Mike Ferrell Construction
- Based in
- San Mateo
- On San Francisco permits
- Oct 2006 to Oct 2019
- Last 24 months
- 0 permits filed
15 permits since 2000: 15 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 6 completed. Typically 0 days from filing to permit and 16 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 16, 2019 | Completed final sign-off Oct 2019 | 115 09th Av | repair rear stairs to climinate rot. repair is less than 50 . all work in kind.Details
repair rear stairs to climinate rot. repair is less than 50 . all work in kind. | $9,250 |
| Nov 14, 2018 | Completed final sign-off Dec 2018 | 4372 Mission St | repair rear stairs remove all rot to comply with nov #201881861 #3 less than 50% replacement in kind maintain egress at all timesDetails
repair rear stairs remove all rot to comply with nov #201881861 #3 less than 50% replacement in kind maintain egress at all times | $25,000 |
| Jul 17, 2015 | Completed final sign-off Dec 2015 | 430 Funston Av | comply with physcial inspection repor cc7940. provide protective ballards for furnace in garage. provide approved handrail at side stair sfbc sec 1022 at et seq 3401.2,440-3 sfhc sec 80s. repair common area fire resistive separation at walls and ceiling sfvc 406.14 chap tDetails
comply with physcial inspection repor cc7940. provide protective ballards for furnace in garage. provide approved handrail at side stair sfbc sec 1022 at et seq 3401.2,440-3 sfhc sec 80s. repair common area fire resistive separation at walls and ceiling sfvc 406.14 chap t | |
| Feb 11, 2008 | Completed final sign-off Feb 2008 | 77 Hoff St | correct nov 200839290, replace wood members in kind at rear stairway; including 2 posts, 1 stringer and 1 rim joist below top and intermediate landings. one post at ground floor.Details
correct nov 200839290, replace wood members in kind at rear stairway; including 2 posts, 1 stringer and 1 rim joist below top and intermediate landings. one post at ground floor. | $5,000 |
| Sep 25, 2007 | Completed final sign-off Oct 2007 | 793 Valencia St | comply with requirements of nov3200716372. to include: close transoms above entry doors & cover w/type x gyp. bd. close window openings in stair enclosure with type x gyp. bd. or 1/4" wire glass.Details
comply with requirements of nov3200716372. to include: close transoms above entry doors & cover w/type x gyp. bd. close window openings in stair enclosure with type x gyp. bd. or 1/4" wire glass. | $1,500 |
| Dec 26, 2006 | Completed final sign-off Dec 2006 | 773 Dolores St | correct nov - replace posts on back stairs repair and replace in kind less than 50% of stairway repair to comply with his nov 200681451 dated 11/7/2006Details
correct nov - replace posts on back stairs repair and replace in kind less than 50% of stairway repair to comply with his nov 200681451 dated 11/7/2006 | $1,500 |