Back to kitchen remodel contractors
Mickey Bailey Const.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2000 to Jun 2021
- Last 24 months
- 0 permits filed
60 permits since 2000: 45 completed, 8 never finaled, 7 expired or cancelled.
Of the 8 never-finaled permits, 3 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 5 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 118 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2021 | Never finaled issued Jun 2021, no final | 165 Moffitt St | kitchen remodel: remove (e) cabinets & replace in kind. install new electric to bring kitche to code. replace plumbing for sink as needed. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)3Details
kitchen remodel: remove (e) cabinets & replace in kind. install new electric to bring kitche to code. replace plumbing for sink as needed. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)3 | $30,000 |
| Aug 23, 2019 | Completed final sign-off Sep 2019 | 362 31st Av | remove and repair dry rot in kitchen. replace in kind. work not visible from street.Details
remove and repair dry rot in kitchen. replace in kind. work not visible from street. | $15,000 |
| Dec 1, 2017 | Completed final sign-off Mar 2018 | 326 Anderson St | kitchen remodeling, no change in walls or openings. r/r cabinets & flooring in-kind. upgrade electrical to code & plumbing on kitchen sink.Details
kitchen remodeling, no change in walls or openings. r/r cabinets & flooring in-kind. upgrade electrical to code & plumbing on kitchen sink. | $42,000 |
| Aug 8, 2016 | Completed final sign-off Mar 2017 | 279 Anderson St | rev to 201605187780;remove(3)existing piers & install new piers @rear of bldg,install(3)new posts,remove & replace (e)2ndflr framing @flr &walls.work to porch area only,per drwg,remodel kitchen in lower unit(281)repl cabinets & counter top.remove lathe & plaster in kitchen & bedrm &install 5/8"shtrkDetails
rev to 201605187780;remove(3)existing piers & install new piers @rear of bldg,install(3)new posts,remove & replace (e)2ndflr framing @flr &walls.work to porch area only,per drwg,remodel kitchen in lower unit(281)repl cabinets & counter top.remove lathe & plaster in kitchen & bedrm &install 5/8"shtrk | $30,000 |
| Mar 6, 2008 | Completed final sign-off May 2008 | 1 Daniel Burnham Ct | unit #820-remove/replace cabinets, counter top, appliances. all locations same as (e), no structural work. all work in kitchen. new lighting/additional lighting - same vents.Details
unit #820-remove/replace cabinets, counter top, appliances. all locations same as (e), no structural work. all work in kitchen. new lighting/additional lighting - same vents. | $12,000 |
| Jul 30, 2007 | Expired or cancelled expired Aug 2008 | 35 Kittredge Tr | remove (e) kitchen. new floor, cabinets & appliances. 50% lighting fluorescent.Details
remove (e) kitchen. new floor, cabinets & appliances. 50% lighting fluorescent. | $25,000 |
| Jul 7, 2006 | Completed final sign-off Dec 2006 | 279 Bartlett St | remove existing cabients and replace check dry rot and replace kitchen remodel no change to partitions or windowsDetails
remove existing cabients and replace check dry rot and replace kitchen remodel no change to partitions or windows | $15,000 |