Mountain Bay Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Aug 2025
- Last 24 months
- 2 permits filed
76 permits since 2000: 49 completed, 3 in progress, 15 never finaled, 9 expired or cancelled.
Of the 15 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 8 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 318 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 26, 2022 | Completed final sign-off Jun 2024 | 1626 Vallejo St | remodel of (e) three bathrooms and (e) kitchen in same footprint, no stuctural changes, no change to the front facade of the buildingDetails
remodel of (e) three bathrooms and (e) kitchen in same footprint, no stuctural changes, no change to the front facade of the building | $150,000 |
| Jun 12, 2017 | Completed final sign-off Dec 2018 | 2255 Pine St | remodel kitchen, addition of guest powder bath - addition of 2 bedrooms in basement - removal of bedrroms at 1st flr. new interior stair. no changes of facade, roof or elevationsDetails
remodel kitchen, addition of guest powder bath - addition of 2 bedrooms in basement - removal of bedrroms at 1st flr. new interior stair. no changes of facade, roof or elevations | $130,000 |
| Sep 10, 2015 | Completed final sign-off Aug 2017 | 2334 Webster St | revision to appl #201503261971 - relocate bathroom from front to rear on both 2 & 3 levels, relocate ktichen on level 3. structural work were encountered requiring repairs throughout when remodeling for kitchen & bath.Details
revision to appl #201503261971 - relocate bathroom from front to rear on both 2 & 3 levels, relocate ktichen on level 3. structural work were encountered requiring repairs throughout when remodeling for kitchen & bath. | $40,000 |
| Jun 3, 2015 | Completed final sign-off Sep 2015 | 738 Hayes St | install new kitchen as per plans to complete 2nd unit in downstairs.Details
install new kitchen as per plans to complete 2nd unit in downstairs. | $30,000 |
| Mar 26, 2015 | Completed final sign-off Aug 2017 | 2334 Webster St | remodel 2 kitchens & 4 baths of both units - replace cabinets & fixtures. no kitchen remodel on unit #2336. kitchen 12 x 16, bathroom 6 x 8 each, total of 1 kitchen & 4 bathrooms.Details
remodel 2 kitchens & 4 baths of both units - replace cabinets & fixtures. no kitchen remodel on unit #2336. kitchen 12 x 16, bathroom 6 x 8 each, total of 1 kitchen & 4 bathrooms. | $30,000 |
| Dec 10, 2012 | Completed final sign-off Jun 2014 | 1024 Cole St | no structural work. remove extg kitchen and bath relocate per plan. update electrical wiring and install new fixtures per plan. install new kitchen cabinets and tile. refinish floors and paint. intstall new window in the back.Details
no structural work. remove extg kitchen and bath relocate per plan. update electrical wiring and install new fixtures per plan. install new kitchen cabinets and tile. refinish floors and paint. intstall new window in the back. | $75,517 |
| Sep 30, 2010 | Completed final sign-off Dec 2010 | 1818 Broadway | #403 -remove & replace at same location kitchen & bathroom cabinets & paint unit, no structural changes, no new lighting, no change to exhaust system.Details
#403 -remove & replace at same location kitchen & bathroom cabinets & paint unit, no structural changes, no new lighting, no change to exhaust system. | $12,000 |
| Jan 15, 2008 | Completed final sign-off Nov 2008 | 738 Hayes St | kitchen and bath remodel, new cabinets tile, sink etc.Details
kitchen and bath remodel, new cabinets tile, sink etc. | $50,000 |
| May 3, 2000 | Expired or cancelled expired Nov 2000 | 280 25th Av | repair pest damage, replace cabinets and repair dry rot, upgrade kitchenDetails
repair pest damage, replace cabinets and repair dry rot, upgrade kitchen | $25,000 |