Back to bathroom remodel contractors
Michael De Jong Construction
- Based in
- Petaluma
- On San Francisco permits
- Jul 2015 to Jan 2022
- Last 24 months
- 0 permits filed
25 permits since 2000: 24 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 never finaled. Typically 28 days from filing to permit and 332 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 19, 2021 | Completed final sign-off Sep 2022 | 622 Spruce St | replace existing plumbing fixtures and tiles in 3 bathrooms and 1 powder room. no change to layout.Details
replace existing plumbing fixtures and tiles in 3 bathrooms and 1 powder room. no change to layout. | $15,000 |
| Sep 3, 2021 | Completed final sign-off Oct 2022 | 20 Walter St | at front setback, replace in kind ext. entry stairs. at rear yard, replace in kind ext stairs. at 2/f, remodel kitchen, bath, laundry and sunroom. at 3/f, remodel bath, sunroom. at rear elevation, replace siding and windows. new furnace for lower unit. new heat pump for upper unit.Details
at front setback, replace in kind ext. entry stairs. at rear yard, replace in kind ext stairs. at 2/f, remodel kitchen, bath, laundry and sunroom. at 3/f, remodel bath, sunroom. at rear elevation, replace siding and windows. new furnace for lower unit. new heat pump for upper unit. | $70,000 |
| Jan 7, 2021 | Completed final sign-off Mar 2021 | 1428 Shotwell St | remodel existing bathroom, wet bar and family room in kind.Details
remodel existing bathroom, wet bar and family room in kind. | $35,000 |
| Aug 13, 2018 | Never finaled issued Dec 2020, no final | 804 22nd St | to comply w/ nov 201535251 to remove rear deck. vertical addition of a (2) 3rd fl & horizontal addition @ 1st fl rear. (e) unit 806-a will be relocated to 2nd fl, unit 804 will be expanded to (n) 3rd fl w/ living, dining, kitchen area, bath & bethroom located there w roof decks.Details
to comply w/ nov 201535251 to remove rear deck. vertical addition of a (2) 3rd fl & horizontal addition @ 1st fl rear. (e) unit 806-a will be relocated to 2nd fl, unit 804 will be expanded to (n) 3rd fl w/ living, dining, kitchen area, bath & bethroom located there w roof decks. | $300,000 |
| Nov 17, 2015 | Completed final sign-off Aug 2016 | 232 San Carlos St | new foundation, expand (e) living space - bedrm, great room, bathrm remodel and add sprinklers on 1st floor. new stairs to 1st level from 2nd level. remodel power bath on 2nd level, remodel master bedrm, master bath & hall bath on 3rd floor. replace (e) front windowsDetails
new foundation, expand (e) living space - bedrm, great room, bathrm remodel and add sprinklers on 1st floor. new stairs to 1st level from 2nd level. remodel power bath on 2nd level, remodel master bedrm, master bath & hall bath on 3rd floor. replace (e) front windows | $95,000 |
| Jul 7, 2015 | Completed final sign-off Dec 2020 | 1430 15th Av | new full third story addition (3 bedrooms & 2 baths) , new roof deck and sunroom with roof deck above fourth floor. interior remodel.Details
new full third story addition (3 bedrooms & 2 baths) , new roof deck and sunroom with roof deck above fourth floor. interior remodel. | $195,000 |