Permit GraphShortlistSan Francisco building permits since 2000

Mosvaler Construction Inc

Contractor license
1036969
State license record
Based in
Hayward
On San Francisco permits
Jan 2018 to Apr 2026
Last 24 months
2 permits filed

27 permits since 2000: 21 completed, 3 in progress, 2 never finaled, 1 expired or cancelled.

Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Deck permits

AllRoof deck 1Deck 3Stairs 4Kitchen remodel 5Bathroom remodel 6

3 deck permits: 2 completed, 1 in progress. Typically 475 days from filing to permit and 650 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Nov 17, 2022In progress
issued Mar 2024
4000 21st Strear yard: create new decks and walkways less than 3' above (e) grade, with new stair connections between (e) residence , walkways and (e) yard/grade. replacement fence and access gate from public way to yard. replacement retaining wall in rear yard. relocate door facing yard. excavat 21.1 cubic yds
Details
Permit
202211176788
Status
issued
Filed
Nov 17, 2022
Permit issued
Mar 6, 2024
Declared cost
$30,000
Address
4000 21st St

rear yard: create new decks and walkways less than 3' above (e) grade, with new stair connections between (e) residence , walkways and (e) yard/grade. replacement fence and access gate from public way to yard. replacement retaining wall in rear yard. relocate door facing yard. excavat 21.1 cubic yds

Open the permit page

$30,000
Apr 17, 2018Completed
final sign-off May 2022
1979 Funston Avvertical & horizontal addition. new 3rd story addition with master suite & 2 bedrooms & 1 bath. replace 2nd floor study with new 1st & 2nd floor rear addition. replace (e) 2nd flr rear deck with new. dry rot repair & interior updates. nfpa 13r sprinkler system under separate permit.
Details
Permit
201804176519
Status
complete
Filed
Apr 17, 2018
Permit issued
Aug 12, 2019
Final sign-off
May 26, 2022
Declared cost
$250,000
Address
1979 Funston Av

vertical & horizontal addition. new 3rd story addition with master suite & 2 bedrooms & 1 bath. replace 2nd floor study with new 1st & 2nd floor rear addition. replace (e) 2nd flr rear deck with new. dry rot repair & interior updates. nfpa 13r sprinkler system under separate permit.

Open the permit page

$250,000
Mar 12, 2018Completed
final sign-off Nov 2019
218 Anza Stdemo (e) unpermitted rear sunroom of unit# 218 & deteriorated wood deck of unit# 220. new 2 story, rear addition to be new great room for both units. renovate (e) kitchen & (e) full bath & add 2nd bedroom. washer & dryer closetfor both units within (e) footprint.
Details
Permit
201803123467
Status
complete
Filed
Mar 12, 2018
Permit issued
Jan 29, 2019
Final sign-off
Nov 8, 2019
Declared cost
$200,000
Address
218 Anza St

demo (e) unpermitted rear sunroom of unit# 218 & deteriorated wood deck of unit# 220. new 2 story, rear addition to be new great room for both units. renovate (e) kitchen & (e) full bath & add 2nd bedroom. washer & dryer closetfor both units within (e) footprint.

Open the permit page

$200,000