Back to kitchen remodel contractors
Nbay Construction And Remodeling Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2021 to Aug 2026
- Last 24 months
- 13 permits filed
26 permits since 2000: 18 completed, 5 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 9 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 114 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2025 | Completed final sign-off Feb 2026 | 4441 Balboa St | remodel existing kitchen & bathroom, install subpanel for unit work for apt#4; no removal of wallsDetails
remodel existing kitchen & bathroom, install subpanel for unit work for apt#4; no removal of walls | $30,000 |
| Jun 9, 2025 | Completed final sign-off Oct 2025 | 2345 Post St | unit #4: remodel in kind (e) kitchen & bathroom. install subpanel, upgrade electrical for kitchen & bathroom. no change to floor layout. no change to wall layout. no structural work.Details
unit #4: remodel in kind (e) kitchen & bathroom. install subpanel, upgrade electrical for kitchen & bathroom. no change to floor layout. no change to wall layout. no structural work. | $40,000 |
| Jun 5, 2025 | Completed final sign-off Jul 2026 | 80 Southwood Dr | remodel (e) kitchen and 2 bathrooms. install subpanel. upgrade electrical for kitchen and 2 bathrooms.Details
remodel (e) kitchen and 2 bathrooms. install subpanel. upgrade electrical for kitchen and 2 bathrooms. | $60,000 |
| Nov 14, 2024 | Completed final sign-off May 2025 | 441 24th Av | unit 9- remodel kitchen and bathroom in kind. install subpanel in unitDetails
unit 9- remodel kitchen and bathroom in kind. install subpanel in unit | $50,000 |
| Oct 23, 2024 | Completed final sign-off Dec 2024 | 1740 Waller St | remodel existing one kitchen. add one subpanel.Details
remodel existing one kitchen. add one subpanel. | $30,000 |
| Sep 17, 2024 | Completed final sign-off Dec 2024 | 2770 San Bruno Av | unit #3: remodel existing kitchen and one bathroom in kind. no change to floor layout. no change to wall layout. no structural work.Details
unit #3: remodel existing kitchen and one bathroom in kind. no change to floor layout. no change to wall layout. no structural work. | $20,000 |
| Sep 7, 2022 | Expired or cancelled expired Apr 2026 | 65 San Fernando Wy | rear addition to 1st fl 233 sqft with 2nd fl rear roof deck & 1 new 150 sq ft bath.1st floor enlarge kitchen & dining room. replace in kind (e)windows as needed in same opening with solid kiln dry paint grade solid wood sash, double glazed.Details
rear addition to 1st fl 233 sqft with 2nd fl rear roof deck & 1 new 150 sq ft bath.1st floor enlarge kitchen & dining room. replace in kind (e)windows as needed in same opening with solid kiln dry paint grade solid wood sash, double glazed. | $60,000 |
| Jun 8, 2022 | Completed final sign-off Sep 2022 | 596 36th Av | remodel one existing kitchen. upgrade electrical and plumbing for kitchen. non structural.Details
remodel one existing kitchen. upgrade electrical and plumbing for kitchen. non structural. | $8,000 |
| May 5, 2022 | Completed final sign-off Nov 2023 | 233 20th Av | remodel existing kitchen and laundry area. remodel extg bathroom.Details
remodel existing kitchen and laundry area. remodel extg bathroom. | $40,000 |
| May 2, 2022 | Expired or cancelled expired Apr 2026 | 65 San Fernando Wy | remodeling entire house, remodel kitchen and bathroom, open kitchen design, 1 new bathroom and remode 2 bathroom on 2nd floor. 1/2 bathroom on 1st floor. remodel bathroom in basement. replace all sheet rock with 5/8 type x. replace existing window in kind. replace garage door to 8' wide.Details
remodeling entire house, remodel kitchen and bathroom, open kitchen design, 1 new bathroom and remode 2 bathroom on 2nd floor. 1/2 bathroom on 1st floor. remodel bathroom in basement. replace all sheet rock with 5/8 type x. replace existing window in kind. replace garage door to 8' wide. | $80,000 |
| Mar 21, 2022 | Completed final sign-off Jun 2022 | 470 Grove St | unit #2: remodel existing kitchen and bathroom. install new subpanel in the unit. no structural work - no wall/framing modification.Details
unit #2: remodel existing kitchen and bathroom. install new subpanel in the unit. no structural work - no wall/framing modification. | $20,000 |