Back to kitchen remodel contractors
Modern Art Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2008 to Sep 2024
- Last 24 months
- 0 permits filed
67 permits since 2000: 45 completed, 4 in progress, 9 never finaled, 9 expired or cancelled.
Of the 9 never-finaled permits, 5 are 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 12 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 11, 2017 | Completed final sign-off Jun 2018 | 4312 23rd St | remodel (e) kitchen & (e) bathroom, in-kind, add a tub. install a (n) bathroom in master bedroom with shower pan. install new gas fire insert to living room. no structural work.Details
remodel (e) kitchen & (e) bathroom, in-kind, add a tub. install a (n) bathroom in master bedroom with shower pan. install new gas fire insert to living room. no structural work. | $68,500 |
| Jul 27, 2017 | Never finaled issued Oct 2018, no final | 20 Belcher St | rear bldg: remodel of the detached 1-unit cottage in the rear yard. add 1 bathroom. reconfigure & relocat kitchen to ground floor.Details
rear bldg: remodel of the detached 1-unit cottage in the rear yard. add 1 bathroom. reconfigure & relocat kitchen to ground floor. | $200,000 |
| Dec 2, 2015 | Never finaled issued Dec 2015, no final | 42 Ord Ct | remove (e) carpet, refinish hardwood floors. replace kitchen cabinets & paint.Details
remove (e) carpet, refinish hardwood floors. replace kitchen cabinets & paint. | $7,500 |
| Mar 19, 2015 | Completed final sign-off May 2016 | 829 Dolores St | kitchen remodel & convert pantry into bathroomDetails
kitchen remodel & convert pantry into bathroom | $75,000 |
| Mar 5, 2015 | Completed final sign-off May 2016 | 829 Dolores St | light demolition in existing kitchen: work to include remove kitchen cabinets and sink. no structural work, no existing wall demo and no sheetrock demo. seperate building permit will be filed for kitchen remodel.Details
light demolition in existing kitchen: work to include remove kitchen cabinets and sink. no structural work, no existing wall demo and no sheetrock demo. seperate building permit will be filed for kitchen remodel. | $500 |
| Aug 6, 2014 | Expired or cancelled expired May 2022 | 1948 Pacific Av | remove existing kitchen cabinetry, and bathroom cabinetryDetails
remove existing kitchen cabinetry, and bathroom cabinetry | $15,000 |
| Dec 11, 2013 | Completed final sign-off May 2018 | 151 Liberty St | excavate bsmt to provide/relocate unit 151, add new garage. provide new horizontal & vertical addition @ 1st & 2nd floors. new vertical addition & 3rd floor. complete structural upgrade throughout. add new kitchen & bathrooms. ** maher: ordinance no# 155-13 required; route to health **Details
excavate bsmt to provide/relocate unit 151, add new garage. provide new horizontal & vertical addition @ 1st & 2nd floors. new vertical addition & 3rd floor. complete structural upgrade throughout. add new kitchen & bathrooms. ** maher: ordinance no# 155-13 required; route to health ** | $825,000 |
| Oct 24, 2013 | Completed final sign-off Sep 2014 | 175 Carl St | converting 670 sq.ft. of 1/f garage & laundry area to 1 bedrm; 1 lv rm; 1 bath,add 160 sq.ft.new space @1/f under (e)kitchen & bay windows, add 11 sq.ft. of new space @ 2/f via modified bay window design, remodel 2/f&3/f:1/2 bath, kitchen, family room, new bathroom. upgrade mech, elec & plumbingDetails
converting 670 sq.ft. of 1/f garage & laundry area to 1 bedrm; 1 lv rm; 1 bath,add 160 sq.ft.new space @1/f under (e)kitchen & bay windows, add 11 sq.ft. of new space @ 2/f via modified bay window design, remodel 2/f&3/f:1/2 bath, kitchen, family room, new bathroom. upgrade mech, elec & plumbing | $260,000 |
| Aug 21, 2012 | Completed final sign-off Nov 2012 | 5 Cook St | remodel (e) kitchen. install new cabinetry, counters, appliances, flooring and recessed lighting. 50% high efficacy lighting. no structural work.Details
remodel (e) kitchen. install new cabinetry, counters, appliances, flooring and recessed lighting. 50% high efficacy lighting. no structural work. | $22,500 |
| Feb 27, 2012 | Completed final sign-off Apr 2012 | 2230 15th St | 2nd floor-remove wall between kitchen & dining room, install new lvl's & 1/2 plywoodDetails
2nd floor-remove wall between kitchen & dining room, install new lvl's & 1/2 plywood | $4,000 |
| Jan 25, 2012 | Completed final sign-off May 2012 | 250 32nd Av | remodel (e) kitchen. install new cabinetry, appliances and countertops. install new windows and doors in kitchen, dining and sun room. refinish (e) hardwood floors. not visdible from street. max ufactor .40Details
remodel (e) kitchen. install new cabinetry, appliances and countertops. install new windows and doors in kitchen, dining and sun room. refinish (e) hardwood floors. not visdible from street. max ufactor .40 | $70,000 |
| May 21, 2010 | Completed final sign-off Jul 2010 | 71 Westwood Dr | remodel extg kitchen, install new cabinetary and counters, rewire kitchen and install new florescent can lghting. install gas shut off fon stove, install new sink and disposal. build new custom pantry. lighting changes must comply with cec 150 kDetails
remodel extg kitchen, install new cabinetary and counters, rewire kitchen and install new florescent can lghting. install gas shut off fon stove, install new sink and disposal. build new custom pantry. lighting changes must comply with cec 150 k | $17,850 |
| Mar 17, 2010 | Completed final sign-off May 2010 | 100 Bosworth St | remodel kitchen on 2nd floor including install new electrical outlets in kitchen & dinign room, upgrade panel to 100 amps, replace furnace in same location, high efficiency @ garage, lighting shall comply w/ced 150 (k).Details
remodel kitchen on 2nd floor including install new electrical outlets in kitchen & dinign room, upgrade panel to 100 amps, replace furnace in same location, high efficiency @ garage, lighting shall comply w/ced 150 (k). | $19,500 |
| Feb 3, 2009 | Completed final sign-off Apr 2009 | 277 29th St | work at unit 277 only - remodel 1 kitchen and 1 bathroom & 1 1/2 bathroom and add laundryDetails
work at unit 277 only - remodel 1 kitchen and 1 bathroom & 1 1/2 bathroom and add laundry | $38,000 |
| Apr 16, 2008 | Completed final sign-off May 2011 | 462 Sanchez St | construct new horizontal/vertical rear addition at 2nd fl-provide 2 new bedrooms, laundry at 1st fl, new kitchen, family room, breakfast area at 2nd fl. provide 2 new bedrooms and bathrooms on 3rd floor, walk out deck at front, install new garage door, convert storage area to one car garageDetails
construct new horizontal/vertical rear addition at 2nd fl-provide 2 new bedrooms, laundry at 1st fl, new kitchen, family room, breakfast area at 2nd fl. provide 2 new bedrooms and bathrooms on 3rd floor, walk out deck at front, install new garage door, convert storage area to one car garage | $300,000 |