Mickey Bailey Const.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2000 to Jun 2021
- Last 24 months
- 0 permits filed
60 permits since 2000: 45 completed, 8 never finaled, 7 expired or cancelled.
Of the 8 never-finaled permits, 3 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
8 deck permits: 7 completed, 1 never finaled. Typically 0 days from filing to permit and 99 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 27, 2019 | Completed final sign-off Jan 2020 | 553 29th St | repair and replace dry rot in back of the bldg. repair & replaced decks in kind, under 50%. install 2 new marvin sgd's to replace in existing openings.Details
repair and replace dry rot in back of the bldg. repair & replaced decks in kind, under 50%. install 2 new marvin sgd's to replace in existing openings. | $40,000 |
| May 2, 2018 | Completed final sign-off May 2018 | 159 Nevada St | repair dry rot in rear dec. replace in kind. less thant 50% of deck to be repaired.Details
repair dry rot in rear dec. replace in kind. less thant 50% of deck to be repaired. | $5,000 |
| Dec 1, 2017 | Completed final sign-off Apr 2018 | 135 St Marys Av | remove t-1-11 siding on back of building. inspect for dryrot, repair dry rot.install additional 1/2in cdx plywood w cement board siding. repair dry rot on bottom floor deck & fire escape landing. replace inkind. approx 600sf. install insulation where wall cavity is opened during construction.Details
remove t-1-11 siding on back of building. inspect for dryrot, repair dry rot.install additional 1/2in cdx plywood w cement board siding. repair dry rot on bottom floor deck & fire escape landing. replace inkind. approx 600sf. install insulation where wall cavity is opened during construction. | $27,000 |
| Sep 6, 2006 | Completed final sign-off Sep 2006 | 44 Vulcan Sw | remove decking & joists over 'e' roof & repair railing in kind.Details
remove decking & joists over 'e' roof & repair railing in kind. | $4,000 |
| Mar 17, 2006 | Completed final sign-off Jul 2006 | 55 Lapidge St | remove rear exit door and deck off attic space. remove spiral stairs to attic and replace with pull down stairs. raise 8x8 roof over back porch and raise rear exit door to floor to floor height. all work to comply with 3-r report no 3r-4280Details
remove rear exit door and deck off attic space. remove spiral stairs to attic and replace with pull down stairs. raise 8x8 roof over back porch and raise rear exit door to floor to floor height. all work to comply with 3-r report no 3r-4280 | $15,000 |
| Feb 27, 2004 | Never finaled issued Feb 2004, no final | 1475 Noe St | dry rot repair of existing decks on rear of building less than 50 percent replacementDetails
dry rot repair of existing decks on rear of building less than 50 percent replacement | $20,000 |
| Sep 2, 2003 | Completed final sign-off Oct 2003 | 34 Farnsworth Ln | repair extng deck in kind. replace some joists. repair railings as needed. replace 1x4 t&g per footDetails
repair extng deck in kind. replace some joists. repair railings as needed. replace 1x4 t&g per foot | $10,000 |
| Jul 7, 2003 | Completed final sign-off Jun 2004 | 20 Hill St | remove existing deck (s) & replace per plansDetails
remove existing deck (s) & replace per plans | $25,000 |