Back to kitchen remodel contractors
Mosvaler Construction Inc
- Based in
- Hayward
- On San Francisco permits
- Jan 2018 to Apr 2026
- Last 24 months
- 2 permits filed
27 permits since 2000: 21 completed, 3 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 never finaled. Typically 38 days from filing to permit and 282 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 4, 2022 | Completed final sign-off Mar 2023 | 791 09th Av | unit 791 : to comply w/physical inspection report #cc-8541. remove kitchenette from 1/f (per letter dated 2/7/2022) & revert back to original building permit. no other work under this permit.Details
unit 791 : to comply w/physical inspection report #cc-8541. remove kitchenette from 1/f (per letter dated 2/7/2022) & revert back to original building permit. no other work under this permit. | $2,700 |
| Sep 29, 2022 | Completed final sign-off Apr 2024 | 63 Putnam St | kitchen and bathroom remodel- no structural work. no wall or layout changesDetails
kitchen and bathroom remodel- no structural work. no wall or layout changes | $15,000 |
| Sep 28, 2022 | Never finaled issued Jul 2023, no final | 371 Prospect Av | residential remodel & addition. (n) garage door. infill addition of a sun room to connect (e) garage structure to house in the rear. (n) master suite addition above (e) garage (bedroom, home office & bathroom) remodel (e) 2nd flr arears to remove 1 (e) bedrm & reconfigure kitchen & dining rm.Details
residential remodel & addition. (n) garage door. infill addition of a sun room to connect (e) garage structure to house in the rear. (n) master suite addition above (e) garage (bedroom, home office & bathroom) remodel (e) 2nd flr arears to remove 1 (e) bedrm & reconfigure kitchen & dining rm. | $372,133 |
| Dec 12, 2019 | Completed final sign-off Sep 2020 | 310 Anza St | revision to pa #2018-0604-0931: add 1 bedroom and interior renovation. relocate kitchenette, infill 70 sq ft. at interior stairDetails
revision to pa #2018-0604-0931: add 1 bedroom and interior renovation. relocate kitchenette, infill 70 sq ft. at interior stair | $30,000 |
| Mar 12, 2018 | Completed final sign-off Nov 2019 | 218 Anza St | demo (e) unpermitted rear sunroom of unit# 218 & deteriorated wood deck of unit# 220. new 2 story, rear addition to be new great room for both units. renovate (e) kitchen & (e) full bath & add 2nd bedroom. washer & dryer closetfor both units within (e) footprint.Details
demo (e) unpermitted rear sunroom of unit# 218 & deteriorated wood deck of unit# 220. new 2 story, rear addition to be new great room for both units. renovate (e) kitchen & (e) full bath & add 2nd bedroom. washer & dryer closetfor both units within (e) footprint. | $200,000 |