Back to bathroom remodel contractors
Mc Cutcheon Construction Co.
- Based in
- Berkeley
- On San Francisco permits
- Jul 2002 to Jul 2024
- Last 24 months
- 0 permits filed
88 permits since 2000: 73 completed, 6 never finaled, 9 expired or cancelled.
Of the 6 never-finaled permits, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
33 bathroom remodel permits: 30 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 7, 2021 | Completed final sign-off Aug 2022 | 2250 Bush St | remodel 3 (e) bathrooms & kitchen. relocate (1) bathroom. create (n) bedroom & closet area. relocate (e) laundry on 2nd floor. install (1) (n) window. sash replacements at (7) locations in wood w/ intergal ogee.Details
remodel 3 (e) bathrooms & kitchen. relocate (1) bathroom. create (n) bedroom & closet area. relocate (e) laundry on 2nd floor. install (1) (n) window. sash replacements at (7) locations in wood w/ intergal ogee. | $261,937 |
| Jun 20, 2019 | Completed final sign-off Dec 2019 | 1250 Jones St | unit 903 - cosmetic remodel of 2 bathrooms - new fixtures, tile, paint, lightsDetails
unit 903 - cosmetic remodel of 2 bathrooms - new fixtures, tile, paint, lights | $80,000 |
| Oct 1, 2018 | Completed final sign-off Apr 2019 | 176 Edgewood Av | interior remodel of guest bathroom @ 2nd floorDetails
interior remodel of guest bathroom @ 2nd floor | $15,000 |
| Jul 16, 2018 | Completed final sign-off Jul 2019 | 1734 Waller St | kitchen remodel, bath remodel, window replacement, widen garage doorDetails
kitchen remodel, bath remodel, window replacement, widen garage door | $175,000 |
| Aug 9, 2017 | Completed final sign-off Jan 2018 | 35 Amber Dr | revision to pa 2016-0224-0353 - structural changes on the roof, switch proposed location of sink and shower in master bathroomDetails
revision to pa 2016-0224-0353 - structural changes on the roof, switch proposed location of sink and shower in master bathroom | $32,000 |
| Jul 25, 2017 | Completed final sign-off Nov 2017 | 1353 04th Av | install new tile at bathroom floor including shower walls & ceiling, no wall changeDetails
install new tile at bathroom floor including shower walls & ceiling, no wall change | $5,000 |
| Apr 14, 2016 | Completed final sign-off Mar 2017 | 1960 Vallejo St | interior remodel of unit 7. kitchen remodel, remove wall in kitchen. remodel master bath and closet. remodel powder rm converting from full bath to 1/2 bath. new tile bath 3. interior work only. no change of use.Details
interior remodel of unit 7. kitchen remodel, remove wall in kitchen. remodel master bath and closet. remodel powder rm converting from full bath to 1/2 bath. new tile bath 3. interior work only. no change of use. | $375,000 |
| Feb 24, 2016 | Completed final sign-off Jan 2018 | 35 Amber Dr | the work consistes of: remodeling 2 bedrooms and 1 bathroom and the addition of 1 bedroom within (e) envelope. add skylight not visible from streetDetails
the work consistes of: remodeling 2 bedrooms and 1 bathroom and the addition of 1 bedroom within (e) envelope. add skylight not visible from street | $50,000 |
| Nov 13, 2015 | Completed final sign-off Feb 2016 | 1980 Sutter St | unit #205, remodel (e) kitchen, bathroom & bedroom closet. maher naDetails
unit #205, remodel (e) kitchen, bathroom & bedroom closet. maher na | $40,000 |
| Sep 9, 2015 | Completed final sign-off May 2016 | 170 Pacific Av | remodel 2nd floor bathroom and replace tub with shower. replace closet doors at 2nd floor hall. replace double sink vanity at master bathroom and replace vanity lights. replace flooring throughout unitDetails
remodel 2nd floor bathroom and replace tub with shower. replace closet doors at 2nd floor hall. replace double sink vanity at master bathroom and replace vanity lights. replace flooring throughout unit | $45,000 |
| Sep 9, 2015 | Completed final sign-off May 2016 | 170 Pacific Av | remodel 2nd floor bathroom and replace tub with shower. replace closet doors at 2nd floor hall. replace double sink vanity at master bathroom and replace vanity lights. replace flooring throughout unitDetails
remodel 2nd floor bathroom and replace tub with shower. replace closet doors at 2nd floor hall. replace double sink vanity at master bathroom and replace vanity lights. replace flooring throughout unit | $65,000 |
| Aug 13, 2015 | Completed final sign-off Mar 2016 | 60 Rausch St | remodel e kitchen and bath in kind maher not reqDetails
