Modern Art Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2008 to Sep 2024
- Last 24 months
- 0 permits filed
67 permits since 2000: 45 completed, 4 in progress, 9 never finaled, 9 expired or cancelled.
Of the 9 never-finaled permits, 5 are 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 1 completed, 2 expired or cancelled. Typically 824 days from filing to permit and 338 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 18, 2018 | Expired or cancelled cancelled Nov 2024 | 4312 23rd St | interior renovations and additions of a garage to an (e) sfh. (n) work consists of (n) interior partitions, (n) garage w/ interior staircase, remodeled 1st flr, remodeled interior staircase & exterior staircase. (n) addition under (e) deck is proposed.Details
interior renovations and additions of a garage to an (e) sfh. (n) work consists of (n) interior partitions, (n) garage w/ interior staircase, remodeled 1st flr, remodeled interior staircase & exterior staircase. (n) addition under (e) deck is proposed. | $250,000 |
| May 19, 2015 | Expired or cancelled expired May 2022 | 1948 Pacific Av | add (n) basement level, add (n) garage @ 1st fl. horizontal addition & rear decks in rear yard. reconfigure misc interior partitions & layout. add (n) 4th fl covered deck space from (e) space. (n) misc plumb & elec work.Details
add (n) basement level, add (n) garage @ 1st fl. horizontal addition & rear decks in rear yard. reconfigure misc interior partitions & layout. add (n) 4th fl covered deck space from (e) space. (n) misc plumb & elec work. | $575,000 |
| Apr 16, 2008 | Completed final sign-off May 2011 | 462 Sanchez St | construct new horizontal/vertical rear addition at 2nd fl-provide 2 new bedrooms, laundry at 1st fl, new kitchen, family room, breakfast area at 2nd fl. provide 2 new bedrooms and bathrooms on 3rd floor, walk out deck at front, install new garage door, convert storage area to one car garageDetails
construct new horizontal/vertical rear addition at 2nd fl-provide 2 new bedrooms, laundry at 1st fl, new kitchen, family room, breakfast area at 2nd fl. provide 2 new bedrooms and bathrooms on 3rd floor, walk out deck at front, install new garage door, convert storage area to one car garage | $300,000 |