Back to bathroom remodel contractors
Mora Architect Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2017 to Jun 2026
- Last 24 months
- 11 permits filed
48 permits since 2000: 29 completed, 7 in progress, 9 never finaled, 3 expired or cancelled.
Of the 9 never-finaled permits, 5 are 3 to 5 years old, 4 are 5 to 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 6 completed, 2 in progress, 2 never finaled, 1 expired or cancelled. Typically 14 days from filing to permit and 273 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2025 | Completed final sign-off Mar 2026 | 357 Castenada Av | bathroom remodel at second floor. add new washer/dryer unit at existing closet. reduce window height and provide (n) wood window. add new skylight.Details
bathroom remodel at second floor. add new washer/dryer unit at existing closet. reduce window height and provide (n) wood window. add new skylight. | $35,700 |
| May 30, 2024 | Completed final sign-off Oct 2024 | 355 21st Av | unit 1: kitchen & bathroom remodel, remove e) fireplaceDetails
unit 1: kitchen & bathroom remodel, remove e) fireplace | $73,600 |
| Nov 3, 2023 | Completed final sign-off Mar 2024 | 2125 Hayes St | unit 4 & 5: remodel kitchen in both units 4 & 5. new conters & cabinets. remodel 1 bathroom in each unit. upgrade (e) electric & lighting. to comply w/compliant #202315338Details
unit 4 & 5: remodel kitchen in both units 4 & 5. new conters & cabinets. remodel 1 bathroom in each unit. upgrade (e) electric & lighting. to comply w/compliant #202315338 | $52,000 |
| Jul 5, 2022 | Completed final sign-off Jun 2025 | 1882 33rd Av | 2nd foor: remove wall between extg dining/kitchen and living rooms. remove shower in extg bath and enlarge closet in bedroom. relocate wahser and dryer. unit legalization on 1st floor under seperate pa#202203160108. deck under seperate permit.Details
2nd foor: remove wall between extg dining/kitchen and living rooms. remove shower in extg bath and enlarge closet in bedroom. relocate wahser and dryer. unit legalization on 1st floor under seperate pa#202203160108. deck under seperate permit. | $103,000 |
| Mar 30, 2022 | Never finaled issued Mar 2023, no final | 478 Los Palmos Dr | rear addition to an existing residence, new wood deck (150 sf) at rear ground level, new bathroom on second floor, remove interior partitions in living area on first floorDetails
rear addition to an existing residence, new wood deck (150 sf) at rear ground level, new bathroom on second floor, remove interior partitions in living area on first floor | $245,000 |
| Jul 26, 2021 | In progress issued Aug 2025 | 568 Chenery St | vertical & rear horizontal addition: excavation at 1/f & raising roofs at 3/f to create min ceiling heights, interior remodel at all levels including new bedroom & bath at 1/f, relocate kitchen & bath at 2/f, & new bath at 3/f.Details
vertical & rear horizontal addition: excavation at 1/f & raising roofs at 3/f to create min ceiling heights, interior remodel at all levels including new bedroom & bath at 1/f, relocate kitchen & bath at 2/f, & new bath at 3/f. | $375,000 |
| Jul 15, 2021 | Never finaled issued Jul 2021, no final | 1715 Mcallister St | unit 102:remodel one kitchen and bath at unit 102 with new electrical; new flooring new kitchen cabinets, counters, fixtures, and appliances, new bathroom fixtures and paint. to comply w/ complaint #202179931 non structural.Details
unit 102:remodel one kitchen and bath at unit 102 with new electrical; new flooring new kitchen cabinets, counters, fixtures, and appliances, new bathroom fixtures and paint. to comply w/ complaint #202179931 non structural. | $36,000 |
| Feb 22, 2021 | Completed final sign-off Aug 2021 | 1925 Gough St | unit #71: renovation of existing bathroom. add skylight & new window.Details
unit #71: renovation of existing bathroom. add skylight & new window. | $42,000 |
| Dec 10, 2019 | Expired or cancelled cancelled Nov 2024 | 501 19th Av | structural repairs to posts, beams & footings, kitchen rehabilitation, bathroom rehabilitation, upgrade replace (e) stairs to rear yardDetails
structural repairs to posts, beams & footings, kitchen rehabilitation, bathroom rehabilitation, upgrade replace (e) stairs to rear yard | $55,000 |
| Aug 1, 2019 | Completed final sign-off Mar 2022 | 355 21st Av | add 2nd bathroom to unit #7 (unit added under sep 201803052853 and has been issued already)Details
add 2nd bathroom to unit #7 (unit added under sep 201803052853 and has been issued already) | $12,000 |
| Jul 16, 2019 | In progress issued Oct 2024 | 1300 44th Av | add 2nd dwelling unit (unit #2) at 1st fl, provide accessible entry ramp & bathroom. remodel upper unit #1 at 2nd fl. convert living area to bedroom. add 2nd bath. remodel kitchen & (e) bathroom. new landing & staid for upper unit access to rearyard. upgrade (e) furnace for 2nd fl unit.Details
add 2nd dwelling unit (unit #2) at 1st fl, provide accessible entry ramp & bathroom. remodel upper unit #1 at 2nd fl. convert living area to bedroom. add 2nd bath. remodel kitchen & (e) bathroom. new landing & staid for upper unit access to rearyard. upgrade (e) furnace for 2nd fl unit. | $90,000 |