Moroso Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Sep 2026
- Last 24 months
- 22 permits filed
551 permits since 2000: 446 completed, 14 in progress, 47 never finaled, 44 expired or cancelled.
Of the 47 never-finaled permits, 9 are 3 to 5 years old, 15 are 5 to 10 years old, 23 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Roof deck permits
8 roof deck permits: 6 completed, 1 never finaled, 1 expired or cancelled. Typically 191 days from filing to permit and 496 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 5, 2021 | Never finaled issued Jan 2023, no final | 3045 Pacific Av | addition of roof deck & retractable skylight, new reconfigured patio @ (e) rear yard, minoe excavation/foundation replacement @ mud rm. new sliding door 1/f rear, new window @ front & rear, replace (e) window & swing door @ living rm east facade w/sliding door, new interior stair to replace (e).Details
addition of roof deck & retractable skylight, new reconfigured patio @ (e) rear yard, minoe excavation/foundation replacement @ mud rm. new sliding door 1/f rear, new window @ front & rear, replace (e) window & swing door @ living rm east facade w/sliding door, new interior stair to replace (e). | $700,000 |
| Apr 19, 2013 | Completed final sign-off Mar 2017 | 2510 Jackson St | convert (e) entry roof into conditioned bathroom @ 3rd fl. raise (e) roofline of rear facing dormer @ 3rd fl office. widen (e) garage door to allow 2 cars to park. (n) west facing dormer over (e) 3rd fl stair. (n) retractable skylight of (n) roof deck @ (e) flat roof. new lap pool and spa at lwr lvlDetails
convert (e) entry roof into conditioned bathroom @ 3rd fl. raise (e) roofline of rear facing dormer @ 3rd fl office. widen (e) garage door to allow 2 cars to park. (n) west facing dormer over (e) 3rd fl stair. (n) retractable skylight of (n) roof deck @ (e) flat roof. new lap pool and spa at lwr lvl | $500,000 |
| Dec 27, 2012 | Completed final sign-off May 2015 | 2619 Laguna St | remodel (e) 4th fl w/ 2 (n) bathrooms, office, 2 bedrooms, (n) exterior stair to (n) roof deck, (n) dormers, remodel (e) stair to 3rd fl. sprinklers under separate permit.Details
remodel (e) 4th fl w/ 2 (n) bathrooms, office, 2 bedrooms, (n) exterior stair to (n) roof deck, (n) dormers, remodel (e) stair to 3rd fl. sprinklers under separate permit. | $215,000 |
| Jan 23, 2012 | Expired or cancelled withdrawn Mar 2016 | 3732 20th St | addition of roof deck at 4th floor over existing 3rd floor sunroom.Details
addition of roof deck at 4th floor over existing 3rd floor sunroom. | $3,500 |
| Oct 12, 2011 | Completed final sign-off Aug 2012 | 1 Montague Pl | revision to approved pa# 2007.01.30.2873. new guard rail at roof deckDetails
revision to approved pa# 2007.01.30.2873. new guard rail at roof deck | |
| Mar 1, 2011 | Completed final sign-off Dec 2013 | 3410 Jackson St | revision to #201011195293: replace (e) interior stairs, new elevator, new lighting. 1st flr- relocate (e) bathrm, renovate office,storage sp,relocate garage fr side to front,new curb cut for garage. 2nd flr-new wet bar. 3rd flr-relcoate master closet, new windows,laundry. 4th flr-new roof deck.Details
revision to #201011195293: replace (e) interior stairs, new elevator, new lighting. 1st flr- relocate (e) bathrm, renovate office,storage sp,relocate garage fr side to front,new curb cut for garage. 2nd flr-new wet bar. 3rd flr-relcoate master closet, new windows,laundry. 4th flr-new roof deck. | $385,000 |
| Jul 13, 2009 | Completed final sign-off Jan 2011 | 1941 Leavenworth St | remove exterior stair structure. build new interior stairway. add new roof deck. alter interior rooms.Details
remove exterior stair structure. build new interior stairway. add new roof deck. alter interior rooms. | $400,000 |
| Apr 29, 2008 | Completed final sign-off Sep 2008 | 352 Lombard St | revision to appl #2008/01/04/1853 to include dryrot repair to rear-north exterior wall from roof to grade. remove fire ladder/stair from 4th floor living room terrace to roof deck per new code. no changes to roof deck.Details
revision to appl #2008/01/04/1853 to include dryrot repair to rear-north exterior wall from roof to grade. remove fire ladder/stair from 4th floor living room terrace to roof deck per new code. no changes to roof deck. | $20,000 |