Maven Maintenance Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2006 to Aug 2026
- Last 24 months
- 15 permits filed
235 permits since 2000: 173 completed, 4 in progress, 27 never finaled, 31 expired or cancelled.
Of the 27 never-finaled permits, 2 are 3 to 5 years old, 9 are 5 to 10 years old, 16 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
18 stairs permits: 15 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 15 days from filing to permit and 192 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2026 | Completed final sign-off Jul 2026 | 1490 Jefferson St | replacement of e) guardrails at e) common stairsDetails
replacement of e) guardrails at e) common stairs | $5,000 |
| Dec 12, 2025 | In progress issued Jul 2026 | 3355 21st St | rebuild (e) non conforming rear stairs.the enlargement of the (e) non conforming rear stairs is " only to the degree necessary to conform to current building code" per p.c. sec. 188(a) (1)Details
rebuild (e) non conforming rear stairs.the enlargement of the (e) non conforming rear stairs is " only to the degree necessary to conform to current building code" per p.c. sec. 188(a) (1) | $17,300 |
| Mar 2, 2022 | Completed final sign-off Nov 2022 | 3355 21st St | repair and replace front stairs. repair and replace common stairs in front of bldg.Details
repair and replace front stairs. repair and replace common stairs in front of bldg. | $7,500 |
| Aug 5, 2021 | Completed final sign-off Jul 2022 | 4288 24th St | replace exterior egress stair in-kind.Details
replace exterior egress stair in-kind. | $2,000 |
| Jun 12, 2020 | Completed final sign-off Jun 2020 | 2591 California St | replacement of 7 steps, landing and 3 stringers in kind. stairs located left side of building , less than 50% of staircase. not viewable from street.Details
replacement of 7 steps, landing and 3 stringers in kind. stairs located left side of building , less than 50% of staircase. not viewable from street. | $2,900 |
| Jun 2, 2020 | Completed final sign-off Jan 2021 | 1420 Taylor St | rebuild the south east and north east exterior stair wells in kind, 100% replacementDetails
rebuild the south east and north east exterior stair wells in kind, 100% replacement | $10,000 |
| Feb 13, 2020 | Completed final sign-off Aug 2020 | 1344 Jackson St | replace e wood stairs with new in like kind in accordance with sfbc 1011.12.3 cbc 2019403.1Details
replace e wood stairs with new in like kind in accordance with sfbc 1011.12.3 cbc 2019403.1 | $18,000 |
| Oct 13, 2016 | Completed final sign-off Mar 2017 | 4740 Balboa St | work in unit 104: remodel unit 104, remodel kitchen and bathroom in-kind. new cabinets, countertops, sinks, toilet, vanity, tile & fixtures. repair less than 50% of eastside stairs. all work not visible from the street.Details
work in unit 104: remodel unit 104, remodel kitchen and bathroom in-kind. new cabinets, countertops, sinks, toilet, vanity, tile & fixtures. repair less than 50% of eastside stairs. all work not visible from the street. | $35,000 |
| Jul 21, 2016 | Completed final sign-off Mar 2017 | 1420 Taylor St | repair stair(s) & landings in-kind, as needed due to dry rot. for ground, second, and third.Details
repair stair(s) & landings in-kind, as needed due to dry rot. for ground, second, and third. | $25,000 |
| May 17, 2016 | Completed final sign-off Nov 2016 | 1961 15th St | comply with nov #201611350 - repair & replace all area of dry rotted rear stairs & landing on all three floors in kind. all material to be p.t. or hard redwood. to comply with bid nov #201611350.Details
comply with nov #201611350 - repair & replace all area of dry rotted rear stairs & landing on all three floors in kind. all material to be p.t. or hard redwood. to comply with bid nov #201611350. | $15,000 |
| Oct 30, 2015 | Expired or cancelled expired Jan 2020 | 770 Clayton St | construct new interior staircase connect between second floor to attic space & upgrade attic floor framing, construct 4 domers on roof.Details
construct new interior staircase connect between second floor to attic space & upgrade attic floor framing, construct 4 domers on roof. | $30,000 |
| Apr 20, 2015 | Completed final sign-off Jul 2015 | 30 Blake St | replace existing stair case with new at front of building in kind.Details
replace existing stair case with new at front of building in kind. | $4,500 |
| Jul 1, 2014 | Completed final sign-off May 2015 | 290 Arch St | replace (e) exterior brick entry stair and repair dry rot to porch framing per plan.Details
replace (e) exterior brick entry stair and repair dry rot to porch framing per plan. | $8,000 |
| Jan 24, 2014 | Completed final sign-off May 2015 | 1530 Hudson Av | construct new deck with staircase at rear of bldg.Details
construct new deck with staircase at rear of bldg. | $6,000 |
| Oct 23, 2013 | Completed final sign-off Nov 2015 | 948 Hampshire St | revision to 2005.0329.8688 & 2013.0301.1337. new roof deck. new interior floor plan. change to proposed rear stair.Details
revision to 2005.0329.8688 & 2013.0301.1337. new roof deck. new interior floor plan. change to proposed rear stair. | $280,000 |
| Sep 4, 2012 | Never finaled issued Sep 2012, no final | 77 Anderson St | revision under app#201207134847. 1)upgrade extg ceiling with new ceiling joists and replace extg sheet rock with new 5/8 type x gyp bd w/r-13 insulation at extg wall at 2nd floor. 2)re-arange extg bedroom/bathroom, re-construct interior staircase from ground floor up to 2nd floor.Details
revision under app#201207134847. 1)upgrade extg ceiling with new ceiling joists and replace extg sheet rock with new 5/8 type x gyp bd w/r-13 insulation at extg wall at 2nd floor. 2)re-arange extg bedroom/bathroom, re-construct interior staircase from ground floor up to 2nd floor. | $28,000 |
| Aug 19, 2011 | Completed final sign-off Jun 2015 | 3066 Market St | comply 201249341. vertical & horizontal addition: 1st fl, new garage, family rm, office, front stairs. 2nd fl: new kitchen. 3rd fl: new master bedroom, bath, closet and roof deck.Details
comply 201249341. vertical & horizontal addition: 1st fl, new garage, family rm, office, front stairs. 2nd fl: new kitchen. 3rd fl: new master bedroom, bath, closet and roof deck. | $95,000 |
| Jul 21, 2011 | Completed final sign-off Jun 2015 | 3066 Market St | comply with nov# 200456251 for retaining wall at front & double doors at rear wall- replace (e) foundation, remodel 2 bathrms, 4 bedrms, (e) kitchen. relocate (e) stairs, upgrade (e) electrical & plumbing.Details
comply with nov# 200456251 for retaining wall at front & double doors at rear wall- replace (e) foundation, remodel 2 bathrms, 4 bedrms, (e) kitchen. relocate (e) stairs, upgrade (e) electrical & plumbing. | $95,000 |