Back to bathroom remodel contractors
Moroso Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Sep 2026
- Last 24 months
- 22 permits filed
551 permits since 2000: 446 completed, 14 in progress, 47 never finaled, 44 expired or cancelled.
Of the 47 never-finaled permits, 9 are 3 to 5 years old, 15 are 5 to 10 years old, 23 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
108 bathroom remodel permits: 92 completed, 10 never finaled, 6 expired or cancelled. Typically 1 days from filing to permit and 232 days from permit to final inspection.
Showing the 100 most recent of 108.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2025 | Completed final sign-off May 2026 | 1325 37th Av | revision 202502049663- delete scope of work on 3rd floor to divide bedroom and remove walls. delete (n) bathroom and windows and remove wall at 2nd floor kitchen and revise structural beamDetails
revision 202502049663- delete scope of work on 3rd floor to divide bedroom and remove walls. delete (n) bathroom and windows and remove wall at 2nd floor kitchen and revise structural beam | |
| May 1, 2025 | Completed final sign-off Dec 2025 | 378 Cumberland St | interior remodel of kitchen, primary bath, primary closet, and 2nd floor ceilings. scope to include replacement of casework, stone, and tile. plumbing and lighting fixtures in kind. sleeping areas will not be altered.Details
interior remodel of kitchen, primary bath, primary closet, and 2nd floor ceilings. scope to include replacement of casework, stone, and tile. plumbing and lighting fixtures in kind. sleeping areas will not be altered. | $250,000 |
| Aug 22, 2024 | Completed final sign-off Sep 2026 | 3669 21st St | revision to pa# 202012281772 s3 to document non-structural, bathroom layout changes at first floor.Details
revision to pa# 202012281772 s3 to document non-structural, bathroom layout changes at first floor. | |
| May 15, 2023 | Completed final sign-off Jul 2024 | 1020 Vallejo St | unit 7: kitchen, primary bath and powder room remodel. replace all finishes and fixtures in kind. no layout changeDetails
unit 7: kitchen, primary bath and powder room remodel. replace all finishes and fixtures in kind. no layout change | $100,000 |
| Jul 19, 2022 | Completed final sign-off Nov 2023 | 2250 Vallejo St | interior remodel of kitchen & 2 half baths for an (e) main residence in a 2 unit bldg. no increase of bldg area or lot coverage is proposed. all work is confined within (e) bldg footage. no exterior work, no structural demo.Details
interior remodel of kitchen & 2 half baths for an (e) main residence in a 2 unit bldg. no increase of bldg area or lot coverage is proposed. all work is confined within (e) bldg footage. no exterior work, no structural demo. | $50,000 |
| Jun 3, 2022 | Never finaled issued Jun 2022, no final | 1988 Jackson St | replacement of ext stucco finish layer in kind. replacement of int. finishes in kind. including minor plumbing fixtures replacement in 5 bathrooms and light fixture replacement. no relocation of plumbing or electrical fixtures.Details
replacement of ext stucco finish layer in kind. replacement of int. finishes in kind. including minor plumbing fixtures replacement in 5 bathrooms and light fixture replacement. no relocation of plumbing or electrical fixtures. | $300,000 |
| May 23, 2022 | Never finaled issued Apr 2023, no final | 225 Moncada Wy | basement remodel and addition. (n) bathroom, electrical, foundation, structural, deck at 1st floor, rebuild 1st floor laundry room.Details
basement remodel and addition. (n) bathroom, electrical, foundation, structural, deck at 1st floor, rebuild 1st floor laundry room. | $200,000 |
| Mar 11, 2022 | Completed final sign-off Nov 2022 | 2006 Washington St | managers apartment basement - interior renovation includes new storage remove 1 bath, relocate bedroom, kitchen and bath remodel.Details
managers apartment basement - interior renovation includes new storage remove 1 bath, relocate bedroom, kitchen and bath remodel. | $60,000 |
| Apr 7, 2021 | Never finaled issued May 2021, no final | 1250 Jones St | unit 1501: interior renovation includes kitchen and 2 bath remodel. relocate (e) fireplace appliance. reconfigure non structural interior partition walls to proposed layout. all (e) exterior openings to remain unchanged.Details
unit 1501: interior renovation includes kitchen and 2 bath remodel. relocate (e) fireplace appliance. reconfigure non structural interior partition walls to proposed layout. all (e) exterior openings to remain unchanged. | $65,000 |
| Apr 1, 2021 | Never finaled issued May 2021, no final | 1250 Jones St | unit 1602: renovation work includes non structural reconfiguration of partitions, kitchen and bath remodel, and removal of 1 bathroom. interior only work with no alteration to structural or rated construction.Details
unit 1602: renovation work includes non structural reconfiguration of partitions, kitchen and bath remodel, and removal of 1 bathroom. interior only work with no alteration to structural or rated construction. | $180,000 |
| Oct 31, 2019 | Completed final sign-off Feb 2021 | 2160 Green St | rear building: interior remodel of music room +/-250 sq. ft, bathroom +/-80 sq. ft., small kitchen +/-18 sq. ft.Details
rear building: interior remodel of music room +/-250 sq. ft, bathroom +/-80 sq. ft., small kitchen +/-18 sq. ft. | $75,000 |
| Jul 23, 2019 | Completed final sign-off Jul 2021 | 378 Cumberland St | int reno - removal of non bearing wall addition of 1 powder room, new millwork updated finishes throughout replace (e) fixtures in (e) bathroom & kitchenDetails
int reno - removal of non bearing wall addition of 1 powder room, new millwork updated finishes throughout replace (e) fixtures in (e) bathroom & kitchen | $150,000 |
