Block 0919, lot 002
2232 North Point St
- City’s use
- Multi-Family Residential
- Built
- 1929
- Stories
- 3
- Units
- 12
- Rooms
- 12 bathrooms
- Building
- 11,184 sq ft
- Lot
- 4,726 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 20, 2025 | Completed final sign-off Oct 2025 | 2232 North Point St | San Francisco Fire Protection | replace existing fire alarm system to comply with sffd 1103.7.6.1. replace (e) facp with new fire alarm control panel. install aes radio, lcd annunciator, smoke detector, manual pulls, monitor modules, horn strobes. install lf sounders in all units sleeping area to comply with sffd 1103.7.6.1Details
replace existing fire alarm system to comply with sffd 1103.7.6.1. replace (e) facp with new fire alarm control panel. install aes radio, lcd annunciator, smoke detector, manual pulls, monitor modules, horn strobes. install lf sounders in all units sleeping area to comply with sffd 1103.7.6.1 | $10,000 |
| Jul 18, 2024 | In progress issued Jul 2024 | 2232 North Point St | Mishal Builders And Contractors Inc | unit 11- remodel kitchen and bathroom . removal all plaster walls to install (n) mep. replace w/drywall. relocated w&d in closet. no change to door/windows and no wall removal or layout change.Details
unit 11- remodel kitchen and bathroom . removal all plaster walls to install (n) mep. replace w/drywall. relocated w&d in closet. no change to door/windows and no wall removal or layout change. | $45,000 |
| Apr 27, 2023 | Never finaled issued Apr 2023, no final | 2232 North Point St | Mishal Builders And Contractors Inc | remodel kitchen & bathroom, upgrade electrical work throughout. add washer in closet. open plaster walls & ceiling to do electrical & plumbing work. work in apt #10 only. no change to windows. no structural work.Details
remodel kitchen & bathroom, upgrade electrical work throughout. add washer in closet. open plaster walls & ceiling to do electrical & plumbing work. work in apt #10 only. no change to windows. no structural work. | $42,000 |
| Mar 15, 2022 | Never finaled issued Mar 2022, no final | 2232 North Point St | Ramirez Roofing Corporation | reroofingDetails
reroofing | $22,000 |
| Aug 24, 2020 | Never finaled issued Aug 2020, no final | 2232 North Point St | Mashal Builders & Contractors Inc | remodel kitchen and bathroom, upgrade elec through out the unit, add washer and dryer to clost, open plaster wall and replace with sheetrock to allow for plumbing and elec work, work will be only in apt #4, no change to door or windows, bathroom is 5x8 and kitchen is 8x10Details
remodel kitchen and bathroom, upgrade elec through out the unit, add washer and dryer to clost, open plaster wall and replace with sheetrock to allow for plumbing and elec work, work will be only in apt #4, no change to door or windows, bathroom is 5x8 and kitchen is 8x10 | $38,000 |
| Sep 5, 2019 | Never finaled issued Sep 2019, no final | 2232 North Point St | Mashal Builders & Contractors Inc | apt 6 - remodel kitchen install new cabinet and counter top. install new toilet and vanity. no change to doors and windowsDetails
apt 6 - remodel kitchen install new cabinet and counter top. install new toilet and vanity. no change to doors and windows | $35,000 |
| May 18, 2016 | Never finaled issued May 2016, no final | 2232 North Point St | Mashal Builders & Contractors Inc | unit #7: relocate kitchen, remodel bathrooms, install new elec in bathroom and kitchen. install washer and dryer in closet. no structural work. no change to windows and doors. n/a for maherDetails
unit #7: relocate kitchen, remodel bathrooms, install new elec in bathroom and kitchen. install washer and dryer in closet. no structural work. no change to windows and doors. n/a for maher | $35,000 |
| May 18, 2016 | Never finaled issued May 2016, no final | 2232 North Point St | Mashal Builders & Contractors Inc | unit #9: relocate kitchen, remodel bathrooms, install new elec in bathroom and kitchen. install washer and dryer in closet. no structural work. no change to windows and doors. n/a for maherDetails
unit #9: relocate kitchen, remodel bathrooms, install new elec in bathroom and kitchen. install washer and dryer in closet. no structural work. no change to windows and doors. n/a for maher | $35,000 |
| May 18, 2016 | Never finaled issued May 2016, no final | 2232 North Point St | Mashal Builders & Contractors Inc | unit #12: relocate kitchen, remodel bathrooms, install new elec in bathroom and kitchen. install washer and dryer in closet. no structural work. no change to windows and doors. n/a for maherDetails
unit #12: relocate kitchen, remodel bathrooms, install new elec in bathroom and kitchen. install washer and dryer in closet. no structural work. no change to windows and doors. n/a for maher | $35,000 |
| May 18, 2016 | Never finaled issued May 2016, no final | 2232 North Point St | Mashal Builders & Contractors Inc | unit #2: relocate kitchen, remodel bathrooms, install new elec in bathroom and kitchen. install washer and dryer in closet. no structural work. no change to windows and doors. n/a for maherDetails
unit #2: relocate kitchen, remodel bathrooms, install new elec in bathroom and kitchen. install washer and dryer in closet. no structural work. no change to windows and doors. n/a for maher | $35,000 |
| Oct 21, 2015 | Never finaled issued Oct 2015, no final | 2232 North Point St | streetspaceDetails
streetspace | ||
| Jul 13, 2015 | Completed final sign-off Nov 2017 | 2232 North Point St | Mashal Builders & Contractors Inc | remodel of 2 units: #5 and #8 per plans dated 7/2/15. relocate extg kitchen to be part of the living room and add one bedroom where ktichen was. install new light per title 24. no window change. no structural work. all work in apt 5 and 8 only.Details
remodel of 2 units: #5 and #8 per plans dated 7/2/15. relocate extg kitchen to be part of the living room and add one bedroom where ktichen was. install new light per title 24. no window change. no structural work. all work in apt 5 and 8 only. | $150,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Mashal Builders & Contractors Inc (7), Mishal Builders And Contractors Inc (2), Ramirez Roofing Corporation, San Francisco Fire Protection
- Architects
- Robert Sargenti (4)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.