- 0 permits filed
67 permits since 2000: 45 completed, 4 in progress, 9 never finaled, 9 expired or cancelled.
Of the 9 never-finaled permits, 5 are 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 15 completed, 1 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 238 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 30, 2024 | Completed final sign-off May 2024 | 38 Wilder St | revision to pa 201806283250 remove non structural partition wall between master bedroom & bathrooms; remove non structural closet; flip master closet & master bathroom; install new closet inf office: change bedroom, all work on 3rd flDetails
revision to pa 201806283250 remove non structural partition wall between master bedroom & bathrooms; remove non structural closet; flip master closet & master bathroom; install new closet inf office: change bedroom, all work on 3rd fl | |
| Nov 22, 2023 | Completed final sign-off Apr 2024 | 637 Irving St | interior alteration to (e) commercial space. from retail to healthcare. install (n) ada bathroom, (n) interior partition for (n) treatment rooms, install (n) plumbing & electricalDetails
interior alteration to (e) commercial space. from retail to healthcare. install (n) ada bathroom, (n) interior partition for (n) treatment rooms, install (n) plumbing & electrical | $55,000 |
| Oct 11, 2017 | Completed final sign-off Jun 2018 | 4312 23rd St | remodel (e) kitchen & (e) bathroom, in-kind, add a tub. install a (n) bathroom in master bedroom with shower pan. install new gas fire insert to living room. no structural work.Details
remodel (e) kitchen & (e) bathroom, in-kind, add a tub. install a (n) bathroom in master bedroom with shower pan. install new gas fire insert to living room. no structural work. | $68,500 |
| Jul 27, 2017 | Never finaled issued Oct 2018, no final | 20 Belcher St | rear bldg: remodel of the detached 1-unit cottage in the rear yard. add 1 bathroom. reconfigure & relocat kitchen to ground floor.Details
rear bldg: remodel of the detached 1-unit cottage in the rear yard. add 1 bathroom. reconfigure & relocat kitchen to ground floor. | $200,000 |
| Mar 22, 2016 | Completed final sign-off May 2016 | 829 Dolores St | rev to pa#remodel (e) bathroom in-kind. install new sink and new electricval & fans. rev to pa#201503191263.Details
rev to pa#remodel (e) bathroom in-kind. install new sink and new electricval & fans. rev to pa#201503191263. | $3,000 |
| Mar 19, 2015 | Completed final sign-off May 2016 | 829 Dolores St | kitchen remodel & convert pantry into bathroomDetails
kitchen remodel & convert pantry into bathroom | $75,000 |
| Aug 6, 2014 | Expired or cancelled expired May 2022 | 1948 Pacific Av | remove existing kitchen cabinetry, and bathroom cabinetryDetails
remove existing kitchen cabinetry, and bathroom cabinetry | $15,000 |
| Dec 11, 2013 | Completed final sign-off May 2018 | 151 Liberty St | excavate bsmt to provide/relocate unit 151, add new garage. provide new horizontal & vertical addition @ 1st & 2nd floors. new vertical addition & 3rd floor. complete structural upgrade throughout. add new kitchen & bathrooms. ** maher: ordinance no# 155-13 required; route to health **Details
excavate bsmt to provide/relocate unit 151, add new garage. provide new horizontal & vertical addition @ 1st & 2nd floors. new vertical addition & 3rd floor. complete structural upgrade throughout. add new kitchen & bathrooms. ** maher: ordinance no# 155-13 required; route to health ** | $825,000 |
| Oct 24, 2013 | Completed final sign-off Sep 2014 | 175 Carl St | converting 670 sq.ft. of 1/f garage & laundry area to 1 bedrm; 1 lv rm; 1 bath,add 160 sq.ft.new space @1/f under (e)kitchen & bay windows, add 11 sq.ft. of new space @ 2/f via modified bay window design, remodel 2/f&3/f:1/2 bath, kitchen, family room, new bathroom. upgrade mech, elec & plumbingDetails