| Mar 29, 2019 | Completed final sign-off Oct 2019 | 2355 Vallejo St | replace finishes at (3) bathrooms. reface kitchen cabinetsDetails
replace finishes at (3) bathrooms. reface kitchen cabinets | $500,000 |
| Dec 3, 2018 | Expired or cancelled expired Mar 2020 | 181 Fremont St | unit 69a interior remodel of kitchen laundry room, master suite, bedrooms, bathrooms, study & library. work includes reconfiguration non structural partitions ceiling, flooring finishes & finishes.maher n/a.Details
unit 69a interior remodel of kitchen laundry room, master suite, bedrooms, bathrooms, study & library. work includes reconfiguration non structural partitions ceiling, flooring finishes & finishes.maher n/a. | $360,000 |
| Nov 15, 2018 | Completed final sign-off Feb 2019 | 1020 Vallejo St | rev to pa# 201806202450; as requested by bldg inspector (1) bathroom remodel, kitchen resuracing, opening in shear wall, minor laout changeDetails
rev to pa# 201806202450; as requested by bldg inspector (1) bathroom remodel, kitchen resuracing, opening in shear wall, minor laout change | |
| Sep 18, 2018 | Completed final sign-off May 2019 | 2760 Lyon St | kitchen remodel, new new vanities for 2 bathrooms, new inteiror doors, refinish floors. remodel in-kind.Details
kitchen remodel, new new vanities for 2 bathrooms, new inteiror doors, refinish floors. remodel in-kind. | $400,000 |
| Aug 28, 2018 | Completed final sign-off Sep 2021 | 8 Russian Hill Pl | renovation of 2 (e) bathrooms & kitchen, no alteration of walls, windows. or structural. update furnishes throughout, including flooring.Details
renovation of 2 (e) bathrooms & kitchen, no alteration of walls, windows. or structural. update furnishes throughout, including flooring. | $250,000 |
| Jun 20, 2018 | Completed final sign-off Feb 2019 | 1020 Vallejo St | 1 kitchen resurfacing 7 2 bathrooms resurfacing . no change of existing floor planDetails
1 kitchen resurfacing 7 2 bathrooms resurfacing . no change of existing floor plan | |
| Jan 8, 2018 | Never finaled issued Jan 2018, no final | 526 Duncan St | renovation of two existing bathrooms and kitchen, including cabinets, counters, tile and fixtures. replace firepalce surround. remove entry seating and add millwork. no alteration of wall, window and door.Details
renovation of two existing bathrooms and kitchen, including cabinets, counters, tile and fixtures. replace firepalce surround. remove entry seating and add millwork. no alteration of wall, window and door. | $200,000 |
| Dec 19, 2017 | Completed final sign-off Jul 2018 | 1 Enterprise St | bathroom renovation 2nd & 3rd floor, (1) kitchen cabinet reface, new flooring in kitchen and 3rd floor bedroom. total (3) bathroom work & (1) kitchen. no change in (e) layout. maher naDetails
bathroom renovation 2nd & 3rd floor, (1) kitchen cabinet reface, new flooring in kitchen and 3rd floor bedroom. total (3) bathroom work & (1) kitchen. no change in (e) layout. maher na | $50,000 |
| Apr 4, 2017 | Completed final sign-off Oct 2018 | 3741 Broderick St | renovation to floors 1-3 with non visible interior lightwell infill at floors 2 & 3. partial existing window upgrade. new elevator & sprinklers throughout. renovate 2 bedrooms & bathroom @ 1st floor, kitchen & bathroom 2nd floor, & 2 bathrooms on 3rd floor.Details
renovation to floors 1-3 with non visible interior lightwell infill at floors 2 & 3. partial existing window upgrade. new elevator & sprinklers throughout. renovate 2 bedrooms & bathroom @ 1st floor, kitchen & bathroom 2nd floor, & 2 bathrooms on 3rd floor. | $350,000 |
| Mar 13, 2017 | Never finaled issued Jun 2021, no final | 443 Folsom St | change of use & tenant improvement for new cannabis retailer. work to include bathroom, finishes, cabinetry & structural improvements (roof, wall framing, foundation)Details
change of use & tenant improvement for new cannabis retailer. work to include bathroom, finishes, cabinetry & structural improvements (roof, wall framing, foundation) | $120,000 |
| Jul 28, 2016 | Completed final sign-off Mar 2017 | 1184 Harrison St | revision to 201604296144, and to add new work.structural & mechanical work is added to the project &the prior permitted work (bathrooms, breakroom,stairs)is to be re-arranged.an additional stair,corridor & under 2nd floor is added; maher n/a; proposed trade shop use "moroso construction"Details
revision to 201604296144, and to add new work.structural & mechanical work is added to the project &the prior permitted work (bathrooms, breakroom,stairs)is to be re-arranged.an additional stair,corridor & under 2nd floor is added; maher n/a; proposed trade shop use "moroso construction" | $100,000 |
| May 27, 2016 | Completed final sign-off Oct 2016 | 247 Seacliff Av | remodel of 2 existing bathrooms in a single family residence. work shall also include the demo and replacement of select exterior doors and window on the 2nd fl not visible from the street.Details
remodel of 2 existing bathrooms in a single family residence. work shall also include the demo and replacement of select exterior doors and window on the 2nd fl not visible from the street. | $100,000 |
| Jan 29, 2016 | Completed final sign-off Feb 2017 | 2288 Broadway | unit #4: all existing exterior windows to be replaced in kind. remodel kitchen: appliances and plumbing fixtures to remain in extg locations. remodel bathrooms, minor partition work at non-bearing walls in living room, bedroom 1,bedroom 2, and master bedroom new lighting.Details
unit #4: all existing exterior windows to be replaced in kind. remodel kitchen: appliances and plumbing fixtures to remain in extg locations. remodel bathrooms, minor partition work at non-bearing walls in living room, bedroom 1,bedroom 2, and master bedroom new lighting. | $450,000 |
