Michael De Jong Construction
- Based in
- Petaluma
- On San Francisco permits
- Jul 2015 to Jan 2022
- Last 24 months
- 0 permits filed
25 permits since 2000: 24 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
7 stairs permits: 7 completed. Typically 21 days from filing to permit and 234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 18, 2022 | Completed final sign-off Feb 2022 | 804 22nd St | remove and dispose existing deck and stair at rear facadeDetails
remove and dispose existing deck and stair at rear facade | $2,500 |
| Sep 3, 2021 | Completed final sign-off Oct 2022 | 20 Walter St | at front setback, replace in kind ext. entry stairs. at rear yard, replace in kind ext stairs. at 2/f, remodel kitchen, bath, laundry and sunroom. at 3/f, remodel bath, sunroom. at rear elevation, replace siding and windows. new furnace for lower unit. new heat pump for upper unit.Details
at front setback, replace in kind ext. entry stairs. at rear yard, replace in kind ext stairs. at 2/f, remodel kitchen, bath, laundry and sunroom. at 3/f, remodel bath, sunroom. at rear elevation, replace siding and windows. new furnace for lower unit. new heat pump for upper unit. | $70,000 |
| Oct 15, 2020 | Completed final sign-off Sep 2021 | 1428 Shotwell St | dry rot repair at garage and stair due to severe leakingDetails
dry rot repair at garage and stair due to severe leaking | $10,000 |
| Jun 23, 2017 | Completed final sign-off Oct 2020 | 2280 Bay St | interior remodel, stair modification, finish parts of existing 1st floor to living space, 3rd floor re-arrangement of spaces. all within existing exterior walls. maher naDetails
interior remodel, stair modification, finish parts of existing 1st floor to living space, 3rd floor re-arrangement of spaces. all within existing exterior walls. maher na | $195,000 |
| May 20, 2016 | Completed final sign-off Jun 2016 | 2655 Broderick St | revision to pa 2013-0912-6711 to show construction of metal stairs as request by dbi plan reviewerDetails
revision to pa 2013-0912-6711 to show construction of metal stairs as request by dbi plan reviewer | $1,650 |
| Apr 12, 2016 | Completed final sign-off Nov 2016 | 2639 44th Av | new 2nd floor deck & stairs to rear yard. interior renovations to 1st floor. fire rated wall will be a max of 8'8" highDetails
new 2nd floor deck & stairs to rear yard. interior renovations to 1st floor. fire rated wall will be a max of 8'8" high | $35,400 |
| Nov 17, 2015 | Completed final sign-off Aug 2016 | 232 San Carlos St | new foundation, expand (e) living space - bedrm, great room, bathrm remodel and add sprinklers on 1st floor. new stairs to 1st level from 2nd level. remodel power bath on 2nd level, remodel master bedrm, master bath & hall bath on 3rd floor. replace (e) front windowsDetails
new foundation, expand (e) living space - bedrm, great room, bathrm remodel and add sprinklers on 1st floor. new stairs to 1st level from 2nd level. remodel power bath on 2nd level, remodel master bedrm, master bath & hall bath on 3rd floor. replace (e) front windows | $95,000 |