Back to kitchen remodel contractors
Mike Ferrell Construction
- Based in
- San Mateo
- On San Francisco permits
- Oct 2006 to Oct 2019
- Last 24 months
- 0 permits filed
15 permits since 2000: 15 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 87 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 22, 2013 | Completed final sign-off Jul 2013 | 3342 22nd St | kitchen remodel- replace cabinets and counter top; repair old fire damage as needed, repair dry rot on front porch/rails as neededDetails
kitchen remodel- replace cabinets and counter top; repair old fire damage as needed, repair dry rot on front porch/rails as needed | $5,000 |