| Sep 24, 2015 | Completed final sign-off Oct 2017 | 2006 Washington St | #10 - reconfigure interior partition walls per proposed plan. remodel kitchen & all bathrooms & add half bath. all exterior openings (existing) to remain unchanged.Details
#10 - reconfigure interior partition walls per proposed plan. remodel kitchen & all bathrooms & add half bath. all exterior openings (existing) to remain unchanged. | $500,000 |
| Jul 7, 2015 | Completed final sign-off Apr 2016 | 3233 Pacific Av | relocate existing mechanical room, finish existing mech rm as media rm, add shower to (e) bathrm,add half bath,remodel (e)laundry & wet bar,new plumbing fixtures,washer & dryer & cabinets; ground floor window replacement only. maher n/aDetails
relocate existing mechanical room, finish existing mech rm as media rm, add shower to (e) bathrm,add half bath,remodel (e)laundry & wet bar,new plumbing fixtures,washer & dryer & cabinets; ground floor window replacement only. maher n/a | $52,000 |
| May 27, 2015 | Completed final sign-off Dec 2016 | 2500 Divisadero St | new gas fire place direct vent ul listed. kitchen counters, 3 bath remodel, replace light fixtures throughout, add firepit to fountain location. no interior wall alteration. no structural work.Details
new gas fire place direct vent ul listed. kitchen counters, 3 bath remodel, replace light fixtures throughout, add firepit to fountain location. no interior wall alteration. no structural work. | $400,000 |
| May 11, 2015 | Completed final sign-off Mar 2016 | 8 03rd Av | interior: alterations at 1/f & 2/f include kitchen & bath. replace furnaces, water heater, revise lighting. exterior: replace windows & doors, new roofing, repair/replace parapet. extend (e) deck @ rear. seperate permit for bay addition, pa#201502027191Details
interior: alterations at 1/f & 2/f include kitchen & bath. replace furnaces, water heater, revise lighting. exterior: replace windows & doors, new roofing, repair/replace parapet. extend (e) deck @ rear. seperate permit for bay addition, pa#201502027191 | $300,000 |
| May 7, 2015 | Completed final sign-off Nov 2015 | 3296 Sacramento St | ti & remodel of storefront facade. change of use from bank to retail. eliminate 1 restroom, create storage area. 1 bathroom to become unisex. remove interior wall. strong wall.Details
ti & remodel of storefront facade. change of use from bank to retail. eliminate 1 restroom, create storage area. 1 bathroom to become unisex. remove interior wall. strong wall. | $65,000 |
| Apr 16, 2015 | Completed final sign-off Sep 2015 | 42 Chenery St | remodel 2 master baths, 1 at 3rd level, 1 at 4th lvel, install pull ou pantry cabinet under stair adjacent to kitchen. remove and replace existig deck railings at all exterior decks with new glass and metal support rails to match existing. no envelope change. no added heated spaceDetails
remodel 2 master baths, 1 at 3rd level, 1 at 4th lvel, install pull ou pantry cabinet under stair adjacent to kitchen. remove and replace existig deck railings at all exterior decks with new glass and metal support rails to match existing. no envelope change. no added heated space | $80,000 |
| Oct 3, 2014 | Expired or cancelled withdrawn Jan 2015 | 124 Commonwealth Av | add a bathroom in a storage room in a detached family room- no addition, no structural, no exterior changes. no change in occupancy. garage was converted into detached family room per 201010072519.Details
add a bathroom in a storage room in a detached family room- no addition, no structural, no exterior changes. no change in occupancy. garage was converted into detached family room per 201010072519. | $25,000 |
| Aug 20, 2014 | Completed final sign-off Aug 2015 | 1020 Vallejo St | master bath remodel, new shower pan. kitchen remodel, fixtures to stay in existing locations. reconfigure shear wall. reglaze existing windows (not visable). reconfigure dining room.Details
master bath remodel, new shower pan. kitchen remodel, fixtures to stay in existing locations. reconfigure shear wall. reglaze existing windows (not visable). reconfigure dining room. | $200,000 |
| Jul 28, 2014 | Expired or cancelled expired Jul 2018 | 862 40th Av | remove asbestos siding at rear, finishes basement storage and laundry room, refinish kitchen and powder room at 2nd floor. change layout and finishes to 2 bathrooms at 3rd floor. replace the extg aluminum replacement windows with marvin clad wood windows.Details
remove asbestos siding at rear, finishes basement storage and laundry room, refinish kitchen and powder room at 2nd floor. change layout and finishes to 2 bathrooms at 3rd floor. replace the extg aluminum replacement windows with marvin clad wood windows. | $70,000 |
| Jun 18, 2014 | Completed final sign-off Feb 2015 | 2330 Lyon St | interior remodle within existing bldg, no structural work. interior remodle includes laundry, (n) massage room & bathroom, & new millwork for laundry room. add (n) window @ lyon street facade (ext elevation). relocate (e) windoe @ lyon street ext elevation.Details
interior remodle within existing bldg, no structural work. interior remodle includes laundry, (n) massage room & bathroom, & new millwork for laundry room. add (n) window @ lyon street facade (ext elevation). relocate (e) windoe @ lyon street ext elevation. | $75,000 |
| Jun 3, 2014 | Completed final sign-off Dec 2014 | 1 Cherry St | full remodel of 1 master bathrm, full remodel of 1 kitchen. replacement of finishes in 3 bathrooms, paint and carpet throughout the house. swap out (e) decorative light fixtures in all rooms, repl crown in 2 bedrms, add closet cabinetry to bedrooms; compliance with ord 155-13 not requiredDetails
