Block 3589, lot 084
3476 19th St
- City’s use
- Commercial Misc
- Built
- 1900
- Stories
- 3
- Units
- 15
- Rooms
- 15 bathrooms
- Building
- 16,635 sq ft
- Lot
- 6,917 sq ft
- Zoning
- VALEN
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 16, 2025 | In progress filed Oct 2025, not yet issued | 3476 19th St | ref 201502259357- to modify verizon wireless telecom facility to include (n) antenna lease arear, raised roof curb, 2 frp radomes, 3 antennas, 3 radio units, 6 diplexers, and (n) subpanel 100amp. remove (e) cabinet and subpanel and concrete padDetails
ref 201502259357- to modify verizon wireless telecom facility to include (n) antenna lease arear, raised roof curb, 2 frp radomes, 3 antennas, 3 radio units, 6 diplexers, and (n) subpanel 100amp. remove (e) cabinet and subpanel and concrete pad | $195,000 | |
| Aug 26, 2025 | Completed final sign-off Nov 2025 | 799 Valencia St | R&L Maintenance & Janitorial Inc | refurbish & reconnect original hood - e) exhaust system & ductwork to remain, re-oganize e) equipment & counter area. no exterior workDetails
refurbish & reconnect original hood - e) exhaust system & ductwork to remain, re-oganize e) equipment & counter area. no exterior work | $10,000 |
| May 18, 2023 | Expired or cancelled cancelled Jan 2026 | 799 Valencia St | Pacific Engineering & Construction Inc. | mandatory sf abe program abe# 201907025957, doorway sized to permit, sidewalk entrance door, automatic door, new hardware.Details
mandatory sf abe program abe# 201907025957, doorway sized to permit, sidewalk entrance door, automatic door, new hardware. | |
| Aug 29, 2022 | Completed final sign-off Oct 2022 | 799 Valencia St | A M Rocca Inc. | restoration of a fire damaged existing restaurant storage. no change to envelope and wall partitionDetails
restoration of a fire damaged existing restaurant storage. no change to envelope and wall partition | $35,000 |
| Oct 7, 2019 | Never finaled issued Oct 2019, no final | 799 Valencia St | Bay Star Fire Protection, Inc | to correct address from 700 haight street to 799 valencia street. ref app#201909252718Details
to correct address from 700 haight street to 799 valencia street. ref app#201909252718 | |
| Aug 30, 2019 | Expired or cancelled cancelled Jan 2026 | 799 Valencia St | barier removal only in compliance with ordinance #51-16 at commercial tenant space. 791 and 799 valencia stDetails
barier removal only in compliance with ordinance #51-16 at commercial tenant space. 791 and 799 valencia st | $8,000 | |
| Sep 14, 2018 | Completed final sign-off Jul 2020 | 793 Valencia St | Pacific Engineering & Construction Inc. | residedential soft-story retrofit to comply w/ sf ordinance design per iebc appendix a-4. ref commercial soft story 201809140222. maher n/aDetails
residedential soft-story retrofit to comply w/ sf ordinance design per iebc appendix a-4. ref commercial soft story 201809140222. maher n/a | $75,000 |
| Sep 14, 2018 | Completed final sign-off Jul 2020 | 3476 19th St | Pacific Engineering & Construction Inc. | commercial soft-story retrofit to comply w/ sf ordinance design per 2016 iebc appendix a-4. ref residential soft story 201809140221. maher n/aDetails
commercial soft-story retrofit to comply w/ sf ordinance design per 2016 iebc appendix a-4. ref residential soft story 201809140221. maher n/a | $75,000 |
| Feb 1, 2016 | Never finaled issued Feb 2016, no final | 799 Valencia St | street space & mtaDetails
street space & mta | ||
| Feb 25, 2015 | Completed final sign-off Jun 2016 | 799 Valencia St | Jfc Construction Inc. | install verizon wireless micro telecom facility on bldg rooftop: 1-18" diameter faux vent to conceal tri-sector antenna, 4 rrus mounted to new h-frame, 1 new gps antenna, 1 small cell equipment cabinet mounted to the ground.Details
install verizon wireless micro telecom facility on bldg rooftop: 1-18" diameter faux vent to conceal tri-sector antenna, 4 rrus mounted to new h-frame, 1 new gps antenna, 1 small cell equipment cabinet mounted to the ground. | $50,000 |
| Dec 16, 2013 | Completed final sign-off Dec 2014 | 3476 19th St | Slc Inc | to comply with nov#201384922 & 12075. removal of towerstream wifi antennas: 3 antennas & keep one otard.Details
to comply with nov#201384922 & 12075. removal of towerstream wifi antennas: 3 antennas & keep one otard. | $500 |
| Jul 16, 2012 | Never finaled issued Jul 2012, no final | 793 Valencia St | West Coast Roofing Company | reroofingDetails
reroofing | $20,000 |
| Aug 18, 2011 | Never finaled issued Aug 2011, no final | 795 Valencia St | street space permitDetails
street space permit | ||
| Jul 18, 2011 | Completed final sign-off Nov 2011 | 795 Valencia St | Michel Rabaste Construction | revision to application #201105186259 to expand the bar counter for additional seating.Details
revision to application #201105186259 to expand the bar counter for additional seating. | |
| May 18, 2011 | Completed final sign-off Nov 2011 | 795 Valencia St | Maars Woodworking And Building Inc | renovate (e) wine bar; remove (e) bar, one wall, and lavatory. new bar, new partitions at kitchen, new lavatory, new grab bars, and signage at restroom.Details
renovate (e) wine bar; remove (e) bar, one wall, and lavatory. new bar, new partitions at kitchen, new lavatory, new grab bars, and signage at restroom. | $21,900 |
| May 27, 2010 | Never finaled issued May 2010, no final | 3476 19th St | street space and mtaDetails
street space and mta | ||
| Sep 25, 2007 | Completed final sign-off Oct 2007 | 793 Valencia St | Mike Ferrell Construction | comply with requirements of nov3200716372. to include: close transoms above entry doors & cover w/type x gyp. bd. close window openings in stair enclosure with type x gyp. bd. or 1/4" wire glass.Details
comply with requirements of nov3200716372. to include: close transoms above entry doors & cover w/type x gyp. bd. close window openings in stair enclosure with type x gyp. bd. or 1/4" wire glass. | $1,500 |
| Aug 22, 2006 | Never finaled issued Aug 2006, no final | 3476 19th St | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| Oct 27, 2005 | Completed final sign-off Jan 2006 | 793 Valencia St | G L Construction Company | kitchen, bathroom remodel. refinish wooden floor. repaint unit in side rooms. (non structure work)Details
kitchen, bathroom remodel. refinish wooden floor. repaint unit in side rooms. (non structure work) | $18,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.