Back to kitchen remodel contractors
Mc Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Mar 2022 to Jul 2026
- Last 24 months
- 6 permits filed
17 permits since 2000: 13 completed, 3 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 in progress. Typically 46 days from filing to permit and 306 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2026 | In progress issued Jul 2026 | 888 07th St | 1 kitchen remodel, 2 bathroom remodel, update lighting and plumbing as needed. all work in kindDetails
1 kitchen remodel, 2 bathroom remodel, update lighting and plumbing as needed. all work in kind | $50,000 |
| Apr 4, 2025 | Completed final sign-off May 2026 | 1553 Masonic Av | revision to pa#202410233555. expand kitchen in to garage. change rear sliding door size. replace bathroom flooring. change window in bedroom. add sheer walls. mechanical room added to drawingsDetails
revision to pa#202410233555. expand kitchen in to garage. change rear sliding door size. replace bathroom flooring. change window in bedroom. add sheer walls. mechanical room added to drawings | $35,000 |
| Oct 23, 2024 | Completed final sign-off May 2026 | 1553 Masonic Av | g/f at rear of the building -reconditioning entire place, remodel all kitchens, bathrooms, drywall/insulation, replace window with new sliding door @ rear, new flooring, laundry connection. new subpanel. all new plumbing.Details
g/f at rear of the building -reconditioning entire place, remodel all kitchens, bathrooms, drywall/insulation, replace window with new sliding door @ rear, new flooring, laundry connection. new subpanel. all new plumbing. | $97,000 |
| Nov 8, 2023 | Completed final sign-off Jun 2025 | 57 Joost Av | remove (e) damaged rear decks. add (n) 155sqft rear deck accessible from upper lvl. add (n) 217sqft rear deck at grade lvl. repair dryrot at rear facade & replace siding in-kind. add (n) windows & doors at rear facade. convert grd lvl storage rm to 630 sqft gross conditioned secondary kitchenette...Details
remove (e) damaged rear decks. add (n) 155sqft rear deck accessible from upper lvl. add (n) 217sqft rear deck at grade lvl. repair dryrot at rear facade & replace siding in-kind. add (n) windows & doors at rear facade. convert grd lvl storage rm to 630 sqft gross conditioned secondary kitchenette... | $120,000 |
| Mar 25, 2022 | Completed final sign-off Dec 2022 | 345 Casitas Av | 1/f: kitchen remodel and new family room. new electrical and plumbing in area of work. relocate furnace and hotwater heater.Details
1/f: kitchen remodel and new family room. new electrical and plumbing in area of work. relocate furnace and hotwater heater. | $55,000 |