remodel e kitchen and bath in kind maher not req | $40,000 |
| Jun 17, 2015 | Completed final sign-off Jan 2016 | 156 Lombard St | unit #11 - kitchen, master bath renovation, electrical upgrades. n/a maher ordinanceDetails
unit #11 - kitchen, master bath renovation, electrical upgrades. n/a maher ordinance | $85,000 |
| Nov 19, 2014 | Completed final sign-off Feb 2018 | 4037 22nd St | horz add@rear.garage lev,1st&2nd/fl.remove(e)frt porch,stair&porch rf&replace w/new stair,porch&porch rf.garage level,remv(e)int stair,excav to higher ceiling.prov new int stair&walls.1/fl remove&recon walls to expand kit&din.prov new bath.2/fl:remove&recon walls expand(e)bedrms,renov(e)bath,addbathDetails
horz add@rear.garage lev,1st&2nd/fl.remove(e)frt porch,stair&porch rf&replace w/new stair,porch&porch rf.garage level,remv(e)int stair,excav to higher ceiling.prov new int stair&walls.1/fl remove&recon walls to expand kit&din.prov new bath.2/fl:remove&recon walls expand(e)bedrms,renov(e)bath,addbath | $313,000 |
| Jun 30, 2014 | Completed final sign-off Feb 2015 | 935 Chestnut St | in kind replacment of wooden windows (sashes only) at first floor, remodel (e) bathroom at first floor remodel cabinets, electrical & wet bar @ first flr, (e) forced air furnance to remain. no structural work ,uf on new windows to be 0.4 or lessDetails
in kind replacment of wooden windows (sashes only) at first floor, remodel (e) bathroom at first floor remodel cabinets, electrical & wet bar @ first flr, (e) forced air furnance to remain. no structural work ,uf on new windows to be 0.4 or less | $95,000 |
| Feb 5, 2014 | Completed final sign-off Jul 2014 | 601 Van Ness Av | new countertops, kitchen and baths. new cabinets in bathrooms, closet shelving, fireplace surround. new flooring, stair railing, lighting.Details
new countertops, kitchen and baths. new cabinets in bathrooms, closet shelving, fireplace surround. new flooring, stair railing, lighting. | $72,000 |
| Jan 3, 2014 | Completed final sign-off Apr 2014 | 510 Los Palmos Dr | interior remodel, kitchen, powder room, master bath. new gas fire insert, new skylight, new shower panDetails
interior remodel, kitchen, powder room, master bath. new gas fire insert, new skylight, new shower pan | $76,000 |
| Oct 30, 2013 | Completed final sign-off Jul 2016 | 176 Edgewood Av | partial removal of walls at ground floor level stair. partial of ground level to be lowered 15". remodel extg bath, new partial bathroom and laundry room. addition of new balcony at rear yard. new hvac system to be installed.Details
partial removal of walls at ground floor level stair. partial of ground level to be lowered 15". remodel extg bath, new partial bathroom and laundry room. addition of new balcony at rear yard. new hvac system to be installed. | $325,000 |
| Mar 14, 2013 | Completed final sign-off May 2014 | 930 Chestnut St | project includes renovating extg storage space on the ground floor into habitable space. this will finish space into a guest bedroom, guest bath, and powder room.Details
project includes renovating extg storage space on the ground floor into habitable space. this will finish space into a guest bedroom, guest bath, and powder room. | $40,000 |
| Jun 18, 2012 | Never finaled issued Jun 2012, no final | 2673 California St | replace 2 existing french doors with new doors to match existing. add bathroom fan @ front bathroom. all work in unit above garage.Details
replace 2 existing french doors with new doors to match existing. add bathroom fan @ front bathroom. all work in unit above garage. | $2,500 |
| Oct 12, 2011 | Completed final sign-off Oct 2012 | 1750 Taylor St | unit #1803: full interior remodel to include new glazing at existing window locations, (e) kitchen remodel, three (e) bathrooms remodel, new finishes throughout, and two new shower pans.Details
unit #1803: full interior remodel to include new glazing at existing window locations, (e) kitchen remodel, three (e) bathrooms remodel, new finishes throughout, and two new shower pans. | $285,000 |
| Jul 28, 2011 | Completed final sign-off Jul 2012 | 1501 Ortega St | remodel kitchen, bathroom. replace 2 extg skylights, same location.Details
remodel kitchen, bathroom. replace 2 extg skylights, same location. | $50,000 |
| May 5, 2011 | Never finaled issued May 2011, no final | 1855 Scott St | revision to pa#201102281042. reduce scope of work to one bathroom on each unit. no bathroom finishes, no sink/lavatory and no medicine cabinet to be installed under this permit.Details