full remodel of 1 master bathrm, full remodel of 1 kitchen. replacement of finishes in 3 bathrooms, paint and carpet throughout the house. swap out (e) decorative light fixtures in all rooms, repl crown in 2 bedrms, add closet cabinetry to bedrooms; compliance with ord 155-13 not required | $300,000 |
| May 14, 2014 | Completed final sign-off Nov 2014 | 793 Ashbury St | demo existing finishes in two bathrooms and closet. move walls and install new finishes in two bathrooms. bedroom remodel per plan.Details
demo existing finishes in two bathrooms and closet. move walls and install new finishes in two bathrooms. bedroom remodel per plan. | $70,000 |
| Apr 16, 2014 | Completed final sign-off Mar 2017 | 2510 Jackson St | interior renovation at 3rd and 4th fl. work includes reconfiguration of 4 baths and 5 bedrooms. new finishes, casework. no exterior work under this permit. no exterior workDetails
interior renovation at 3rd and 4th fl. work includes reconfiguration of 4 baths and 5 bedrooms. new finishes, casework. no exterior work under this permit. no exterior work | $200,000 |
| Mar 17, 2014 | Completed final sign-off May 2015 | 2619 Laguna St | revision & construction addition to pa #2012.1227.6900 - remodel at 3rd floor for 3 bathroom, master closet, & laundry room. no structural work. compliance with ordinance #155-13 not requiredDetails
revision & construction addition to pa #2012.1227.6900 - remodel at 3rd floor for 3 bathroom, master closet, & laundry room. no structural work. compliance with ordinance #155-13 not required | $146,000 |
| Feb 3, 2014 | Completed final sign-off Mar 2017 | 2510 Jackson St | interior non-structural soft demo of (e) kitchen and bathrooms; work will include demo of fixtures, cabinets, casework, tile & limited exploratory demo in advance of future voluntary structural upgrades and remodelling. no structural work, no exterior work.Details
interior non-structural soft demo of (e) kitchen and bathrooms; work will include demo of fixtures, cabinets, casework, tile & limited exploratory demo in advance of future voluntary structural upgrades and remodelling. no structural work, no exterior work. | $5,000 |
| Jan 8, 2014 | Completed final sign-off Mar 2014 | 80 Fairfield Wy | replace one bathroom in kind on second floor.Details
replace one bathroom in kind on second floor. | $15,000 |
| Aug 9, 2013 | Completed final sign-off Feb 2016 | 47 Moss St | site permit only, change of use from industrial to residential including 3 bedrooms, 1 kitchen, 3.5 baths and vertical extension approx 62"Details
site permit only, change of use from industrial to residential including 3 bedrooms, 1 kitchen, 3.5 baths and vertical extension approx 62" | $1,000,000 |
| Jul 8, 2013 | Completed final sign-off Apr 2014 | 290 Maywood Dr | remove and replace kitchen cabinets, remodel 2 baths, enlarge and remodel master bath for wheelchair access, kitchen approx 15x15, master bath approx 10x8, 2 other approx 8x8Details
remove and replace kitchen cabinets, remodel 2 baths, enlarge and remodel master bath for wheelchair access, kitchen approx 15x15, master bath approx 10x8, 2 other approx 8x8 | $75,753 |
| Jun 20, 2013 | Completed final sign-off Jan 2014 | 2435 Bryant St | ground floor remodel: extg bath, new laundry and storage, new stair. 1st floor: add bath and closet. replace front windows in kind. remodel kitchen. add deck. add skylight.Details
ground floor remodel: extg bath, new laundry and storage, new stair. 1st floor: add bath and closet. replace front windows in kind. remodel kitchen. add deck. add skylight. | $200,000 |
| Jun 6, 2013 | Completed final sign-off Oct 2013 | 4511 25th St | #a- remodel 2 bathrooms in kind.Details
#a- remodel 2 bathrooms in kind. | $20,000 |
| May 21, 2013 | Completed final sign-off Dec 2013 | 2854 Green St | interior renovation of part of 3rd floor. creation of additional bathroom, remodel (e) bathroom, (e) bedroom, relocte laundry area and hallDetails
interior renovation of part of 3rd floor. creation of additional bathroom, remodel (e) bathroom, (e) bedroom, relocte laundry area and hall | $57,680 |
| Apr 26, 2013 | Expired or cancelled cancelled Jan 2026 | 821 Fulton St | add bathroom with 1 toilet, 1 shower, 2 sinks, at 3rd flr unit #821, demo existing interior, non-bearing partition walls, new toilet, new shower, 2 new lavatories, new recessed lighting and electrical receptacles, no drywall, casework, tile, paint, no wood window @ existing openingDetails
add bathroom with 1 toilet, 1 shower, 2 sinks, at 3rd flr unit #821, demo existing interior, non-bearing partition walls, new toilet, new shower, 2 new lavatories, new recessed lighting and electrical receptacles, no drywall, casework, tile, paint, no wood window @ existing opening | $10,000 |
| Apr 19, 2013 | Completed final sign-off Mar 2017 | 2510 Jackson St | convert (e) entry roof into conditioned bathroom @ 3rd fl. raise (e) roofline of rear facing dormer @ 3rd fl office. widen (e) garage door to allow 2 cars to park. (n) west facing dormer over (e) 3rd fl stair. (n) retractable skylight of (n) roof deck @ (e) flat roof. new lap pool and spa at lwr lvlDetails
convert (e) entry roof into conditioned bathroom @ 3rd fl. raise (e) roofline of rear facing dormer @ 3rd fl office. widen (e) garage door to allow 2 cars to park. (n) west facing dormer over (e) 3rd fl stair. (n) retractable skylight of (n) roof deck @ (e) flat roof. new lap pool and spa at lwr lvl | $500,000 |
| Apr 19, 2013 | Completed final sign-off Dec 2013 | 2854 Green St | addition to 3/fl - expansion & renovation of (e) master bath w/ associated electrical & plumbing work.Details
addition to 3/fl - expansion & renovation of (e) master bath w/ associated electrical & plumbing work. | $19,520 |
