Back to bathroom remodel contractors
Michael Mc Nulty Construction***Ask Id
- Based in
- San Francisco
- On San Francisco permits
- Oct 2001 to May 2025
- Last 24 months
- 3 permits filed
87 permits since 2000: 72 completed, 1 in progress, 4 never finaled, 10 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 1 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 13, 2022 | Completed final sign-off Feb 2026 | 253 05th Av | interior remodel of lower 2 apt. units. relocate bathrooms and remodel kitchens. new powder room in lower unit. rebuild existing exterior exit stairs in kind. rebuild existing front entry steps.Details
interior remodel of lower 2 apt. units. relocate bathrooms and remodel kitchens. new powder room in lower unit. rebuild existing exterior exit stairs in kind. rebuild existing front entry steps. | $207,000 |
| Mar 15, 2016 | Completed final sign-off May 2016 | 735 Waller St | dry rot repair 125sf in hallway at bathroom area.Details
dry rot repair 125sf in hallway at bathroom area. | $5,500 |
| May 19, 2015 | Completed final sign-off Nov 2015 | 1814 Hyde St | renovation of unit 1814 hyde street. install new kitchen cabinets & appliances. install new bathroom fixtures. replace extg windows on south & east facade. install new double glass doors on east facade. install new water heater and furnace. install new lighting & receptacles. install nw laundry rm.Details
renovation of unit 1814 hyde street. install new kitchen cabinets & appliances. install new bathroom fixtures. replace extg windows on south & east facade. install new double glass doors on east facade. install new water heater and furnace. install new lighting & receptacles. install nw laundry rm. | $80,000 |
| Oct 16, 2012 | Completed final sign-off Aug 2016 | 2818 Diamond St | remodel bathroom 2 and powder room on 2nd floor. nw plumbing fixtures and finishes. level floor in bathroom 2 and powder room. replace existing windows and exterior door in bathroom and powder roomDetails
remodel bathroom 2 and powder room on 2nd floor. nw plumbing fixtures and finishes. level floor in bathroom 2 and powder room. replace existing windows and exterior door in bathroom and powder room | $13,074 |
| Oct 5, 2011 | Completed final sign-off Feb 2012 | 2021 Jefferson St | remodel 2 kitchen and reframe 2 windows on 2 units. reframe door opening inside and bathroom remodel and two new bathrooms.Details
remodel 2 kitchen and reframe 2 windows on 2 units. reframe door opening inside and bathroom remodel and two new bathrooms. | $20,000 |
| Jul 1, 2010 | Completed final sign-off Feb 2011 | 4385 25th St | revision to pa# 2008.05.29.3185. elimination of east balcony on 3rd fl, reconfigure bath and closet on 2nd fl. staged const. of ftg on west porperty line, shoring plan for (e) struc, change size of skylights.Details
revision to pa# 2008.05.29.3185. elimination of east balcony on 3rd fl, reconfigure bath and closet on 2nd fl. staged const. of ftg on west porperty line, shoring plan for (e) struc, change size of skylights. | $4,500 |
| May 11, 2007 | Completed final sign-off Sep 2007 | 521 Broderick St | work @ bottom floor only. remodel bathroom. new electrical feed from panel in garage. new tub, new sheetrock & painting. new window same deminsion. new stone flooring.Details
work @ bottom floor only. remodel bathroom. new electrical feed from panel in garage. new tub, new sheetrock & painting. new window same deminsion. new stone flooring. | $15,000 |