Metro Construction Inc.
- Based in
- Tiburon
- On San Francisco permits
- Jun 2004 to Sep 2025
- Last 24 months
- 2 permits filed
46 permits since 2000: 39 completed, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 61 days from filing to permit and 131 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2025 | Completed final sign-off Mar 2026 | 85 Burnett Av | convert entire first floor into adu, remove internal circular stair from 1st flr to 2nd flr. infill flr/clg where stair removed. no other work is required to convert existing space into an adu. note: entire 1st flr was existing, unconditioned space prior to 2012. space was completely built out intoDetails
convert entire first floor into adu, remove internal circular stair from 1st flr to 2nd flr. infill flr/clg where stair removed. no other work is required to convert existing space into an adu. note: entire 1st flr was existing, unconditioned space prior to 2012. space was completely built out into | $7,500 |
| Dec 3, 2012 | Completed final sign-off Nov 2013 | 2501 Bryant St | install (n) stair case from bsmt to ground fl & mezzanie. install (n) ada toilet room& accessibility to space by altering sidewalk. upgrade egress enclosure from bsmt.Details
install (n) stair case from bsmt to ground fl & mezzanie. install (n) ada toilet room& accessibility to space by altering sidewalk. upgrade egress enclosure from bsmt. | $50,000 |
| Dec 2, 2008 | Completed final sign-off Jan 2009 | 525 Market St | install smoke curtain at ceiling in extg stairway- sprinklers under separate permit- correction of sffd nov dated 9-15-2008Details
install smoke curtain at ceiling in extg stairway- sprinklers under separate permit- correction of sffd nov dated 9-15-2008 | $10,000 |