| Dec 27, 2012 | Completed final sign-off May 2015 | 2619 Laguna St | remodel (e) 4th fl w/ 2 (n) bathrooms, office, 2 bedrooms, (n) exterior stair to (n) roof deck, (n) dormers, remodel (e) stair to 3rd fl. sprinklers under separate permit.Details
remodel (e) 4th fl w/ 2 (n) bathrooms, office, 2 bedrooms, (n) exterior stair to (n) roof deck, (n) dormers, remodel (e) stair to 3rd fl. sprinklers under separate permit. | $215,000 |
| Dec 5, 2012 | Completed final sign-off Jul 2013 | 2207 Pacific Av | replace extg doors interior, casework modification throughout, replace tile in 2 bathrooms, modification of slab stone at entry way,shelf, vanities, and bathroom walls.drywall patches to accomodate with lighting location. no new lighting in kitchen. lighting must comply with cec 150 k.Details
replace extg doors interior, casework modification throughout, replace tile in 2 bathrooms, modification of slab stone at entry way,shelf, vanities, and bathroom walls.drywall patches to accomodate with lighting location. no new lighting in kitchen. lighting must comply with cec 150 k. | $20,000 |
| Jul 16, 2012 | Completed final sign-off Sep 2012 | 301 Mission St | apt. # 46c: redo kitchen, livingroom, hallwya, laundry room, bathroom, bedrooms and closet lighting and electrical as reqd. trenching and drywall as reqd. drywall ceilings of bedrooms and living room.Details
apt. # 46c: redo kitchen, livingroom, hallwya, laundry room, bathroom, bedrooms and closet lighting and electrical as reqd. trenching and drywall as reqd. drywall ceilings of bedrooms and living room. | $60,000 |
| Jul 13, 2012 | Completed final sign-off Aug 2012 | 662 12th Av | remove bath tub, tile existing tub and add floor drain, bathroom on 2/f.Details
remove bath tub, tile existing tub and add floor drain, bathroom on 2/f. | $8,000 |
| Jun 15, 2012 | Completed final sign-off Aug 2012 | 250 Mullen Av | bathroom renovation, update tile, fixtures & cabinets, some electrical work, all plumbing fixtures to remain in same place. roofing: replace 3 skylights in kind, remove (e) built up roofing and install 2 ply firestone app membrane. newly installed skylight u-factor 0.40. cec151-cDetails
bathroom renovation, update tile, fixtures & cabinets, some electrical work, all plumbing fixtures to remain in same place. roofing: replace 3 skylights in kind, remove (e) built up roofing and install 2 ply firestone app membrane. newly installed skylight u-factor 0.40. cec151-c | $35,000 |
| Jan 23, 2012 | Completed final sign-off Feb 2013 | 2 Everson St | infill at rear for construction of new gym space and 1/2 bath. approx 480 sf within basement level of single family residenceDetails
infill at rear for construction of new gym space and 1/2 bath. approx 480 sf within basement level of single family residence | $42,000 |
| Oct 6, 2011 | Completed final sign-off Jun 2012 | 3734 20th St | remodel 3rd floor aptmnt unit; re-framing of non bearing interior partition walls, drywall & interior trim, paint. complete plumbing of bathroom, kitchen & water heater. electrical, trim out, 2 new windows at rear elevationDetails
remodel 3rd floor aptmnt unit; re-framing of non bearing interior partition walls, drywall & interior trim, paint. complete plumbing of bathroom, kitchen & water heater. electrical, trim out, 2 new windows at rear elevation | $35,000 |
| Oct 6, 2011 | Completed final sign-off Dec 2011 | 582 06th St | interior remodel thoughout: upgrade two bathrooms to ada compliancy; one (n) bathroom; (n) partition wall (1-hour); minor interior non-bearing partitions; remodel breakroom area and kitchenette.Details
interior remodel thoughout: upgrade two bathrooms to ada compliancy; one (n) bathroom; (n) partition wall (1-hour); minor interior non-bearing partitions; remodel breakroom area and kitchenette. | $62,000 |
| Sep 12, 2011 | Never finaled issued Oct 2011, no final | 249 Cherry St | revision to app#201106148050 and 200502145414. new work includes demo and reconfiguration of interior walls at basement level, widening of garage at basement level, new 2 bath rooms and bedroom at basement with no direct access to street.Details
revision to app#201106148050 and 200502145414. new work includes demo and reconfiguration of interior walls at basement level, widening of garage at basement level, new 2 bath rooms and bedroom at basement with no direct access to street. | $60,000 |
| Sep 9, 2011 | Completed final sign-off Dec 2011 | 1659 Grove St | remodel kitchen and bath in-kind in upper unit 1659. no structural work. remove old brick chimney in dining room. upgrade electrical. install new garage overhead door. install new forced air furnace. install new range hood and hard-wired smoke detectors.Details
remodel kitchen and bath in-kind in upper unit 1659. no structural work. remove old brick chimney in dining room. upgrade electrical. install new garage overhead door. install new forced air furnace. install new range hood and hard-wired smoke detectors. | $21,500 |
| Sep 2, 2011 | Completed final sign-off Sep 2012 | 1750 Taylor St | interior non structural improvement of apartment. plmg,mech, and elec work to be covered by seperate permit. construction includes bldg rooms for bathrooms, kitchen and bedroom.Details
interior non structural improvement of apartment. plmg,mech, and elec work to be covered by seperate permit. construction includes bldg rooms for bathrooms, kitchen and bedroom. | $500,000 |
| Aug 16, 2011 | Completed final sign-off Feb 2013 | 2 Everson St | 1st.flr.;(n) layout incl. (n) full bath, sauna, clos, expanded deck+(n) finishes/fixtures @ deck kit.; 2nd.flr.;remodel master bath, (n) cabinetry, (n) tile in 2-baths; 3rd.flr.;remodel kit., half-bath. (n) clo.; some (n) ext. windows+doors, (n) interior doors, (n) glassblock wdw. @ west garage.Details
