Back to bathroom remodel contractors
Mishal Builders And Contractors Inc
- Based in
- Richmond
- On San Francisco permits
- Apr 2023 to Sep 2026
- Last 24 months
- 17 permits filed
19 permits since 2000: 18 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
14 bathroom remodel permits: 13 in progress, 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2026 | In progress issued Oct 2026 | 83 Fountain St | interior remodel of basement and 1st floor of existing single family dewlling, refonfigure interior walls, add bathroom at 1st floor. new windows, side lightd. new doors at rear, new window opening at 2nd floor. relocate electrical service & gas meter.relocate sprinllers(design build).Details
interior remodel of basement and 1st floor of existing single family dewlling, refonfigure interior walls, add bathroom at 1st floor. new windows, side lightd. new doors at rear, new window opening at 2nd floor. relocate electrical service & gas meter.relocate sprinllers(design build). | $95,000 |
| Aug 24, 2026 | In progress issued Aug 2026 | 8 Locksley Av | units 6h and 8e- replace kitchen cabinets countertops and update electrical for kitchen work. no structual work. partial bath remodel in kind replace vanity and toilets in kindDetails
units 6h and 8e- replace kitchen cabinets countertops and update electrical for kitchen work. no structual work. partial bath remodel in kind replace vanity and toilets in kind | $50,000 |
| Aug 24, 2026 | In progress issued Aug 2026 | 6 Locksley Av | unit 8f- replace kitchen cabinets countertops and update electrical for kitchen work. no structual work. partial bath remodel in kind replace vanity and toilets in kindDetails
unit 8f- replace kitchen cabinets countertops and update electrical for kitchen work. no structual work. partial bath remodel in kind replace vanity and toilets in kind | $25,000 |
| Aug 18, 2026 | In progress issued Aug 2026 | 6 Locksley Av | apt 2e:kitchen remodel in kind - replace kitchen cabinets, countertop,update electric for kitchen, work for apt #2e.no structural work. partial bath remodel in kind-replace vanity and toilet in kind. no change to floor layout.no change to wall layout. no structural work.maintain all (e) fire rating.Details
apt 2e:kitchen remodel in kind - replace kitchen cabinets, countertop,update electric for kitchen, work for apt #2e.no structural work. partial bath remodel in kind-replace vanity and toilet in kind. no change to floor layout.no change to wall layout. no structural work.maintain all (e) fire rating. | $25,000 |
| Aug 18, 2026 | In progress issued Aug 2026 | 8 Locksley Av | apt#5e & #10d: remodel (e) kitchen in kind - replace kitchen cabinets, countertop, update electric for kitchen. partial bath remodel in kind - replace vanity and toilet in kind. no change to floor layout. no change to wall layout. no structural work. maintain all (e) fire rating.Details
apt#5e & #10d: remodel (e) kitchen in kind - replace kitchen cabinets, countertop, update electric for kitchen. partial bath remodel in kind - replace vanity and toilet in kind. no change to floor layout. no change to wall layout. no structural work. maintain all (e) fire rating. | $50,000 |
| Aug 10, 2026 | In progress issued Aug 2026 | 6 Locksley Av | replace kitchen cabinets, countertop, update electric for kitchen, work for apt 9k. no structural work. partial bath remodel, in kind replace vanity and toilet in kind.Details
replace kitchen cabinets, countertop, update electric for kitchen, work for apt 9k. no structural work. partial bath remodel, in kind replace vanity and toilet in kind. | $25,000 |
| Aug 4, 2026 | In progress issued Aug 2026 | 8 Locksley Av | apt#7f/ replace kitchen cabinets, countertops, and update electrical for kitchen remodel. prtial bathroom remodel, replace vanity and toilet. no structural work all work in-kind.Details
apt#7f/ replace kitchen cabinets, countertops, and update electrical for kitchen remodel. prtial bathroom remodel, replace vanity and toilet. no structural work all work in-kind. | $25,000 |
| Aug 4, 2026 | In progress issued Aug 2026 | 6 Locksley Av | 2 apartment unit(s) for 10(h) & 5(h) replace kitchen cabinets, countertops, and update electrical for kitchen remodel. prtial bathroom remodel, replace vanity and toilet. no structural work all work in-kind.Details
2 apartment unit(s) for 10(h) & 5(h) replace kitchen cabinets, countertops, and update electrical for kitchen remodel. prtial bathroom remodel, replace vanity and toilet. no structural work all work in-kind. | $50,000 |
| Jun 2, 2026 | In progress issued Jun 2026 | 6 Locksley Av | units 2k, 7h, 4a: kitchen and bathroom remodels for all 3 units. no changes to layout or walls.Details
units 2k, 7h, 4a: kitchen and bathroom remodels for all 3 units. no changes to layout or walls. | $60,000 |
| Jun 2, 2026 | In progress issued Jun 2026 | 8 Locksley Av | units 1a,1h,5h,5j: kitchen and bathroom remodels for all units, no change to walls and layouts. no structural work, no changes to doors & windows.Details
units 1a,1h,5h,5j: kitchen and bathroom remodels for all units, no change to walls and layouts. no structural work, no changes to doors & windows. | $80,000 |
| May 22, 2026 | In progress issued May 2026 | 8 Locksley Av | unit 4b: partial kitchen remodel in kind - replace kitchen cabinets, countertop in-kind and update electrical for kitchen. partial bathroom remodel in kind - replace vanity and toilet in kind. no change to floor layout. no change to wall layout. no structural work.Details
unit 4b: partial kitchen remodel in kind - replace kitchen cabinets, countertop in-kind and update electrical for kitchen. partial bathroom remodel in kind - replace vanity and toilet in kind. no change to floor layout. no change to wall layout. no structural work. | $25,000 |
| Apr 30, 2025 | In progress issued Apr 2025 | 3201 Washington St | apt #5: remodel kitchen and bathroom with like for like work in apt. 5 only. no structural walls.Details
apt #5: remodel kitchen and bathroom with like for like work in apt. 5 only. no structural walls. | $30,000 |
| Jul 18, 2024 | In progress issued Jul 2024 | 2232 North Point St | unit 11- remodel kitchen and bathroom . removal all plaster walls to install (n) mep. replace w/drywall. relocated w&d in closet. no change to door/windows and no wall removal or layout change.Details
unit 11- remodel kitchen and bathroom . removal all plaster walls to install (n) mep. replace w/drywall. relocated w&d in closet. no change to door/windows and no wall removal or layout change. | $45,000 |
| Apr 27, 2023 | Never finaled issued Apr 2023, no final | 2232 North Point St | remodel kitchen & bathroom, upgrade electrical work throughout. add washer in closet. open plaster walls & ceiling to do electrical & plumbing work. work in apt #10 only. no change to windows. no structural work.Details
remodel kitchen & bathroom, upgrade electrical work throughout. add washer in closet. open plaster walls & ceiling to do electrical & plumbing work. work in apt #10 only. no change to windows. no structural work. | $42,000 |