam, new cabinets, drywall, electrical, minor plumbing, all new 4" led can lights, gfi, dedicated as required. | $30,000 |
| Jan 10, 2014 | Completed final sign-off Mar 2014 | 1113 Carolina St | remodel kitchen - new cabinets, new appliances, electrical and plumbing as needed. to comply with cec150(k) 8Details
remodel kitchen - new cabinets, new appliances, electrical and plumbing as needed. to comply with cec150(k) 8 | $10,000 |
| Nov 6, 2013 | Never finaled issued Nov 2013, no final | 5151 Diamond Heights Bl | full kitchen remodel, 2 full bathroom remodel, 2 shower pans, one 1/2 bath remodel, new can lights throughout, all title 24 compliance, remove and replace decorative appliance with newDetails
full kitchen remodel, 2 full bathroom remodel, 2 shower pans, one 1/2 bath remodel, new can lights throughout, all title 24 compliance, remove and replace decorative appliance with new | $60,000 |
| Aug 19, 2013 | Completed final sign-off Dec 2013 | 171 Melrose Av | 1)kitchen remodel. 2)open extg wall between kitchen and living room.Details
1)kitchen remodel. 2)open extg wall between kitchen and living room. | $5,000 |
| Aug 8, 2012 | Completed final sign-off Nov 2012 | 2358 28th Av | complete kitchen remodel. complete bathroom remodelDetails
complete kitchen remodel. complete bathroom remodel | $50,000 |
| Feb 12, 2008 | Completed final sign-off Mar 2008 | 578 Waller St | non structural kitchen remodel: replace existing cabinets and floors. replace countertops. replace range, microwave and refrig. relocate sink and dishwasher, new sink in bathroom. min 50% of kitchen light wattage must be fluorescent, provide fluorescent light or occupancy sensor in bath.Details
non structural kitchen remodel: replace existing cabinets and floors. replace countertops. replace range, microwave and refrig. relocate sink and dishwasher, new sink in bathroom. min 50% of kitchen light wattage must be fluorescent, provide fluorescent light or occupancy sensor in bath. | $20,000 |