1st.flr.;(n) layout incl. (n) full bath, sauna, clos, expanded deck+(n) finishes/fixtures @ deck kit.; 2nd.flr.;remodel master bath, (n) cabinetry, (n) tile in 2-baths; 3rd.flr.;remodel kit., half-bath. (n) clo.; some (n) ext. windows+doors, (n) interior doors, (n) glassblock wdw. @ west garage. | $230,000 |
| Jul 19, 2011 | Completed final sign-off Dec 2011 | 3659 Washington St | revision to 201105166135(new counters, warming drawer,coffeemaker, built in desk in kitchen. new finishes in master bath. insulation, new layout for wine room. add bar to dining room area). to correct address and lot and block #'s from 3569 washington st (0995 017) to 3659 washington st (0994 018).Details
revision to 201105166135(new counters, warming drawer,coffeemaker, built in desk in kitchen. new finishes in master bath. insulation, new layout for wine room. add bar to dining room area). to correct address and lot and block #'s from 3569 washington st (0995 017) to 3659 washington st (0994 018). | |
| Jun 10, 2011 | Completed final sign-off Oct 2011 | 156 Madrone Av | remodel of existing guest room & bath at 2nd floor rear. no structural changes.Details
remodel of existing guest room & bath at 2nd floor rear. no structural changes. | $25,000 |
| Jun 6, 2011 | Completed final sign-off Oct 2011 | 1980 Vallejo St | revision to pa# 2011-0302-1210-relocate walls at kitchen & laundry room. remove 1 bathroom documentation from previous permit (3) (e) baths only)Details
revision to pa# 2011-0302-1210-relocate walls at kitchen & laundry room. remove 1 bathroom documentation from previous permit (3) (e) baths only) | $2,000 |
| Jun 3, 2011 | Completed final sign-off Sep 2011 | 302 Eureka St | remodel 2-upstairs baths; no struct. changes. provide high efficency lighting or "manual on" occupancy sensor.Details
remodel 2-upstairs baths; no struct. changes. provide high efficency lighting or "manual on" occupancy sensor. | $57,500 |
| May 16, 2011 | Expired or cancelled cancelled Jul 2011 | 3569 Washington St | new counters, warming drawer, coffee maker and build in desk in kitchen. install new finishes in master bath. install insulation and new layout for wine room. add bar to dining room areal. lighting to comply with cec 150k.Details
new counters, warming drawer, coffee maker and build in desk in kitchen. install new finishes in master bath. install insulation and new layout for wine room. add bar to dining room areal. lighting to comply with cec 150k. | $15,000 |
| Apr 14, 2011 | Never finaled issued Apr 2011, no final | 114 12th Av | infill of open space on 1st floor under occupied 2nd floor areas above. new bedroom, laundry, bath, and remodel of 2nd fl kitchen and bathDetails
infill of open space on 1st floor under occupied 2nd floor areas above. new bedroom, laundry, bath, and remodel of 2nd fl kitchen and bath | $100,000 |
| Mar 30, 2011 | Completed final sign-off Sep 2011 | 302 Eureka St | 2nd fl: ex laundry room to be converted to home office with new double pane exterior doors, windows and skylight existing bath to be converted to home office. existing wc to be converted to powder room with n handwash basin. new lighting added, e bldg envelope to remain.all at rearDetails
2nd fl: ex laundry room to be converted to home office with new double pane exterior doors, windows and skylight existing bath to be converted to home office. existing wc to be converted to powder room with n handwash basin. new lighting added, e bldg envelope to remain.all at rear | $12,500 |
| Mar 2, 2011 | Completed final sign-off Oct 2011 | 1980 Vallejo St | remodel (e) kitchen & 3 baths; no structural changes, nw. bathroom to remain unchangedDetails
remodel (e) kitchen & 3 baths; no structural changes, nw. bathroom to remain unchanged | $20,000 |
| Mar 2, 2011 | Completed final sign-off May 2011 | 2169 Green St | unit 1- 1st fl. master bath remodel. remove (e) finishes and fixtures. saw cut (e) conc.foundation and lower floor of bathrm to make flush w/ adjacent bedrm. pour new concrete slab fl. drywall, paint and tile fl and walls. install new sink and tubDetails
unit 1- 1st fl. master bath remodel. remove (e) finishes and fixtures. saw cut (e) conc.foundation and lower floor of bathrm to make flush w/ adjacent bedrm. pour new concrete slab fl. drywall, paint and tile fl and walls. install new sink and tub | $21,000 |
| Feb 4, 2011 | Completed final sign-off Sep 2011 | 875 El Camino Del Mar | revision to (e) permit#201010012085. remodel 3-(e) bathrooms, (n) walls to create water closet, 2-(n) fixtures and finish surfaces. remodel kitchen (n) appliances & cabinets, (n) finish surfaces.Details
revision to (e) permit#201010012085. remodel 3-(e) bathrooms, (n) walls to create water closet, 2-(n) fixtures and finish surfaces. remodel kitchen (n) appliances & cabinets, (n) finish surfaces. | $110,000 |
| Jan 5, 2011 | Completed final sign-off Jun 2011 | 2651 Green St | reface of 1 kitchen & 1 master bathroom - all fixtures and finishes, locations to remain as existing. replace with new and per current codes and requirement. no change to walls window or door, lighting to comply with cec 150(k)Details
reface of 1 kitchen & 1 master bathroom - all fixtures and finishes, locations to remain as existing. replace with new and per current codes and requirement. no change to walls window or door, lighting to comply with cec 150(k) | $100,000 |
| Nov 19, 2010 | Completed final sign-off Jan 2014 | 3410 Jackson St | remove & replace (remodel) master bathroom & kid's bathroom on 2nd floor. no structural changes. remodel kitchen & powder room on main level with new fixtures & finishes.Details
