Back to kitchen remodel contractors
Midas Construction
- Based in
- Dublin
- On San Francisco permits
- Mar 2000 to Apr 2017
- Last 24 months
- 0 permits filed
10 permits since 2000: 10 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 215 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 12, 2017 | Completed final sign-off Apr 2017 | 595 Arguello Bl | apt. 2: interior ktichen remodel, replace kitchen cabinets, counter top, tile floor and paint. upgrade sub-panel. no structural work and exterior work.Details
apt. 2: interior ktichen remodel, replace kitchen cabinets, counter top, tile floor and paint. upgrade sub-panel. no structural work and exterior work. | $14,500 |
| Jun 13, 2008 | Completed final sign-off Jan 2009 | 1960 Vallejo St | kitchen & bathroom remodeling, replacement of 2 kitchen windows & 1 # 1 bathroom window, electrical upgrades in kitchen & 3 bathrooms throught. no structural change, new wall on bathroom for plumbing pipe.Details
kitchen & bathroom remodeling, replacement of 2 kitchen windows & 1 # 1 bathroom window, electrical upgrades in kitchen & 3 bathrooms throught. no structural change, new wall on bathroom for plumbing pipe. | $78,000 |
| Dec 13, 2002 | Completed final sign-off Jul 2003 | 2209 Sutter St | remodeled kitchen, two & half bathroom, removed (e) fireplace, add (n) metal fireplace in living rooDetails
remodeled kitchen, two & half bathroom, removed (e) fireplace, add (n) metal fireplace in living roo | $87,500 |
| Jun 14, 2001 | Completed final sign-off Aug 2002 | 274 Guerrero St | new wood framed terrace at main level w/ stairway remodel kitchen, new addition to cantilevrered bayDetails
new wood framed terrace at main level w/ stairway remodel kitchen, new addition to cantilevrered bay | $80,000 |
| Mar 8, 2000 | Completed final sign-off Dec 2000 | 1960 Vallejo St | kitchen, laundry & bathrm remodel demo framing plumb elect finish trim sheet metal wrk new closetDetails
kitchen, laundry & bathrm remodel demo framing plumb elect finish trim sheet metal wrk new closet | $89,000 |