Maximo Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2002 to Oct 2026
- Last 24 months
- 10 permits filed
45 permits since 2000: 40 completed, 4 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 4 completed, 1 in progress. Typically 124 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2025 | Completed final sign-off May 2026 | 364 Moscow St | rebuild exterior entry stairs to bring into compliance. new front facade windows, withing (e) window openings. new exterior swing door for garage level. no change to (e) garage door or (e) entry door. replace with (e) opening single winodw on south side facade.Details
rebuild exterior entry stairs to bring into compliance. new front facade windows, withing (e) window openings. new exterior swing door for garage level. no change to (e) garage door or (e) entry door. replace with (e) opening single winodw on south side facade. | $10,000 |
| Mar 10, 2025 | In progress issued Jun 2025 | 1942 Leavenworth St | expansion of conditioned living space from the 2nd fl unit to the 1st fl. (n) bedroom, bathroom & laundry. (n) internal stair connecting to lower fl. at 2nd fl reconfigure & open the kitchen to adjacent living room & add (n) bathDetails
expansion of conditioned living space from the 2nd fl unit to the 1st fl. (n) bedroom, bathroom & laundry. (n) internal stair connecting to lower fl. at 2nd fl reconfigure & open the kitchen to adjacent living room & add (n) bath | $200,000 |
| Jun 2, 2021 | Completed final sign-off Apr 2022 | 150 Staples Av | convert storage space to living space with bath, laundry, bedroom & office. replace existing stairs at rear, remove existing stairs at side. remodel kitchen.Details
convert storage space to living space with bath, laundry, bedroom & office. replace existing stairs at rear, remove existing stairs at side. remodel kitchen. | $100,000 |
| Jun 25, 2020 | Completed final sign-off Jun 2021 | 740 09th Av | remove rear yard stair at 1/f (to comply with complaint #202025201)Details
remove rear yard stair at 1/f (to comply with complaint #202025201) | $5,000 |
| Oct 11, 2018 | Completed final sign-off Feb 2019 | 20 Ringold St | in-kind rear stair renovation. 74 sq ft deck addition at 2nd and 3rd flrs. maher n/aDetails
in-kind rear stair renovation. 74 sq ft deck addition at 2nd and 3rd flrs. maher n/a | $7,500 |