Back to kitchen remodel contractors
Maximo Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2002 to Oct 2026
- Last 24 months
- 10 permits filed
45 permits since 2000: 40 completed, 4 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 17 completed, 2 in progress. Typically 33 days from filing to permit and 203 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 19, 2026 | In progress issued Jun 2026 | 469 Clementina St | unit #2: in-kind kitchen remodel.Details
unit #2: in-kind kitchen remodel. | $50,000 |
| May 11, 2026 | Completed final sign-off Sep 2026 | 60 Rausch St | unit# 204. in-kind kitchen remodel.Details
unit# 204. in-kind kitchen remodel. | $50,000 |
| Mar 28, 2025 | Completed final sign-off Sep 2025 | 2531 Post St | kitchen remodel: remove (e) fixtures and cabinets to replace w/ all new fixtures.Details
kitchen remodel: remove (e) fixtures and cabinets to replace w/ all new fixtures. | $45,000 |
| Mar 10, 2025 | In progress issued Jun 2025 | 1942 Leavenworth St | expansion of conditioned living space from the 2nd fl unit to the 1st fl. (n) bedroom, bathroom & laundry. (n) internal stair connecting to lower fl. at 2nd fl reconfigure & open the kitchen to adjacent living room & add (n) bathDetails
expansion of conditioned living space from the 2nd fl unit to the 1st fl. (n) bedroom, bathroom & laundry. (n) internal stair connecting to lower fl. at 2nd fl reconfigure & open the kitchen to adjacent living room & add (n) bath | $200,000 |
| Aug 5, 2024 | Completed final sign-off Apr 2025 | 114 Saint Charles Av | interior remodel on 2nd fl; remodel kitchen and refurbish bathroomDetails
interior remodel on 2nd fl; remodel kitchen and refurbish bathroom | $40,000 |
| Oct 26, 2022 | Completed final sign-off Apr 2025 | 364 Moscow St | recommencement and completion of work approved under pa# 201109074019. 50% of work remaining. new exterior deck with firewall on south edge. new raised floor at garage level. remove 2 non-compliant rear yard sheds. interior kitchen remodel, bath relocation, & wall reconfiguration at 2nd fl.Details
recommencement and completion of work approved under pa# 201109074019. 50% of work remaining. new exterior deck with firewall on south edge. new raised floor at garage level. remove 2 non-compliant rear yard sheds. interior kitchen remodel, bath relocation, & wall reconfiguration at 2nd fl. | $20,000 |
| Mar 17, 2022 | Completed final sign-off May 2023 | 2554 14th Av | legalize unpermitted work to lower level. bedroom, family room, 2 baths, remodel (e) kitchen on 2/f.Details
legalize unpermitted work to lower level. bedroom, family room, 2 baths, remodel (e) kitchen on 2/f. | $175,000 |
| Sep 29, 2021 | Completed final sign-off Jan 2024 | 505 Garfield St | single story addition within rear yard, to an existing single family dwelling. renovation of existing kitchen and deck on the roof of single story addition.Details
single story addition within rear yard, to an existing single family dwelling. renovation of existing kitchen and deck on the roof of single story addition. | $110,000 |
| Jun 11, 2021 | Completed final sign-off May 2023 | 117 Frederick St | remodel kitchen, new lighting, cabinets and appliances.Details
remodel kitchen, new lighting, cabinets and appliances. | $75,000 |
| Jun 2, 2021 | Completed final sign-off Apr 2022 | 150 Staples Av | convert storage space to living space with bath, laundry, bedroom & office. replace existing stairs at rear, remove existing stairs at side. remodel kitchen.Details
convert storage space to living space with bath, laundry, bedroom & office. replace existing stairs at rear, remove existing stairs at side. remodel kitchen. | $100,000 |
| Sep 23, 2020 | Completed final sign-off Aug 2021 | 217 Vicksburg St | unit 2: relocate kitchen & bedroom. add bathroom. structural, plumbing & electrical as required. all work within (e) envelope of unit 2.Details
unit 2: relocate kitchen & bedroom. add bathroom. structural, plumbing & electrical as required. all work within (e) envelope of unit 2. | $90,000 |
| Jul 8, 2020 | Completed final sign-off May 2021 | 989 Lombard St | complete remodel of this unit which includes kitchen and one bath and the creation of an additional bathroom.Details
complete remodel of this unit which includes kitchen and one bath and the creation of an additional bathroom. | $85,000 |
| Mar 19, 2019 | Completed final sign-off Mar 2020 | 1520 Florida St | interior: relocate partitions, relocate bath fixtures, 2 new powder rooms, new laundry. structure: reframe front porch & open kitchen wall. exterior: increase garage door width, new widow at 1st floor, replace window at 2nd flr.Details
interior: relocate partitions, relocate bath fixtures, 2 new powder rooms, new laundry. structure: reframe front porch & open kitchen wall. exterior: increase garage door width, new widow at 1st floor, replace window at 2nd flr. | $75,000 |
| Sep 17, 2015 | Completed final sign-off Jan 2016 | 20 Ringold St | remodel one kitchen and one bathroom, add 1 new bathroom. n/a ordinance #155-13Details
remodel one kitchen and one bathroom, add 1 new bathroom. n/a ordinance #155-13 | $60,000 |
| Sep 13, 2007 | Completed final sign-off Nov 2007 | 31 Sussex St | revision to appl. #200708180085. removal of a loading bearing in the 2nd floor kitchen.Details
revision to appl. #200708180085. removal of a loading bearing in the 2nd floor kitchen. | $4,000 |
| Aug 16, 2007 | Completed final sign-off Nov 2007 | 31 Sussex St | kitchen remodel: we are removing the (e) cabinets and fixtures and installing new w/ new appliances. main room light to remain.Details
kitchen remodel: we are removing the (e) cabinets and fixtures and installing new w/ new appliances. main room light to remain. | $10,000 |
| Oct 10, 2006 | Completed final sign-off Apr 2007 | 150 Delmar St | take out kitchen cabinets, ets, in back room , patch & paint & construct new kitchen in back room bedroom in back @ old kitchen location.Details
take out kitchen cabinets, ets, in back room , patch & paint & construct new kitchen in back room bedroom in back @ old kitchen location. | $12,500 |
| Feb 2, 2006 | Completed final sign-off Sep 2006 | 2686 16th Av | kitchen remodel with the removal of one non-load bearing wall(see structural report taking out old fixture install new foot print of kchn is staying the same/flourescent lightingDetails
kitchen remodel with the removal of one non-load bearing wall(see structural report taking out old fixture install new foot print of kchn is staying the same/flourescent lighting | $40,000 |
| Jul 15, 2005 | Completed final sign-off Jan 2006 | 1215 Greenwich St | removal 0f old doors and kitchen cabinets and old vanity. install new doors and cabinets in same locDetails
removal 0f old doors and kitchen cabinets and old vanity. install new doors and cabinets in same loc | $40,000 |