Back to bathroom remodel contractors
Maximo Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2002 to Oct 2026
- Last 24 months
- 10 permits filed
45 permits since 2000: 40 completed, 4 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 18 completed, 1 in progress. Typically 33 days from filing to permit and 159 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 15, 2026 | Completed final sign-off Jul 2026 | 2531 Post St | removal of plumbing fixtures and subflooring in bathroom to install new plumbing and make upgrades as needed. all fixtures being removed are like for like and will be placed in same locations. replacing flooring in kind.Details
removal of plumbing fixtures and subflooring in bathroom to install new plumbing and make upgrades as needed. all fixtures being removed are like for like and will be placed in same locations. replacing flooring in kind. | $12,000 |
| Jul 21, 2025 | Completed final sign-off Jun 2026 | 1593 Treat Av | add bathroom and laundry to (e) lower 2nd floor unit of a 2 unit condominium.Details
add bathroom and laundry to (e) lower 2nd floor unit of a 2 unit condominium. | $20,000 |
| Apr 10, 2025 | Completed final sign-off Oct 2025 | 114 Saint Charles Av | interior remodel in 1st floor: add a bedroom and a bathroom.Details
interior remodel in 1st floor: add a bedroom and a bathroom. | $60,000 |
| Mar 10, 2025 | In progress issued Jun 2025 | 1942 Leavenworth St | expansion of conditioned living space from the 2nd fl unit to the 1st fl. (n) bedroom, bathroom & laundry. (n) internal stair connecting to lower fl. at 2nd fl reconfigure & open the kitchen to adjacent living room & add (n) bathDetails
expansion of conditioned living space from the 2nd fl unit to the 1st fl. (n) bedroom, bathroom & laundry. (n) internal stair connecting to lower fl. at 2nd fl reconfigure & open the kitchen to adjacent living room & add (n) bath | $200,000 |
| Aug 5, 2024 | Completed final sign-off Apr 2025 | 114 Saint Charles Av | interior remodel on 2nd fl; remodel kitchen and refurbish bathroomDetails
interior remodel on 2nd fl; remodel kitchen and refurbish bathroom | $40,000 |
| Feb 23, 2024 | Completed final sign-off Apr 2024 | 469 Clementina St | remodel existing bathroom. remove all fixtures to be replaced with new fixtures. new vanity, new lights, and new shower pan. remodel in kind.Details
remodel existing bathroom. remove all fixtures to be replaced with new fixtures. new vanity, new lights, and new shower pan. remodel in kind. | $15,000 |
| Sep 19, 2023 | Completed final sign-off Jan 2024 | 505 Garfield St | rev to pa#2021-0929-9456; relocate proposed bathroom including minor changes to proposed elevationsDetails
rev to pa#2021-0929-9456; relocate proposed bathroom including minor changes to proposed elevations | |
| Jun 21, 2023 | Completed final sign-off Oct 2023 | 472 Pacheco St | bathroom remodel- footprint stays the same only. taking out the old fixtures and installing new ones. the tub will be removed and turned into a walk in shower. no plans needed. remodel in-kind.Details
bathroom remodel- footprint stays the same only. taking out the old fixtures and installing new ones. the tub will be removed and turned into a walk in shower. no plans needed. remodel in-kind. | $12,000 |
| Oct 26, 2022 | Completed final sign-off Apr 2025 | 364 Moscow St | recommencement and completion of work approved under pa# 201109074019. 50% of work remaining. new exterior deck with firewall on south edge. new raised floor at garage level. remove 2 non-compliant rear yard sheds. interior kitchen remodel, bath relocation, & wall reconfiguration at 2nd fl.Details
recommencement and completion of work approved under pa# 201109074019. 50% of work remaining. new exterior deck with firewall on south edge. new raised floor at garage level. remove 2 non-compliant rear yard sheds. interior kitchen remodel, bath relocation, & wall reconfiguration at 2nd fl. | $20,000 |
| Oct 14, 2022 | Completed final sign-off Feb 2023 | 9 Las Villas Ct | remodel guest bathroom in-kind. take out tub, toilet and vanity, and replace in same footprint with new fixtures.Details
remodel guest bathroom in-kind. take out tub, toilet and vanity, and replace in same footprint with new fixtures. | $10,000 |
| Mar 17, 2022 | Completed final sign-off May 2023 | 2554 14th Av | legalize unpermitted work to lower level. bedroom, family room, 2 baths, remodel (e) kitchen on 2/f.Details
legalize unpermitted work to lower level. bedroom, family room, 2 baths, remodel (e) kitchen on 2/f. | $175,000 |
| Feb 10, 2022 | Completed final sign-off Aug 2022 | 130 Cerritos Av | (n) aluminum clad wood windows & flashings. (n) door to be installed in basement. trims to be replaced to match (e). (n) stucco around windows and door to match (e). (n) paint finish. (n) skylight install. bathroom remodel.Details
(n) aluminum clad wood windows & flashings. (n) door to be installed in basement. trims to be replaced to match (e). (n) stucco around windows and door to match (e). (n) paint finish. (n) skylight install. bathroom remodel. | $30,000 |
| Jun 2, 2021 | Completed final sign-off Apr 2022 | 150 Staples Av | convert storage space to living space with bath, laundry, bedroom & office. replace existing stairs at rear, remove existing stairs at side. remodel kitchen.Details
convert storage space to living space with bath, laundry, bedroom & office. replace existing stairs at rear, remove existing stairs at side. remodel kitchen. | $100,000 |
| Sep 23, 2020 | Completed final sign-off Aug 2021 | 217 Vicksburg St | unit 2: relocate kitchen & bedroom. add bathroom. structural, plumbing & electrical as required. all work within (e) envelope of unit 2.Details
unit 2: relocate kitchen & bedroom. add bathroom. structural, plumbing & electrical as required. all work within (e) envelope of unit 2. | $90,000 |
| Jul 8, 2020 | Completed final sign-off May 2021 | 989 Lombard St | complete remodel of this unit which includes kitchen and one bath and the creation of an additional bathroom.Details
complete remodel of this unit which includes kitchen and one bath and the creation of an additional bathroom. | $85,000 |
| Mar 19, 2019 | Completed final sign-off Mar 2020 | 1520 Florida St | interior: relocate partitions, relocate bath fixtures, 2 new powder rooms, new laundry. structure: reframe front porch & open kitchen wall. exterior: increase garage door width, new widow at 1st floor, replace window at 2nd flr.Details
interior: relocate partitions, relocate bath fixtures, 2 new powder rooms, new laundry. structure: reframe front porch & open kitchen wall. exterior: increase garage door width, new widow at 1st floor, replace window at 2nd flr. | $75,000 |
| Sep 17, 2015 | Completed final sign-off Jan 2016 | 20 Ringold St | remodel one kitchen and one bathroom, add 1 new bathroom. n/a ordinance #155-13Details
remodel one kitchen and one bathroom, add 1 new bathroom. n/a ordinance #155-13 | $60,000 |
| Jun 11, 2008 | Completed final sign-off Jul 2008 | 899 41st Av | legalize existing family room, excerise room, library and 2 half bath at ground floorDetails
legalize existing family room, excerise room, library and 2 half bath at ground floor | $20,000 |
| Jun 12, 2006 | Completed final sign-off Dec 2006 | 150 Delmar St | bathroom remodel. including (n) plumbing & electrical fixtures finishes.Details
bathroom remodel. including (n) plumbing & electrical fixtures finishes. | $20,000 |