converting 670 sq.ft. of 1/f garage & laundry area to 1 bedrm; 1 lv rm; 1 bath,add 160 sq.ft.new space @1/f under (e)kitchen & bay windows, add 11 sq.ft. of new space @ 2/f via modified bay window design, remodel 2/f&3/f:1/2 bath, kitchen, family room, new bathroom. upgrade mech, elec & plumbing | $260,000 |
| Jul 8, 2013 | Completed final sign-off Aug 2013 | 565 14th St | unit 1 - remodel (e) bathroom interior. replace vanity, toilet, and shower heads. relocate electrical and plumbing to accommodate new vanity. install new wall and floor tiles. exhaust connect to existing ducts, lighting comply w/cec 150(k).Details
unit 1 - remodel (e) bathroom interior. replace vanity, toilet, and shower heads. relocate electrical and plumbing to accommodate new vanity. install new wall and floor tiles. exhaust connect to existing ducts, lighting comply w/cec 150(k). | $9,000 |
| Mar 20, 2012 | Completed final sign-off Apr 2012 | 2230 15th St | remodel (e) bathroom. replace tub, vanity & install new toilet. install new tile on floor & walls over tub.Details
remodel (e) bathroom. replace tub, vanity & install new toilet. install new tile on floor & walls over tub. | $7,000 |
| Mar 28, 2011 | Completed final sign-off Dec 2011 | 2159 Bay St | remodel existing master bathroom, install new shower pan, shower heads and new vanity, re-plumb and rewire bathroom.Details
remodel existing master bathroom, install new shower pan, shower heads and new vanity, re-plumb and rewire bathroom. | $18,000 |
| Feb 22, 2011 | Completed final sign-off Dec 2011 | 49 Twin Peaks Bl | add new toilet on main floor, expand e bathroom on lower level, convert laundry to new bedroom, bath on lower level.Details
add new toilet on main floor, expand e bathroom on lower level, convert laundry to new bedroom, bath on lower level. | $20,000 |
| Aug 17, 2010 | Completed final sign-off Apr 2011 | 85 Central Av | replace (e) foundation at the rear of garage incl. new steel frame to (e)grg door.remodel kitch. on 2nd and 3rd floors convert (e) bdrm into (n) dining rm on 2nd & 3rd flrs. convert (e) bdrm into (n) bath on 2nd&3rd fl. convert (e) living into (n) master bdrm on 12nd and 3rd flDetails
replace (e) foundation at the rear of garage incl. new steel frame to (e)grg door.remodel kitch. on 2nd and 3rd floors convert (e) bdrm into (n) dining rm on 2nd & 3rd flrs. convert (e) bdrm into (n) bath on 2nd&3rd fl. convert (e) living into (n) master bdrm on 12nd and 3rd fl | $60,000 |
| Nov 19, 2009 | Completed final sign-off Jan 2010 | 668 Castro St | remodel 2 bathrooms, install new vanity's, tubs & plumbing. fixtures re-tile floor's & walls. relocate electrical to accododate new vanity. no moving or adding wallsDetails
remodel 2 bathrooms, install new vanity's, tubs & plumbing. fixtures re-tile floor's & walls. relocate electrical to accododate new vanity. no moving or adding walls | $18,500 |
| Feb 3, 2009 | Completed final sign-off Apr 2009 | 277 29th St | work at unit 277 only - remodel 1 kitchen and 1 bathroom & 1 1/2 bathroom and add laundryDetails
work at unit 277 only - remodel 1 kitchen and 1 bathroom & 1 1/2 bathroom and add laundry | $38,000 |
| Apr 16, 2008 | Completed final sign-off May 2011 | 462 Sanchez St | construct new horizontal/vertical rear addition at 2nd fl-provide 2 new bedrooms, laundry at 1st fl, new kitchen, family room, breakfast area at 2nd fl. provide 2 new bedrooms and bathrooms on 3rd floor, walk out deck at front, install new garage door, convert storage area to one car garageDetails
construct new horizontal/vertical rear addition at 2nd fl-provide 2 new bedrooms, laundry at 1st fl, new kitchen, family room, breakfast area at 2nd fl. provide 2 new bedrooms and bathrooms on 3rd floor, walk out deck at front, install new garage door, convert storage area to one car garage | $300,000 |