Back to kitchen remodel contractors
Michael Mc Nulty Construction***Ask Id
- Based in
- San Francisco
- On San Francisco permits
- Oct 2001 to May 2025
- Last 24 months
- 3 permits filed
87 permits since 2000: 72 completed, 1 in progress, 4 never finaled, 10 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 8 completed, 1 in progress, 2 expired or cancelled. Typically 0 days from filing to permit and 145 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 5, 2025 | In progress issued May 2025 | 32 Santa Rosa Av | revision to permit 2023-0106-9807. replace (e) garage slab and footing. replace (e) footing at kitchen.Details
revision to permit 2023-0106-9807. replace (e) garage slab and footing. replace (e) footing at kitchen. | $5,000 |
| Dec 13, 2022 | Completed final sign-off Feb 2026 | 253 05th Av | interior remodel of lower 2 apt. units. relocate bathrooms and remodel kitchens. new powder room in lower unit. rebuild existing exterior exit stairs in kind. rebuild existing front entry steps.Details
interior remodel of lower 2 apt. units. relocate bathrooms and remodel kitchens. new powder room in lower unit. rebuild existing exterior exit stairs in kind. rebuild existing front entry steps. | $207,000 |
| May 19, 2015 | Completed final sign-off Nov 2015 | 1814 Hyde St | renovation of unit 1814 hyde street. install new kitchen cabinets & appliances. install new bathroom fixtures. replace extg windows on south & east facade. install new double glass doors on east facade. install new water heater and furnace. install new lighting & receptacles. install nw laundry rm.Details
renovation of unit 1814 hyde street. install new kitchen cabinets & appliances. install new bathroom fixtures. replace extg windows on south & east facade. install new double glass doors on east facade. install new water heater and furnace. install new lighting & receptacles. install nw laundry rm. | $80,000 |
| Oct 5, 2011 | Completed final sign-off Feb 2012 | 2021 Jefferson St | remodel 2 kitchen and reframe 2 windows on 2 units. reframe door opening inside and bathroom remodel and two new bathrooms.Details
remodel 2 kitchen and reframe 2 windows on 2 units. reframe door opening inside and bathroom remodel and two new bathrooms. | $20,000 |
| Aug 10, 2006 | Completed final sign-off Mar 2007 | 275 Eureka St | 275 remove lath and plaster from kitchen and wall finishes. approx 20ft. 277 remove and replace plaster on kitchen area.Details
275 remove lath and plaster from kitchen and wall finishes. approx 20ft. 277 remove and replace plaster on kitchen area. | $1,500 |
| Aug 10, 2006 | Completed final sign-off Mar 2007 | 277 Eureka St | kitchen remodel. no structural work.Details
kitchen remodel. no structural work. | $7,854 |
| May 5, 2006 | Completed final sign-off Jun 2006 | 71 Gladstone Dr | kitchen remodel . remove and replacement of cabinets and new sheetrock and paint new electrical lights in ceiling and gfc in kitchen sink area.Details
kitchen remodel . remove and replacement of cabinets and new sheetrock and paint new electrical lights in ceiling and gfc in kitchen sink area. | $8,400 |
| Jul 28, 2003 | Completed final sign-off Aug 2003 | 981 Grove St | replace 12 steps & kitchen and replace stringer & framing for stair's prime & paint. no hand rails.Details
replace 12 steps & kitchen and replace stringer & framing for stair's prime & paint. no hand rails. | $9,000 |
| Dec 20, 2002 | Completed final sign-off Jan 2003 | 1563 23rd Av | to renew app#2002/04/15/3907 for remaining work.kitchen remodel & new tiled flr & countertop.no struDetails
to renew app#2002/04/15/3907 for remaining work.kitchen remodel & new tiled flr & countertop.no stru | $10,000 |
| Apr 15, 2002 | Expired or cancelled expired Oct 2002 | 1563 23rd Av | kitchen remodel and new tile floor and counter top. no structural work.Details
kitchen remodel and new tile floor and counter top. no structural work. | $10,000 |
| Oct 22, 2001 | Expired or cancelled expired Feb 2002 | 1081 Ashbury St | replacement of kitchen sink.Details
replacement of kitchen sink. | $150 |