Back to bathroom remodel contractors
Midas Construction
- Based in
- Dublin
- On San Francisco permits
- Mar 2000 to Apr 2017
- Last 24 months
- 0 permits filed
10 permits since 2000: 10 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 170 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 13, 2008 | Completed final sign-off Jan 2009 | 1960 Vallejo St | kitchen & bathroom remodeling, replacement of 2 kitchen windows & 1 # 1 bathroom window, electrical upgrades in kitchen & 3 bathrooms throught. no structural change, new wall on bathroom for plumbing pipe.Details
kitchen & bathroom remodeling, replacement of 2 kitchen windows & 1 # 1 bathroom window, electrical upgrades in kitchen & 3 bathrooms throught. no structural change, new wall on bathroom for plumbing pipe. | $78,000 |
| Mar 8, 2007 | Completed final sign-off Jul 2007 | 2659 Green St | fourth floor bathroom remodel. bedroom #1 and #2 closet remodel. and replace bedroom #1 and bedroom #2 window. bathroom remodeln included plumbing & electrical work and change window (window will be match existing). bedroom #1 & bedroom #2 closet remodel included electrical work.Details
fourth floor bathroom remodel. bedroom #1 and #2 closet remodel. and replace bedroom #1 and bedroom #2 window. bathroom remodeln included plumbing & electrical work and change window (window will be match existing). bedroom #1 & bedroom #2 closet remodel included electrical work. | $38,500 |
| Dec 13, 2002 | Completed final sign-off Jul 2003 | 2209 Sutter St | remodeled kitchen, two & half bathroom, removed (e) fireplace, add (n) metal fireplace in living rooDetails
remodeled kitchen, two & half bathroom, removed (e) fireplace, add (n) metal fireplace in living roo | $87,500 |
| Jul 28, 2000 | Completed final sign-off Sep 2000 | 1960 Vallejo St | interior demo of bathroom and change into officeDetails
interior demo of bathroom and change into office | $4,300 |