Mc Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Mar 2022 to Jul 2026
- Last 24 months
- 6 permits filed
17 permits since 2000: 13 completed, 3 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 1 completed, 1 in progress. Typically 56 days from filing to permit and 302 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2025 | Completed final sign-off Sep 2026 | 235 Coleridge St | ground floor: to add (1) bathroom, (1) family room, and an office. 2/f: to add an interior stair to the ground floor.Details
ground floor: to add (1) bathroom, (1) family room, and an office. 2/f: to add an interior stair to the ground floor. | $80,000 |
| Jul 30, 2024 | In progress filed Jul 2024, not yet issued | 335 Casitas Av | replace existing catch basin at front of property (to the right of stairs) permeability to remain. all work below grade.Details
replace existing catch basin at front of property (to the right of stairs) permeability to remain. all work below grade. | $300 |