Back to bathroom remodel contractors
Mickey Bailey Const.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2000 to Jun 2021
- Last 24 months
- 0 permits filed
60 permits since 2000: 45 completed, 8 never finaled, 7 expired or cancelled.
Of the 8 never-finaled permits, 3 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 23, 2009 | Expired or cancelled expired Dec 2010 | 325 Dorantes Av | gut bathroom (master) insulated as needed, install new elect. install new sink (pedistal ) and toilet. install new tile shower stall.Details
gut bathroom (master) insulated as needed, install new elect. install new sink (pedistal ) and toilet. install new tile shower stall. | $10,000 |
| May 15, 2008 | Completed final sign-off Jul 2008 | 770 Teresita Bl | 2nd floor bathroom - move toilet, new vanity & sink, tile shower. repair lathe and plaster.Details
2nd floor bathroom - move toilet, new vanity & sink, tile shower. repair lathe and plaster. | $15,000 |
| Sep 16, 2005 | Completed final sign-off Jan 2006 | 59 Robblee Av | dry rot removal in main floor bathroom.Details
dry rot removal in main floor bathroom. | $10,000 |
| May 24, 2005 | Completed final sign-off Nov 2005 | 766 Teresita Bl | repair dry rot in bathroom.repair plumbing,install new fixtures.upgrade electrical.no alteration toDetails
repair dry rot in bathroom.repair plumbing,install new fixtures.upgrade electrical.no alteration to | $15,000 |
| Jun 10, 2003 | Never finaled issued Jun 2003, no final | 1647 Golden Gate Av | remove dry rot from bathroom. reframe in kind & replace tub & vanity.Details
remove dry rot from bathroom. reframe in kind & replace tub & vanity. | $10,000 |
| Feb 12, 2003 | Completed final sign-off Jun 2003 | 1720 14th Av | search for plumb, leak & dry rot, upgrade elec, replace tub, shower & toi in 2 1/2 bathsDetails
search for plumb, leak & dry rot, upgrade elec, replace tub, shower & toi in 2 1/2 baths | $30,000 |
| Jul 19, 2002 | Completed final sign-off Nov 2002 | 1298 48th Av | remove dry rot from bathroom, repair/replace bathroom fixtures & finishes & framing as neededDetails
remove dry rot from bathroom, repair/replace bathroom fixtures & finishes & framing as needed | $30,000 |