Back to kitchen remodel contractors
Michael De Jong Construction
- Based in
- Petaluma
- On San Francisco permits
- Jul 2015 to Jan 2022
- Last 24 months
- 0 permits filed
25 permits since 2000: 24 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 never finaled. Typically 119 days from filing to permit and 316 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 3, 2021 | Completed final sign-off Oct 2022 | 20 Walter St | at front setback, replace in kind ext. entry stairs. at rear yard, replace in kind ext stairs. at 2/f, remodel kitchen, bath, laundry and sunroom. at 3/f, remodel bath, sunroom. at rear elevation, replace siding and windows. new furnace for lower unit. new heat pump for upper unit.Details
at front setback, replace in kind ext. entry stairs. at rear yard, replace in kind ext stairs. at 2/f, remodel kitchen, bath, laundry and sunroom. at 3/f, remodel bath, sunroom. at rear elevation, replace siding and windows. new furnace for lower unit. new heat pump for upper unit. | $70,000 |
| Dec 19, 2018 | Completed final sign-off Jan 2020 | 2719 35th Av | addition of new accessory dwelling unit per ordinance 95-17. infill addition at rear yard, new bahroom, bedroom,living room and kitchen at new adu. new rear yard deckDetails
addition of new accessory dwelling unit per ordinance 95-17. infill addition at rear yard, new bahroom, bedroom,living room and kitchen at new adu. new rear yard deck | $79,000 |
| Aug 13, 2018 | Never finaled issued Dec 2020, no final | 804 22nd St | to comply w/ nov 201535251 to remove rear deck. vertical addition of a (2) 3rd fl & horizontal addition @ 1st fl rear. (e) unit 806-a will be relocated to 2nd fl, unit 804 will be expanded to (n) 3rd fl w/ living, dining, kitchen area, bath & bethroom located there w roof decks.Details
to comply w/ nov 201535251 to remove rear deck. vertical addition of a (2) 3rd fl & horizontal addition @ 1st fl rear. (e) unit 806-a will be relocated to 2nd fl, unit 804 will be expanded to (n) 3rd fl w/ living, dining, kitchen area, bath & bethroom located there w roof decks. | $300,000 |