Permit GraphShortlistSan Francisco building permits since 2000

Michael Mc Nulty Construction***Ask Id

Contractor license
771479
State license record
Based in
San Francisco
On San Francisco permits
Oct 2001 to Oct 2026
Last 24 months
4 permits filed

88 permits since 2000: 72 completed, 2 in progress, 4 never finaled, 10 expired or cancelled.

Of the 4 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Deck permits

AllRoof deck 2Deck 6Stairs 14Kitchen remodel 11Bathroom remodel 7

6 deck permits: 5 completed, 1 never finaled. Typically 2 days from filing to permit and 84 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 13, 2024Completed
final sign-off Feb 2026
253 05th Avrevision to pa 202212138217, pa 202304196035, and pa 202305318936. replace existing stair from rear yard to alley; modify retaining wall per geotechnical report; clarify construction type (va); revise rear deck and provide additional structural details for previously approved rear deck. repair and
Details
Permit
202402025191
Permit issued
Jul 21, 2025
Final sign-off
Feb 19, 2026

revision to pa 202212138217, pa 202304196035, and pa 202305318936. replace existing stair from rear yard to alley; modify retaining wall per geotechnical report; clarify construction type (va); revise rear deck and provide additional structural details for previously approved rear deck. repair and

Open the permit page

$15,000
Jun 24, 2021Never finaled
issued Jun 2021, no final
266 Maywood Drreplacement of (e) damaged wood framing at exterior wall and patio, in-kind replcement of patio stairs. rev to pa202104198743. in kind replacement of balcony decking
Details
Permit
202106243168
Permit issued
Jun 28, 2021

replacement of (e) damaged wood framing at exterior wall and patio, in-kind replcement of patio stairs. rev to pa202104198743. in kind replacement of balcony decking

Open the permit page

$100,000
Jun 2, 2017Completed
final sign-off Jun 2017
591 46th Avdry rot repair of front porch, replace one dry rotten joist and deck board, 20% of deck porch.
Details
Permit
201706028228
Permit issued
Jun 2, 2017
Final sign-off
Jun 9, 2017

dry rot repair of front porch, replace one dry rotten joist and deck board, 20% of deck porch.

Open the permit page

$3,500
Oct 10, 2012Completed
final sign-off Dec 2012
1082 De Haro Stdry rot repair of rear top deck 25%, revision to appn. 201209069025 dry rot repair of siding and trim at front of building street side 25% in kind repair north and south side 10% repair in kind
Details
Permit
201210101716
Permit issued
Oct 10, 2012
Final sign-off
Dec 3, 2012

dry rot repair of rear top deck 25%, revision to appn. 201209069025 dry rot repair of siding and trim at front of building street side 25% in kind repair north and south side 10% repair in kind

Open the permit page

$25,000
Jul 30, 2012Completed
final sign-off Oct 2012
3099 Washington Stremoval and replacement of eight deck footings in kind less than 50%
Details
Permit
201207306000
Permit issued
Jul 31, 2012
Final sign-off
Oct 23, 2012

removal and replacement of eight deck footings in kind less than 50%

Open the permit page

$6,200
Aug 11, 2009Completed
final sign-off May 2010
4706 25th Strevision to 200905229028 to show details for retaining walls at property line, fire walls at property line, deck framing plan provided for deck
Details
Permit
200908114562
Permit issued
Aug 13, 2009
Final sign-off
May 3, 2010

revision to 200905229028 to show details for retaining walls at property line, fire walls at property line, deck framing plan provided for deck

Open the permit page

$18,000