Back to kitchen remodel contractors
Metro Construction Inc.
- Based in
- Tiburon
- On San Francisco permits
- Jun 2004 to Sep 2025
- Last 24 months
- 2 permits filed
46 permits since 2000: 39 completed, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 0 days from filing to permit and 192 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 26, 2023 | Completed final sign-off Dec 2023 | 1572 08th Av | remodel kitchen in smae location, close off doorway to kitchen; install new bathroom in existing room; install 1 new window in bathroom facing rear yard. no change to exterior (except rear yard window) or changes to foot print of house. no additional spaceDetails
remodel kitchen in smae location, close off doorway to kitchen; install new bathroom in existing room; install 1 new window in bathroom facing rear yard. no change to exterior (except rear yard window) or changes to foot print of house. no additional space | $45,000 |
| Jan 17, 2014 | Completed final sign-off Apr 2014 | 801 Fillmore St | apt 22:remodel extg apt as follows:relocate kitchen, relocate vainity, add fau, r/r window, minor wall work, upgrade electrical inside apt. new floor finish and paint.Details
apt 22:remodel extg apt as follows:relocate kitchen, relocate vainity, add fau, r/r window, minor wall work, upgrade electrical inside apt. new floor finish and paint. | $37,500 |
| Jun 14, 2013 | Completed final sign-off Jun 2013 | 2841 23rd St | increase cost of job under permit # 201210252797, bathroom & kitchen remodel, no structural work per building inspector comment.Details
increase cost of job under permit # 201210252797, bathroom & kitchen remodel, no structural work per building inspector comment. | $15,000 |
| Oct 25, 2012 | Completed final sign-off Jun 2013 | 2841 23rd St | bathroom and kitchen remodel. retile bathroom.remove and replace cabinetry in kitchen. include sink removal and replace and appliances. no walls to be moved. no structural work.Details
bathroom and kitchen remodel. retile bathroom.remove and replace cabinetry in kitchen. include sink removal and replace and appliances. no walls to be moved. no structural work. | $12,375 |
| Nov 6, 2006 | Completed final sign-off Oct 2007 | 2251 Green St | revision to pa# 2005/05/10/2065. remove a load bearing wall with new steel beam & footing between kitchen & dining room.Details
revision to pa# 2005/05/10/2065. remove a load bearing wall with new steel beam & footing between kitchen & dining room. | $10,000 |
| May 10, 2005 | Completed final sign-off Oct 2007 | 2251 Green St | horizontal addition of 2 floors to the rear of bldg. enlarge family room on ground floor, re-organize kitchen/bath. rework 1 bedroom & add a new 1. rework master bathroom.Details
horizontal addition of 2 floors to the rear of bldg. enlarge family room on ground floor, re-organize kitchen/bath. rework 1 bedroom & add a new 1. rework master bathroom. | $95,000 |