remove & replace (remodel) master bathroom & kid's bathroom on 2nd floor. no structural changes. remodel kitchen & powder room on main level with new fixtures & finishes. | $73,000 |
| Oct 1, 2010 | Completed final sign-off Sep 2011 | 875 El Camino Del Mar | remodel living rm, dining rm & entry incl. lighting, wood paneling & cabinetry & adding a gas fireplace. no structural work. remodel master bath & powder rm incl. new plumbing fixtures in existing locations, new finishes, find & fix leaks in remaining 3 bathrooms. no new wall or wall relocation.Details
remodel living rm, dining rm & entry incl. lighting, wood paneling & cabinetry & adding a gas fireplace. no structural work. remodel master bath & powder rm incl. new plumbing fixtures in existing locations, new finishes, find & fix leaks in remaining 3 bathrooms. no new wall or wall relocation. | $82,500 |
| Sep 23, 2010 | Completed final sign-off Nov 2012 | 840 Powell St | install mini split ac system w' heads. replace laundry rm cans and occup. switch. replace south western baths cans and occup. switchDetails
install mini split ac system w' heads. replace laundry rm cans and occup. switch. replace south western baths cans and occup. switch | $3,500 |
| Sep 15, 2010 | Completed final sign-off Sep 2012 | 456 Belvedere St | horizontal addition with roof terrace at the rear of an existing single family residence, bathroom & kitchen remodel. exterior work at rear elevation.Details
horizontal addition with roof terrace at the rear of an existing single family residence, bathroom & kitchen remodel. exterior work at rear elevation. | $100,000 |
| Sep 14, 2010 | Completed final sign-off Sep 2011 | 4338 24th St | remove & replace (e) bath finishes, patch roof leak over bath & replace (e) skylight in kind. no structural work. bath remodel.Details
remove & replace (e) bath finishes, patch roof leak over bath & replace (e) skylight in kind. no structural work. bath remodel. | $5,000 |
| Sep 9, 2010 | Completed final sign-off May 2011 | 124 Commonwealth Av | remodel 3rd floor bathroom & new dormer.Details
remodel 3rd floor bathroom & new dormer. | $24,700 |
| Jun 23, 2010 | Completed final sign-off Feb 2011 | 456 Belvedere St | revision to pa# 2010.04.22.0900. replace 2 windows in master bath room with new aluminium unitsDetails
revision to pa# 2010.04.22.0900. replace 2 windows in master bath room with new aluminium units | $1,000 |
| May 26, 2010 | Completed final sign-off Feb 2011 | 1659 Grove St | in front; remove 7-alum. slider & 6-sgdh & replace w/ dgdh windows. replace 2-bath windows w/fiberglass in rear not visible from street. replace 12 windows in-kind & 1-door. install trench drain @ garage door & replace sewer line to curb/house trap. windows u=.30.Details
in front; remove 7-alum. slider & 6-sgdh & replace w/ dgdh windows. replace 2-bath windows w/fiberglass in rear not visible from street. replace 12 windows in-kind & 1-door. install trench drain @ garage door & replace sewer line to curb/house trap. windows u=.30. | $40,000 |
| Apr 22, 2010 | Completed final sign-off Feb 2011 | 456 Belvedere St | interior remodel of 2nd bedroom level. addition of 1 new bathroom. no proposed exterior work. remove interior elevator. no changes to square footage.Details
interior remodel of 2nd bedroom level. addition of 1 new bathroom. no proposed exterior work. remove interior elevator. no changes to square footage. | $35,000 |
| Apr 5, 2010 | Completed final sign-off Jan 2011 | 62 06th Av | unit#1(64-6th. ave.) kitchen & bath remodel reconfiguration of int. walls. unit#2(62-6th. ave.) new bath-reconfiguration of int. walls, window replacement. all to match (e).Details
unit#1(64-6th. ave.) kitchen & bath remodel reconfiguration of int. walls. unit#2(62-6th. ave.) new bath-reconfiguration of int. walls, window replacement. all to match (e). | $150,000 |
| Dec 1, 2009 | Completed final sign-off Mar 2010 | 247 Seacliff Av | revision to appl #200908074344: additional master bedroom & bathroom remodel involving new vaulted ceiling & elimination of existing shower, minor structural revision. minor window/door size change not visible from street.Details
revision to appl #200908074344: additional master bedroom & bathroom remodel involving new vaulted ceiling & elimination of existing shower, minor structural revision. minor window/door size change not visible from street. | $10,000 |
| Oct 15, 2009 | Completed final sign-off Mar 2010 | 1940 Broadway | unit 1w - remodel 2-bathrooms. relocate master bedroom door. create larger doorways in non-bearing wall @ storage. re-finish floors & floors & minor re-working of (e) surface mounted electrical. no structural work. no work visible from building exterior.Details
unit 1w - remodel 2-bathrooms. relocate master bedroom door. create larger doorways in non-bearing wall @ storage. re-finish floors & floors & minor re-working of (e) surface mounted electrical. no structural work. no work visible from building exterior. | $80,000 |
| Nov 17, 2008 | Completed final sign-off Sep 2009 | 140 San Pablo Av | install non-structural walls to sub-divide (e) conditioned space. renovate (e) bathroom, relocate washer/dryer & seal off (e) window @ guest bedroom/office, replace bath window same size locationDetails
install non-structural walls to sub-divide (e) conditioned space. renovate (e) bathroom, relocate washer/dryer & seal off (e) window @ guest bedroom/office, replace bath window same size location | $25,000 |
| Jul 22, 2008 | Completed final sign-off Jun 2009 | 1250 Jones St | revision to application 200807166858. interior remodel of residential condo including kitchen 2 bathrooms, bar area and common space. no structural work.Details
revision to application 200807166858. interior remodel of residential condo including kitchen 2 bathrooms, bar area and common space. no structural work. | $100,000 |
