Block 0998, lot 001
3201 Washington St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 4
- Units
- 17
- Rooms
- 17 bathrooms
- Building
- 13,880 sq ft
- Lot
- 4,375 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
17 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 9, 2025 | Completed final sign-off Apr 2026 | 3201 Washington St | San Francisco Fire Protection | upgrade existing fire alarm system to comply with sffc section 1103.7.6.1 to meet 75db in all sleeping areas.Details
upgrade existing fire alarm system to comply with sffc section 1103.7.6.1 to meet 75db in all sleeping areas. | $50,950 |
| Apr 30, 2025 | In progress issued Apr 2025 | 3201 Washington St | Mishal Builders And Contractors Inc | apt #5: remodel kitchen and bathroom with like for like work in apt. 5 only. no structural walls.Details
apt #5: remodel kitchen and bathroom with like for like work in apt. 5 only. no structural walls. | $30,000 |
| May 18, 2021 | Never finaled issued May 2021, no final | 3201 Washington St | Mashal Builders & Contractors Inc | unit 3 & 12: remodel kitchen - replace kitchen cabinet with like for like, replace bathroom toilet & sink & shower valve without refinishing. no structural work. all work inside units 3 & 12 only. no changes to wall & openings.Details
unit 3 & 12: remodel kitchen - replace kitchen cabinet with like for like, replace bathroom toilet & sink & shower valve without refinishing. no structural work. all work inside units 3 & 12 only. no changes to wall & openings. | $30,000 |
| Jan 8, 2021 | Completed final sign-off Jan 2021 | 3201 Washington St | Pacific Heights Construction | unit # 1: to obtain final inspection for work approved under permit # 2013-0627-0694. the original scope of work has been completed but the permit was not finizalized by the original vendor, make ready maintenance.Details
unit # 1: to obtain final inspection for work approved under permit # 2013-0627-0694. the original scope of work has been completed but the permit was not finizalized by the original vendor, make ready maintenance. | $15,000 |
| Oct 15, 2018 | Never finaled issued Oct 2018, no final | 3201 Washington St | street spaceDetails
street space | ||
| Jul 3, 2018 | Completed final sign-off Jan 2019 | 3201 Washington St | Steelcore Builders Inc | rev to pa#201604184991: revise shear walls due to conflicts with (e) utilities & (e) conditions.Details
rev to pa#201604184991: revise shear walls due to conflicts with (e) utilities & (e) conditions. | |
| Apr 6, 2018 | Never finaled issued Apr 2018, no final | 3201 Washington St | Steelcore Builders Inc | street spaceDetails
street space | |
| Apr 2, 2018 | Completed final sign-off Jul 2018 | 3201 Washington St | Pacific Heights Construction | unit #15: revision to pa #201709259459, turn bath into a shower and enlarge/widen the closet. maher naDetails
unit #15: revision to pa #201709259459, turn bath into a shower and enlarge/widen the closet. maher na | |
| Sep 25, 2017 | Completed final sign-off Jul 2018 | 3201 Washington St | Pacific Heights Construction | remodel kitchen & bathroom , change doors, flooring, and add closet doors sheetrockDetails
remodel kitchen & bathroom , change doors, flooring, and add closet doors sheetrock | $15,000 |
| Jan 24, 2017 | Never finaled issued Jan 2017, no final | 3201 Washington St | street spaceDetails
street space | ||
| Nov 28, 2016 | Completed final sign-off Jun 2017 | 3201 Washington St | All Star Team Construction | apt 7: add new wiring & subpanel. remodel kitchen & bathroom in same layout. no reloation of walls moved, removed, added or infilled. all (e) layouts unchanged.Details
apt 7: add new wiring & subpanel. remodel kitchen & bathroom in same layout. no reloation of walls moved, removed, added or infilled. all (e) layouts unchanged. | $1,500 |
| Apr 18, 2016 | Completed final sign-off Jan 2019 | 3201 Washington St | Steelcore Builders Inc | soft story retrofit per sfbc ch 34b design criteria per iebc apx a4. n/a for maherDetails
soft story retrofit per sfbc ch 34b design criteria per iebc apx a4. n/a for maher | $50,000 |
| Jun 27, 2013 | Expired or cancelled expired Jan 2021 | 3201 Washington St | Make Ready Maintenance Inc | remodel kitchen and bathroom unit 1, no structural workDetails
remodel kitchen and bathroom unit 1, no structural work | $15,000 |
| Jan 3, 2012 | Never finaled issued Jan 2012, no final | 3201 Washington St | street spaceDetails
street space | ||
| Apr 25, 2011 | Never finaled issued Apr 2011, no final | 3201 Washington St | street spaceDetails
street space | ||
| Jun 3, 2005 | Never finaled issued Jun 2005, no final | 3201 Washington St | street space and sidewalk repairDetails
street space and sidewalk repair | ||
| Feb 9, 2005 | Never finaled issued Feb 2005, no final | 3201 Washington St | Bryan's Glass | replacement of 3 same in kind windows from single pane to double pane insulated windows in rear of bDetails
replacement of 3 same in kind windows from single pane to double pane insulated windows in rear of b | $1,340 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Pacific Heights Construction (3), Steelcore Builders Inc (3), All Star Team Construction, Bryan's Glass, Make Ready Maintenance Inc, Mashal Builders & Contractors Inc, Mishal Builders And Contractors Inc, San Francisco Fire Protection
- Engineers
- Scott Johnson (2), Albert Urrutia
- Designers
- Michael Williams
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.