Block 1599, lot 040
4441 Balboa St
- City’s use
- Multi-Family Residential
- Built
- 1948
- Stories
- 2
- Units
- 4
- Rooms
- 4 bathrooms
- Building
- 4,204 sq ft
- Lot
- 2,750 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 23, 2025 | Completed final sign-off Apr 2026 | 4441 Balboa St | Nbay Construction And Remodeling Inc | unit#4: replace total 6 windows, all same size, same location, same opening, one in livingroom is alumnium combined wood, the other 5 are vinyl materials. 3 windows facing the street, 3 windows not facing the street. u =0.3.Details
unit#4: replace total 6 windows, all same size, same location, same opening, one in livingroom is alumnium combined wood, the other 5 are vinyl materials. 3 windows facing the street, 3 windows not facing the street. u =0.3. | $5,000 |
| Sep 2, 2025 | Completed final sign-off Feb 2026 | 4441 Balboa St | Nbay Construction And Remodeling Inc | remodel existing kitchen & bathroom, install subpanel for unit work for apt#4; no removal of wallsDetails
remodel existing kitchen & bathroom, install subpanel for unit work for apt#4; no removal of walls | $30,000 |
| Dec 3, 2018 | Never finaled issued Dec 2018, no final | 4441 Balboa St | repair stairs and railing to revmoeve and replace dryrot wood. repair to be less than 50% replaced wood pressure treated , redwood with 2 coats paint. in kind. rear of bldgDetails
repair stairs and railing to revmoeve and replace dryrot wood. repair to be less than 50% replaced wood pressure treated , redwood with 2 coats paint. in kind. rear of bldg | $5,000 | |
| Sep 24, 2014 | Expired or cancelled expired Jul 2016 | 4441 Balboa St | work in unit #2: remodel (e) bathroom in-kind using plumbing and electrical. no new walls, pipes or wiring. no new windows or doors.Details
work in unit #2: remodel (e) bathroom in-kind using plumbing and electrical. no new walls, pipes or wiring. no new windows or doors. | $6,000 | |
| Jul 30, 2014 | Never finaled issued Jul 2014, no final | 4441 Balboa St | street spaceDetails
street space | ||
| Mar 12, 2013 | Never finaled issued Mar 2013, no final | 4441 Balboa St | Mark Scott Construction Inc | restore 2 apartment units to pre-fire condition. replace 2 top plates in lower bath. replace finishes in lower & upper bath & hallway. to include insulation, sheetrock tile, lino. vanity, sink, etc. electrical to be redone; in areas where sheetrock was removed. plumbing to be redone as needed. likeDetails
restore 2 apartment units to pre-fire condition. replace 2 top plates in lower bath. replace finishes in lower & upper bath & hallway. to include insulation, sheetrock tile, lino. vanity, sink, etc. electrical to be redone; in areas where sheetrock was removed. plumbing to be redone as needed. like | $62,176 |
| Jan 7, 2011 | Never finaled issued Jan 2011, no final | 4441 Balboa St | Miranda's Roofing Partnership | reroofingDetails
reroofing | $6,800 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Nbay Construction And Remodeling Inc (2), Mark Scott Construction Inc, Miranda's Roofing Partnership
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.