Permit GraphShortlistSan Francisco building permits since 2000

Mosvaler Construction Inc

Contractor license
1036969
State license record
Based in
Hayward
On San Francisco permits
Jan 2018 to Apr 2026
Last 24 months
2 permits filed

27 permits since 2000: 21 completed, 3 in progress, 2 never finaled, 1 expired or cancelled.

Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Bathroom remodel permits

AllRoof deck 1Deck 3Stairs 4Kitchen remodel 5Bathroom remodel 6

6 bathroom remodel permits: 5 completed, 1 never finaled. Typically 164 days from filing to permit and 542 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jul 11, 2025Completed
final sign-off Mar 2026
124 Church St2/f and 3/f repair fire damages - replace fire damaged studs and front wall covering. replace fire damaged roof joists, ceiling joists, roof sheathing and gyp-board. rebuild 2 bathrooms and repair electrical wiring.
Details
Permit
202507110623
Status
complete
Filed
Jul 11, 2025
Permit issued
Aug 19, 2025
Final sign-off
Mar 30, 2026
Declared cost
$80,000
Address
124 Church St

2/f and 3/f repair fire damages - replace fire damaged studs and front wall covering. replace fire damaged roof joists, ceiling joists, roof sheathing and gyp-board. rebuild 2 bathrooms and repair electrical wiring.

Open the permit page

$80,000
Sep 29, 2022Completed
final sign-off Apr 2024
63 Putnam Stkitchen and bathroom remodel- no structural work. no wall or layout changes
Details
Permit
202209293477
Status
complete
Filed
Sep 29, 2022
Permit issued
Sep 30, 2022
Final sign-off
Apr 17, 2024
Declared cost
$15,000
Address
63 Putnam St

kitchen and bathroom remodel- no structural work. no wall or layout changes

Open the permit page

$15,000
Sep 28, 2022Never finaled
issued Jul 2023, no final
371 Prospect Avresidential remodel & addition. (n) garage door. infill addition of a sun room to connect (e) garage structure to house in the rear. (n) master suite addition above (e) garage (bedroom, home office & bathroom) remodel (e) 2nd flr arears to remove 1 (e) bedrm & reconfigure kitchen & dining rm.
Details
Permit
202209283359
Status
issued
Filed
Sep 28, 2022
Permit issued
Jul 6, 2023
Declared cost
$372,133
Address
371 Prospect Av

residential remodel & addition. (n) garage door. infill addition of a sun room to connect (e) garage structure to house in the rear. (n) master suite addition above (e) garage (bedroom, home office & bathroom) remodel (e) 2nd flr arears to remove 1 (e) bedrm & reconfigure kitchen & dining rm.

Open the permit page

$372,133
Aug 18, 2021Completed
final sign-off Mar 2023
3124 21st Strevision to app#201809119733 and 201707192332. remove and structure posts. new steel beam relocate bath and bedroom walls.
Details
Permit
202108186625
Status
complete
Filed
Aug 18, 2021
Permit issued
Oct 5, 2021
Final sign-off
Mar 31, 2023
Declared cost
$7,500
Address
3124 21st St

revision to app#201809119733 and 201707192332. remove and structure posts. new steel beam relocate bath and bedroom walls.

Open the permit page

$7,500
Apr 17, 2018Completed
final sign-off May 2022
1979 Funston Avvertical & horizontal addition. new 3rd story addition with master suite & 2 bedrooms & 1 bath. replace 2nd floor study with new 1st & 2nd floor rear addition. replace (e) 2nd flr rear deck with new. dry rot repair & interior updates. nfpa 13r sprinkler system under separate permit.
Details
Permit
201804176519
Status
complete
Filed
Apr 17, 2018
Permit issued
Aug 12, 2019
Final sign-off
May 26, 2022
Declared cost
$250,000
Address
1979 Funston Av

vertical & horizontal addition. new 3rd story addition with master suite & 2 bedrooms & 1 bath. replace 2nd floor study with new 1st & 2nd floor rear addition. replace (e) 2nd flr rear deck with new. dry rot repair & interior updates. nfpa 13r sprinkler system under separate permit.

Open the permit page

$250,000
Mar 12, 2018Completed
final sign-off Nov 2019
218 Anza Stdemo (e) unpermitted rear sunroom of unit# 218 & deteriorated wood deck of unit# 220. new 2 story, rear addition to be new great room for both units. renovate (e) kitchen & (e) full bath & add 2nd bedroom. washer & dryer closetfor both units within (e) footprint.
Details
Permit
201803123467
Status
complete
Filed
Mar 12, 2018
Permit issued
Jan 29, 2019
Final sign-off
Nov 8, 2019
Declared cost
$200,000
Address
218 Anza St

demo (e) unpermitted rear sunroom of unit# 218 & deteriorated wood deck of unit# 220. new 2 story, rear addition to be new great room for both units. renovate (e) kitchen & (e) full bath & add 2nd bedroom. washer & dryer closetfor both units within (e) footprint.

Open the permit page

$200,000