Block 1543, lot 017
595 Arguello Blvd
- City’s use
- Multi-Family Residential
- Built
- 1963
- Stories
- 2
- Units
- 8
- Rooms
- 8 bedrooms, 8 bathrooms
- Building
- 5,240 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 3, 2025 | Completed final sign-off May 2025 | 595 Arguello Bl | Cepheus Builders Inc | unit 1: kitchen cabinets and 1 bathroom remodel, new flooring, upgrade all angle stops, new shower / tub valve, new bathtub, new paint, new sound proof insulation, new insulation in exterior walls. replace drywall at walls and ceilings with new 5/8" type'x'. no new walls no change to egress.Details
unit 1: kitchen cabinets and 1 bathroom remodel, new flooring, upgrade all angle stops, new shower / tub valve, new bathtub, new paint, new sound proof insulation, new insulation in exterior walls. replace drywall at walls and ceilings with new 5/8" type'x'. no new walls no change to egress. | $40,000 |
| Jul 8, 2022 | Completed final sign-off Apr 2024 | 595 Arguello Bl | Byington Electric Corp | mandatory fire alarm upgrade to comply with california state marchal code #12-001 bulletin. replace fire alarm panel and add lf horns in units and wireless radio communicator.Details
mandatory fire alarm upgrade to comply with california state marchal code #12-001 bulletin. replace fire alarm panel and add lf horns in units and wireless radio communicator. | $15,000 |
| Jun 13, 2022 | Completed final sign-off Oct 2022 | 595 Arguello Bl | Cepheus Builders Inc | apt #6: replace one existing bedroom window off lightwell (not facing st) in-kind. u=.30 maxDetails
apt #6: replace one existing bedroom window off lightwell (not facing st) in-kind. u=.30 max | $800 |
| May 11, 2022 | Completed final sign-off Oct 2022 | 595 Arguello Bl | Cepheus Builders Inc | apt #6: remodel kitchen within same 4 walls - in kind. new: cabinets, countertop, sink/faucet, appliances, flooring.Details
apt #6: remodel kitchen within same 4 walls - in kind. new: cabinets, countertop, sink/faucet, appliances, flooring. | $23,900 |
| Apr 23, 2019 | Completed final sign-off May 2019 | 595 Arguello Bl | Ideal Carpentry** See Contractor's Note* | kitchen remodel, replace cabinets in kind, same layout. 12x12Details
kitchen remodel, replace cabinets in kind, same layout. 12x12 | $15,000 |
| Jul 14, 2017 | Never finaled issued Jul 2017, no final | 595 Arguello Bl | street spaceDetails
street space | ||
| Apr 12, 2017 | Completed final sign-off Apr 2017 | 595 Arguello Bl | Midas Construction | apt. 2: interior ktichen remodel, replace kitchen cabinets, counter top, tile floor and paint. upgrade sub-panel. no structural work and exterior work.Details
apt. 2: interior ktichen remodel, replace kitchen cabinets, counter top, tile floor and paint. upgrade sub-panel. no structural work and exterior work. | $14,500 |
| Jun 9, 2016 | Completed final sign-off Sep 2016 | 595 Arguello Bl | Gil Construction & Assoc Inc. | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $55,000 |
| Jan 17, 2014 | Completed final sign-off Apr 2014 | 595 Arguello Bl | unit #4: remodel kitchen to include new cabinets, countertops, flooring, stove, refrigerator. linoleum floor to be replaced to tile (max 40 sq. ft. tile area) due to increase weight. appliances remain in same location. no doors no windowsDetails
unit #4: remodel kitchen to include new cabinets, countertops, flooring, stove, refrigerator. linoleum floor to be replaced to tile (max 40 sq. ft. tile area) due to increase weight. appliances remain in same location. no doors no windows | $7,000 | |
| Sep 22, 2011 | Never finaled issued Sep 2011, no final | 595 Arguello Bl | remodel kitchen: new counter top, cabinets, floor.Details
remodel kitchen: new counter top, cabinets, floor. | $6,000 | |
| Oct 11, 2000 | Completed final sign-off Apr 2001 | 595 Arguello Bl | Gary Construction Company | repair stucco & garage door ,(new garage door)Details
repair stucco & garage door ,(new garage door) | $2,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.