Back to kitchen remodel contractors
Mc Cutcheon Construction Co.
- Based in
- Berkeley
- On San Francisco permits
- Jul 2002 to Jul 2024
- Last 24 months
- 0 permits filed
88 permits since 2000: 73 completed, 6 never finaled, 9 expired or cancelled.
Of the 6 never-finaled permits, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
20 kitchen remodel permits: 20 completed. Typically 0 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 7, 2021 | Completed final sign-off Aug 2022 | 2250 Bush St | remodel 3 (e) bathrooms & kitchen. relocate (1) bathroom. create (n) bedroom & closet area. relocate (e) laundry on 2nd floor. install (1) (n) window. sash replacements at (7) locations in wood w/ intergal ogee.Details
remodel 3 (e) bathrooms & kitchen. relocate (1) bathroom. create (n) bedroom & closet area. relocate (e) laundry on 2nd floor. install (1) (n) window. sash replacements at (7) locations in wood w/ intergal ogee. | $261,937 |
| Jul 16, 2018 | Completed final sign-off Jul 2019 | 1734 Waller St | kitchen remodel, bath remodel, window replacement, widen garage doorDetails
kitchen remodel, bath remodel, window replacement, widen garage door | $175,000 |
| Apr 14, 2016 | Completed final sign-off Mar 2017 | 1960 Vallejo St | interior remodel of unit 7. kitchen remodel, remove wall in kitchen. remodel master bath and closet. remodel powder rm converting from full bath to 1/2 bath. new tile bath 3. interior work only. no change of use.Details
interior remodel of unit 7. kitchen remodel, remove wall in kitchen. remodel master bath and closet. remodel powder rm converting from full bath to 1/2 bath. new tile bath 3. interior work only. no change of use. | $375,000 |
| Nov 13, 2015 | Completed final sign-off Feb 2016 | 1980 Sutter St | unit #205, remodel (e) kitchen, bathroom & bedroom closet. maher naDetails
unit #205, remodel (e) kitchen, bathroom & bedroom closet. maher na | $40,000 |
| Aug 13, 2015 | Completed final sign-off Mar 2016 | 60 Rausch St | remodel e kitchen and bath in kind maher not reqDetails
remodel e kitchen and bath in kind maher not req | $40,000 |
| Jun 17, 2015 | Completed final sign-off Jan 2016 | 156 Lombard St | unit #11 - kitchen, master bath renovation, electrical upgrades. n/a maher ordinanceDetails
unit #11 - kitchen, master bath renovation, electrical upgrades. n/a maher ordinance | $85,000 |
| Feb 5, 2014 | Completed final sign-off Jul 2014 | 601 Van Ness Av | new countertops, kitchen and baths. new cabinets in bathrooms, closet shelving, fireplace surround. new flooring, stair railing, lighting.Details
new countertops, kitchen and baths. new cabinets in bathrooms, closet shelving, fireplace surround. new flooring, stair railing, lighting. | $72,000 |
| Jan 3, 2014 | Completed final sign-off Apr 2014 | 510 Los Palmos Dr | interior remodel, kitchen, powder room, master bath. new gas fire insert, new skylight, new shower panDetails
interior remodel, kitchen, powder room, master bath. new gas fire insert, new skylight, new shower pan | $76,000 |
| Mar 27, 2013 | Completed final sign-off Apr 2013 | 614 Clarendon Av | powder room finishes renovation w/small added closet for use as painting 20"x16" relocation for (e0 scone light fan swithces. adding tile on floor, adding tile in kitchen floor.Details
powder room finishes renovation w/small added closet for use as painting 20"x16" relocation for (e0 scone light fan swithces. adding tile on floor, adding tile in kitchen floor. | $14,611 |
| Jun 8, 2012 | Completed final sign-off Jan 2013 | 1317 Hyde St | 3rd fl reduction in scope (removed transon lites between hallway & kitchen) & changed double pocket door between kitchen & dining to single. also no longer changing walls & doors in laundry room). changed electrical plans & added gs insert & walls sink in powder room. revision to pa#201107019360.Details
