Mc Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Mar 2022 to Jul 2026
- Last 24 months
- 6 permits filed
17 permits since 2000: 13 completed, 3 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 in progress. Typically 1 days from filing to permit and 302 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2026 | In progress issued Jul 2026 | 888 07th St | 1 kitchen remodel, 2 bathroom remodel, update lighting and plumbing as needed. all work in kindDetails
1 kitchen remodel, 2 bathroom remodel, update lighting and plumbing as needed. all work in kind | $50,000 |
| Sep 18, 2025 | Completed final sign-off Sep 2026 | 235 Coleridge St | ground floor: to add (1) bathroom, (1) family room, and an office. 2/f: to add an interior stair to the ground floor.Details
ground floor: to add (1) bathroom, (1) family room, and an office. 2/f: to add an interior stair to the ground floor. | $80,000 |
| Apr 4, 2025 | Completed final sign-off May 2026 | 1553 Masonic Av | revision to pa#202410233555. expand kitchen in to garage. change rear sliding door size. replace bathroom flooring. change window in bedroom. add sheer walls. mechanical room added to drawingsDetails
revision to pa#202410233555. expand kitchen in to garage. change rear sliding door size. replace bathroom flooring. change window in bedroom. add sheer walls. mechanical room added to drawings | $35,000 |
| Mar 19, 2025 | Completed final sign-off Jun 2025 | 1553 Masonic Av | demo existing ceiling, install insulation, new 5/8 drywall. new ceilings throughout the apartment, approx. 1100 sq. ft area. new electrical panel. drywall repairs, re-locate toilet, remove door to combine bathroom as one unit.Details
demo existing ceiling, install insulation, new 5/8 drywall. new ceilings throughout the apartment, approx. 1100 sq. ft area. new electrical panel. drywall repairs, re-locate toilet, remove door to combine bathroom as one unit. | $48,000 |
| Oct 23, 2024 | Completed final sign-off May 2026 | 1553 Masonic Av | g/f at rear of the building -reconditioning entire place, remodel all kitchens, bathrooms, drywall/insulation, replace window with new sliding door @ rear, new flooring, laundry connection. new subpanel. all new plumbing.Details
g/f at rear of the building -reconditioning entire place, remodel all kitchens, bathrooms, drywall/insulation, replace window with new sliding door @ rear, new flooring, laundry connection. new subpanel. all new plumbing. | $97,000 |
| Jan 31, 2023 | Completed final sign-off Mar 2023 | 245 Harkness Av | bathroom remodel: new electric, new plumbing. vanity relocation to the wall across.Details
bathroom remodel: new electric, new plumbing. vanity relocation to the wall across. | $8,000 |