Back to kitchen remodel contractors
Mora Architect Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2017 to Jun 2026
- Last 24 months
- 11 permits filed
48 permits since 2000: 29 completed, 7 in progress, 9 never finaled, 3 expired or cancelled.
Of the 9 never-finaled permits, 5 are 3 to 5 years old, 4 are 5 to 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 6 completed, 2 in progress, 3 never finaled, 1 expired or cancelled. Typically 34 days from filing to permit and 204 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2025 | Completed final sign-off Feb 2026 | 1051 Geneva Av | convert (e) home office on 1/f into adu per pc s207.2. add new stove to (e) kitchenette; add new enclosed open space for the adu; provide sep heating and electrical to the adu.Details
convert (e) home office on 1/f into adu per pc s207.2. add new stove to (e) kitchenette; add new enclosed open space for the adu; provide sep heating and electrical to the adu. | $24,000 |
| May 30, 2024 | Completed final sign-off Oct 2024 | 355 21st Av | unit 1: kitchen & bathroom remodel, remove e) fireplaceDetails
unit 1: kitchen & bathroom remodel, remove e) fireplace | $73,600 |
| Nov 3, 2023 | Completed final sign-off Mar 2024 | 2125 Hayes St | unit 4 & 5: remodel kitchen in both units 4 & 5. new conters & cabinets. remodel 1 bathroom in each unit. upgrade (e) electric & lighting. to comply w/compliant #202315338Details
unit 4 & 5: remodel kitchen in both units 4 & 5. new conters & cabinets. remodel 1 bathroom in each unit. upgrade (e) electric & lighting. to comply w/compliant #202315338 | $52,000 |
| Nov 22, 2022 | Completed final sign-off Sep 2023 | 528 Oak St | unit #2: kitchen remodel. add insulation. electrical upgrade. new water heater and heating system. new flooring. remove extg interior wall coverings and replace.Details
unit #2: kitchen remodel. add insulation. electrical upgrade. new water heater and heating system. new flooring. remove extg interior wall coverings and replace. | $76,000 |
| Aug 19, 2022 | Never finaled filed Aug 2022, never issued | 1287 Revere Av | to comply with nov# 202288518. fire repair and remodel including removal of wall separating living and kitchen areas. addition of ground floor 1 bedroom unit. 4 foot horizontal extension at rear.Details
to comply with nov# 202288518. fire repair and remodel including removal of wall separating living and kitchen areas. addition of ground floor 1 bedroom unit. 4 foot horizontal extension at rear. | $150,000 |
| Jul 5, 2022 | Completed final sign-off Jun 2025 | 1882 33rd Av | 2nd foor: remove wall between extg dining/kitchen and living rooms. remove shower in extg bath and enlarge closet in bedroom. relocate wahser and dryer. unit legalization on 1st floor under seperate pa#202203160108. deck under seperate permit.Details
2nd foor: remove wall between extg dining/kitchen and living rooms. remove shower in extg bath and enlarge closet in bedroom. relocate wahser and dryer. unit legalization on 1st floor under seperate pa#202203160108. deck under seperate permit. | $103,000 |
| Mar 16, 2022 | Completed final sign-off Jun 2025 | 1882 33rd Av | comply w/ nov #202173296. legalization of (e) unit on the 1st fl. move kitchen from garage area to within the unt. provide 1-hr separation to the unit. provide heating to the unit.Details
comply w/ nov #202173296. legalization of (e) unit on the 1st fl. move kitchen from garage area to within the unt. provide 1-hr separation to the unit. provide heating to the unit. | $65,400 |
| Jul 26, 2021 | In progress issued Aug 2025 | 568 Chenery St | vertical & rear horizontal addition: excavation at 1/f & raising roofs at 3/f to create min ceiling heights, interior remodel at all levels including new bedroom & bath at 1/f, relocate kitchen & bath at 2/f, & new bath at 3/f.Details
vertical & rear horizontal addition: excavation at 1/f & raising roofs at 3/f to create min ceiling heights, interior remodel at all levels including new bedroom & bath at 1/f, relocate kitchen & bath at 2/f, & new bath at 3/f. | $375,000 |
| Jul 15, 2021 | Never finaled issued Jul 2021, no final | 1715 Mcallister St | unit 102:remodel one kitchen and bath at unit 102 with new electrical; new flooring new kitchen cabinets, counters, fixtures, and appliances, new bathroom fixtures and paint. to comply w/ complaint #202179931 non structural.Details
unit 102:remodel one kitchen and bath at unit 102 with new electrical; new flooring new kitchen cabinets, counters, fixtures, and appliances, new bathroom fixtures and paint. to comply w/ complaint #202179931 non structural. | $36,000 |
| Apr 23, 2021 | Never finaled issued May 2021, no final | 1715 Mcallister St | unit 204: structural modifications: additional structural reinforcement to bldg. refer to seismic permit #201806263057. new kitchen counters & flooring at unit 204.Details
unit 204: structural modifications: additional structural reinforcement to bldg. refer to seismic permit #201806263057. new kitchen counters & flooring at unit 204. | $24,000 |
| Dec 10, 2019 | Expired or cancelled cancelled Nov 2024 | 501 19th Av | structural repairs to posts, beams & footings, kitchen rehabilitation, bathroom rehabilitation, upgrade replace (e) stairs to rear yardDetails
structural repairs to posts, beams & footings, kitchen rehabilitation, bathroom rehabilitation, upgrade replace (e) stairs to rear yard | $55,000 |
| Jul 16, 2019 | In progress issued Oct 2024 | 1300 44th Av | add 2nd dwelling unit (unit #2) at 1st fl, provide accessible entry ramp & bathroom. remodel upper unit #1 at 2nd fl. convert living area to bedroom. add 2nd bath. remodel kitchen & (e) bathroom. new landing & staid for upper unit access to rearyard. upgrade (e) furnace for 2nd fl unit.Details
add 2nd dwelling unit (unit #2) at 1st fl, provide accessible entry ramp & bathroom. remodel upper unit #1 at 2nd fl. convert living area to bedroom. add 2nd bath. remodel kitchen & (e) bathroom. new landing & staid for upper unit access to rearyard. upgrade (e) furnace for 2nd fl unit. | $90,000 |