revision to pa#201102281042. reduce scope of work to one bathroom on each unit. no bathroom finishes, no sink/lavatory and no medicine cabinet to be installed under this permit. | |
| Feb 28, 2011 | Completed final sign-off May 2011 | 1853 Scott St | unit 1853 scott st:partial kitchen remodel. replace 2 extg windows, new skylight, new duct and outlets, new electrical, panel, bath finishes and sink. uint 1855 scott:replace extg washer/dryer, bathroom finishes, sink, new duct, elect. panel.Details
unit 1853 scott st:partial kitchen remodel. replace 2 extg windows, new skylight, new duct and outlets, new electrical, panel, bath finishes and sink. uint 1855 scott:replace extg washer/dryer, bathroom finishes, sink, new duct, elect. panel. | $28,500 |
| Feb 9, 2011 | Completed final sign-off Aug 2011 | 2735 Sutter St | remodel kitchen and bathroom. 2 new windows in extg locations. not visible from the street. add skylight in bath room and at kitchen.Details
remodel kitchen and bathroom. 2 new windows in extg locations. not visible from the street. add skylight in bath room and at kitchen. | $42,000 |
| Sep 11, 2009 | Completed final sign-off Nov 2009 | 530 Chestnut St | unit 305 - interior bathroom remodel - new pocket door at bedroom, new cabinetry at living room, small interior partition walls. new lighting, electrical at bathroom, bedroom & living room.Details
unit 305 - interior bathroom remodel - new pocket door at bedroom, new cabinetry at living room, small interior partition walls. new lighting, electrical at bathroom, bedroom & living room. | $17,500 |
| Jun 9, 2009 | Completed final sign-off Nov 2009 | 424 Frederick St | remodel kitchen. int. remodel, new lighting and elec., remodel bath and powder rm. new plumbing fixtures. add struc. beam/header bth kitch/fam.rm. replace furnace in garage/mech room.(window replacement sep permit)Details
remodel kitchen. int. remodel, new lighting and elec., remodel bath and powder rm. new plumbing fixtures. add struc. beam/header bth kitch/fam.rm. replace furnace in garage/mech room.(window replacement sep permit) | $109,500 |
| Mar 19, 2009 | Completed final sign-off May 2009 | 426 Frederick St | revision to (e) permit 2009/0122/0640. correction/revision to bathroom plans & elevs. a2.0 & a3.0 shower pan drawings-no increase in cost work in 426 only waterproof shower pan.Details
revision to (e) permit 2009/0122/0640. correction/revision to bathroom plans & elevs. a2.0 & a3.0 shower pan drawings-no increase in cost work in 426 only waterproof shower pan. | $80 |
| Jan 22, 2009 | Completed final sign-off May 2009 | 424 Frederick St | unit 426 only: remodel kitchen and bath at 2nd floor. remove partial wall kitchen, enlarge bath, reconfigure rooms, add skylight above kitchen island. all work on 2nd floor only.Details
unit 426 only: remodel kitchen and bath at 2nd floor. remove partial wall kitchen, enlarge bath, reconfigure rooms, add skylight above kitchen island. all work on 2nd floor only. | $106,300 |
| Nov 15, 2006 | Completed final sign-off May 2007 | 1000 North Point St | replace (1) kitchen counter and 2 bath counters, modify (e) kitchen cabinets faces + doors, replace (e) shower & pan with new tile shower, no alteration of wallsDetails
replace (1) kitchen counter and 2 bath counters, modify (e) kitchen cabinets faces + doors, replace (e) shower & pan with new tile shower, no alteration of walls | $20,000 |
| Aug 2, 2006 | Expired or cancelled expired Oct 2012 | 2006 Lyon St | remodel (e) bathroom on 1/f, replace (e) french door in rear of bldg with (n) sliding glass door, install (n) beam & posts over (n) sliding glass door, repair & replace (e) retaining wall (3' high)Details
remodel (e) bathroom on 1/f, replace (e) french door in rear of bldg with (n) sliding glass door, install (n) beam & posts over (n) sliding glass door, repair & replace (e) retaining wall (3' high) | $8,500 |
| May 26, 2006 | Completed final sign-off Dec 2006 | 2006 Lyon St | bathroom remodel @ 2nd floor no structural work.Details
bathroom remodel @ 2nd floor no structural work. | $18,000 |
| Jun 13, 2005 | Completed final sign-off Sep 2005 | 1558 Grove St | bathroom remodel: demolition of (e) tile, new tile, lighting, reuse (e) fixturesDetails
bathroom remodel: demolition of (e) tile, new tile, lighting, reuse (e) fixtures | $28,000 |