| Jul 16, 2008 | Completed final sign-off Jun 2009 | 1250 Jones St | #1601: interior remodel including 1 bathroom, 1 wet bar, 1 storage room, 1 water closet & 1 kitchen. no sttructural work. interior demo of cabinets, doors, trim, flooring & fixtures, walls, framing & drywall to remain. balance of work under seperate permit.Details
#1601: interior remodel including 1 bathroom, 1 wet bar, 1 storage room, 1 water closet & 1 kitchen. no sttructural work. interior demo of cabinets, doors, trim, flooring & fixtures, walls, framing & drywall to remain. balance of work under seperate permit. | $100,000 |
| Jun 18, 2008 | Completed final sign-off Aug 2008 | 46 Lloyd St | work @ unit# 4 only. remodel bathroom. replace in kind to repair leak & dry rot. no structural work. new lighting to be high efficiency or manual on auto off switch.Details
work @ unit# 4 only. remodel bathroom. replace in kind to repair leak & dry rot. no structural work. new lighting to be high efficiency or manual on auto off switch. | $12,000 |
| Jun 12, 2008 | Completed final sign-off Mar 2009 | 140 San Pablo Av | renovate bathrooms on 2nd floor, add roof over lightwell, replace bathroom windowDetails
renovate bathrooms on 2nd floor, add roof over lightwell, replace bathroom window | $35,000 |
| Aug 28, 2007 | Completed final sign-off May 2008 | 156 Madrone Av | renovate (e) 2nd floor kitchen, 3rd floor bedroom & 3rd floor bathroom. remove kitchen wall & replace per buscovitch eng: 2 steel beams (1st & 2nd floor) & door headers.Details
renovate (e) 2nd floor kitchen, 3rd floor bedroom & 3rd floor bathroom. remove kitchen wall & replace per buscovitch eng: 2 steel beams (1st & 2nd floor) & door headers. | $50,000 |
| Jun 7, 2007 | Never finaled issued Jun 2007, no final | 1353 04th Av | construct new bathroom within existing basement storage area.Details
construct new bathroom within existing basement storage area. | $25,000 |
| Oct 13, 2006 | Completed final sign-off Apr 2007 | 355 Bryant St | reframe kchn pantry and coat closet, add island cabinet to kchn, reframe extg stair to mezzanine, add 5/8" type sheet rock to exposed cieling/kchn bath renovation under permit #200609081740Details
reframe kchn pantry and coat closet, add island cabinet to kchn, reframe extg stair to mezzanine, add 5/8" type sheet rock to exposed cieling/kchn bath renovation under permit #200609081740 | $20,000 |
| Sep 8, 2006 | Completed final sign-off Apr 2007 | 355 Bryant St | renovate (e) kitchen-no plan changes (new cabinets/electric, plumbing locations to remain) 51% lighting to be high-efficacy. renovate 2 (e) bathrooms withing (e) locations new lighting to be controlled by occupancy sensor). finishes/fixtures/electric, plumbing locations to remain. electrical updatesDetails
renovate (e) kitchen-no plan changes (new cabinets/electric, plumbing locations to remain) 51% lighting to be high-efficacy. renovate 2 (e) bathrooms withing (e) locations new lighting to be controlled by occupancy sensor). finishes/fixtures/electric, plumbing locations to remain. electrical updates | $60,000 |
| Jun 1, 2006 | Completed final sign-off Oct 2006 | 250 Mullen Av | remove partial interior wall per plans, add new french door at rear, renovate (e) bathroom, add island cabinet in kitchen. no change to building facade visible to street.Details
remove partial interior wall per plans, add new french door at rear, renovate (e) bathroom, add island cabinet in kitchen. no change to building facade visible to street. | $45,000 |
| Apr 3, 2006 | Completed final sign-off Apr 2008 | 2290 Vallejo St | remove and replace plumbing fixtures & tile in (e) locations at 3rd flr guest bathroom and 3rd fl master bedroom.no changes to partitions or windows).Details
remove and replace plumbing fixtures & tile in (e) locations at 3rd flr guest bathroom and 3rd fl master bedroom.no changes to partitions or windows). | $30,000 |
| Dec 5, 2005 | Completed final sign-off Jul 2006 | 1353 04th Av | revise 200510196030. layout alterations to prior permitted design at garage level, add waste line & drain below floor for future bathroom.Details
revise 200510196030. layout alterations to prior permitted design at garage level, add waste line & drain below floor for future bathroom. | $1,000 |
| Oct 19, 2005 | Completed final sign-off Jul 2006 | 1353 04th Av | add laundry room at garage level, new finish floor at garage level, renovate kitchen, powder room at 1st flr, renovate guest bath, master bath, master bedroom, master closet on 2nd flr, renovate bath at upper flr. in kind replacement of 4 rear windows at 2nd flr. replace damaged window trim and stucDetails
add laundry room at garage level, new finish floor at garage level, renovate kitchen, powder room at 1st flr, renovate guest bath, master bath, master bedroom, master closet on 2nd flr, renovate bath at upper flr. in kind replacement of 4 rear windows at 2nd flr. replace damaged window trim and stuc | $300,000 |
| Mar 15, 2005 | Completed final sign-off Oct 2005 | 173 Merced Av | remodel master bathroom, remodel master closet, update electrical in master bedrm & upstairs office,Details
remodel master bathroom, remodel master closet, update electrical in master bedrm & upstairs office, | $65,000 |
| Mar 30, 2004 | Completed final sign-off Sep 2004 | 1925 Gough St | suite #22- remodel bath #2,replace tub,sink & toilet in original locationsDetails
suite #22- remodel bath #2,replace tub,sink & toilet in original locations | $10,000 |
| Jan 2, 2004 | Completed final sign-off Oct 2004 | 1925 Gough St | remodel kitchen, 2 bathrooms, 1 powder room, master closet, and laundry roomDetails
remodel kitchen, 2 bathrooms, 1 powder room, master closet, and laundry room | $200,000 |