3rd fl reduction in scope (removed transon lites between hallway & kitchen) & changed double pocket door between kitchen & dining to single. also no longer changing walls & doors in laundry room). changed electrical plans & added gs insert & walls sink in powder room. revision to pa#201107019360. | |
| Oct 12, 2011 | Completed final sign-off Oct 2012 | 1750 Taylor St | unit #1803: full interior remodel to include new glazing at existing window locations, (e) kitchen remodel, three (e) bathrooms remodel, new finishes throughout, and two new shower pans.Details
unit #1803: full interior remodel to include new glazing at existing window locations, (e) kitchen remodel, three (e) bathrooms remodel, new finishes throughout, and two new shower pans. | $285,000 |
| Jul 28, 2011 | Completed final sign-off Jul 2012 | 1501 Ortega St | remodel kitchen, bathroom. replace 2 extg skylights, same location.Details
remodel kitchen, bathroom. replace 2 extg skylights, same location. | $50,000 |
| Jul 1, 2011 | Completed final sign-off Jan 2013 | 1317 Hyde St | apt #3: kitchen remodel: upgrade electrical service, outlets, lighting; no structural workDetails
apt #3: kitchen remodel: upgrade electrical service, outlets, lighting; no structural work | $50,000 |
| Mar 17, 2011 | Completed final sign-off May 2011 | 631 27th St | remodel kitchen: new (front) window @ existing location & new skylight.Details
remodel kitchen: new (front) window @ existing location & new skylight. | $24,950 |
| Feb 28, 2011 | Completed final sign-off May 2011 | 1853 Scott St | unit 1853 scott st:partial kitchen remodel. replace 2 extg windows, new skylight, new duct and outlets, new electrical, panel, bath finishes and sink. uint 1855 scott:replace extg washer/dryer, bathroom finishes, sink, new duct, elect. panel.Details
unit 1853 scott st:partial kitchen remodel. replace 2 extg windows, new skylight, new duct and outlets, new electrical, panel, bath finishes and sink. uint 1855 scott:replace extg washer/dryer, bathroom finishes, sink, new duct, elect. panel. | $28,500 |
| Feb 9, 2011 | Completed final sign-off Aug 2011 | 2735 Sutter St | remodel kitchen and bathroom. 2 new windows in extg locations. not visible from the street. add skylight in bath room and at kitchen.Details
remodel kitchen and bathroom. 2 new windows in extg locations. not visible from the street. add skylight in bath room and at kitchen. | $42,000 |
| Jun 9, 2009 | Completed final sign-off Nov 2009 | 424 Frederick St | remodel kitchen. int. remodel, new lighting and elec., remodel bath and powder rm. new plumbing fixtures. add struc. beam/header bth kitch/fam.rm. replace furnace in garage/mech room.(window replacement sep permit)Details
remodel kitchen. int. remodel, new lighting and elec., remodel bath and powder rm. new plumbing fixtures. add struc. beam/header bth kitch/fam.rm. replace furnace in garage/mech room.(window replacement sep permit) | $109,500 |
| Jan 22, 2009 | Completed final sign-off May 2009 | 424 Frederick St | unit 426 only: remodel kitchen and bath at 2nd floor. remove partial wall kitchen, enlarge bath, reconfigure rooms, add skylight above kitchen island. all work on 2nd floor only.Details
unit 426 only: remodel kitchen and bath at 2nd floor. remove partial wall kitchen, enlarge bath, reconfigure rooms, add skylight above kitchen island. all work on 2nd floor only. | $106,300 |
| Nov 15, 2006 | Completed final sign-off May 2007 | 1000 North Point St | replace (1) kitchen counter and 2 bath counters, modify (e) kitchen cabinets faces + doors, replace (e) shower & pan with new tile shower, no alteration of wallsDetails
replace (1) kitchen counter and 2 bath counters, modify (e) kitchen cabinets faces + doors, replace (e) shower & pan with new tile shower, no alteration of walls | $20,000 |
| Jul 31, 2002 | Completed final sign-off Jan 2003 | 2637 Broderick St | kitchen remodel: new floors/cabinets/counters/windowsDetails
kitchen remodel: new floors/cabinets/counters/windows | $50,000 |