Mountain Bay Construction

Contractor license
583372
State license record
Based in
San Francisco
On San Francisco permits
May 2000 to Aug 2025
Last 24 months
2 permits filed

76 permits since 2000: 49 completed, 3 in progress, 15 never finaled, 9 expired or cancelled.

Of the 15 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 11 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Stairs permits

AllRoof deck 1Deck 2Stairs 7Kitchen remodel 9Bathroom remodel 12

7 stairs permits: 5 completed, 2 never finaled. Typically 2 days from filing to permit and 117 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 6, 2023Never finaled
issued Aug 2023, no final
1626 Vallejo Strebuild exterior stairs at rear of building
Details
Permit
202303063103
Status
issued
Filed
Mar 6, 2023
Permit issued
Aug 1, 2023
Declared cost
$5,000
Address
1626 Vallejo St

rebuild exterior stairs at rear of building

Open the permit page

$5,000
Dec 12, 2018Completed
final sign-off Dec 2018
2255 Pine Strevision to pa 2017-0612-9043 minor floor plan modifications reconfigure basement layout stair layout, 1st & 2nd floor
Details
Permit
201812128152
Status
complete
Filed
Dec 12, 2018
Permit issued
Dec 14, 2018
Final sign-off
Dec 18, 2018
Address
2255 Pine St

revision to pa 2017-0612-9043 minor floor plan modifications reconfigure basement layout stair layout, 1st & 2nd floor

Open the permit page

May 10, 2018Never finaled
issued May 2018, no final
200 Cherry Strevision to permit #2018-0214-1278. change stairs construction from concrete to wood construction.
Details
Permit
201805108793
Status
issued
Filed
May 10, 2018
Permit issued
May 10, 2018
Address
200 Cherry St

revision to permit #2018-0214-1278. change stairs construction from concrete to wood construction.

Open the permit page

Feb 14, 2018Completed
final sign-off Jul 2018
200 Cherry Stto comply with complaint 201726901 - demo & replace (e) exterior stairs & landing, like for like
Details
Permit
201802141278
Status
complete
Filed
Feb 14, 2018
Permit issued
Feb 16, 2018
Final sign-off
Jul 6, 2018
Declared cost
$1,800
Address
200 Cherry St

to comply with complaint 201726901 - demo & replace (e) exterior stairs & landing, like for like

Open the permit page

$1,800
Jun 12, 2017Completed
final sign-off Dec 2018
2255 Pine Stremodel kitchen, addition of guest powder bath - addition of 2 bedrooms in basement - removal of bedrroms at 1st flr. new interior stair. no changes of facade, roof or elevations
Details
Permit
201706129043
Status
complete
Filed
Jun 12, 2017
Permit issued
Apr 11, 2018
Final sign-off
Dec 18, 2018
Declared cost
$130,000
Address
2255 Pine St

remodel kitchen, addition of guest powder bath - addition of 2 bedrooms in basement - removal of bedrroms at 1st flr. new interior stair. no changes of facade, roof or elevations

Open the permit page

$130,000
Nov 27, 2012Completed
final sign-off Feb 2013
3961 24th Stoffice space tenant improvements. no structural work. demo existing walls (non structural) per plan. new walls. new bathroom to comply with accessibility requirements. no exterior work. install new carpet and paint. new acoustical ceiling w/ lighting. visual striping @exterior stairway & lever hard
Details
Permit
201211274917
Status
complete
Filed
Nov 27, 2012
Permit issued
Nov 28, 2012
Final sign-off
Feb 20, 2013
Declared cost
$34,800
Address
3961 24th St

office space tenant improvements. no structural work. demo existing walls (non structural) per plan. new walls. new bathroom to comply with accessibility requirements. no exterior work. install new carpet and paint. new acoustical ceiling w/ lighting. visual striping @exterior stairway & lever hard

Open the permit page

$34,800
Jul 25, 2008Completed
final sign-off Nov 2008
738 Hayes Strevision to appl #200804018438: replace fireplace flue from inside to outside. install new gas fireplace on 2/f only. correction to (e) drawing to show correct original rear exit stair. add concrete to (e) foundation to strengthen (e) brick foundation.
Details
Permit
200807257698
Status
complete
Filed
Jul 25, 2008
Permit issued
Jul 31, 2008
Final sign-off
Nov 25, 2008
Declared cost
$3,500
Address
738 Hayes St

revision to appl #200804018438: replace fireplace flue from inside to outside. install new gas fireplace on 2/f only. correction to (e) drawing to show correct original rear exit stair. add concrete to (e) foundation to strengthen (e) brick foundation.

Open the permit page

$3,500