Maven Maintenance Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2006 to Aug 2026
- Last 24 months
- 15 permits filed
235 permits since 2000: 173 completed, 4 in progress, 27 never finaled, 31 expired or cancelled.
Of the 27 never-finaled permits, 2 are 3 to 5 years old, 9 are 5 to 10 years old, 16 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
6 deck permits: 4 completed, 2 never finaled. Typically 101 days from filing to permit and 378 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 14, 2020 | Never finaled issued Feb 2020, no final | 2080 Vallejo St | repairs to side stairwell and back decks. all work in kind not visible from streetDetails
repairs to side stairwell and back decks. all work in kind not visible from street | $1,200 |
| Mar 12, 2019 | Completed final sign-off Dec 2019 | 525 Gough St | unit #104; remodel in kind. replace kitchen cabinets and counters. new bathroom tiles and fixtures in all three bathrooms. replace tub in master bath with shower stall only. replace light fixtures. replace sliding glass doors to rear deckDetails
unit #104; remodel in kind. replace kitchen cabinets and counters. new bathroom tiles and fixtures in all three bathrooms. replace tub in master bath with shower stall only. replace light fixtures. replace sliding glass doors to rear deck | $7,000 |
| Oct 27, 2016 | Completed final sign-off Jul 2019 | 107 Marietta Dr | exterior renovation of sfd. add 2 rear decks on two levels. modify windows on all levels, add skylights, repair stucco. interior work under separate permit. revision to pa# 2015/11/24/3483.Details
exterior renovation of sfd. add 2 rear decks on two levels. modify windows on all levels, add skylights, repair stucco. interior work under separate permit. revision to pa# 2015/11/24/3483. | $20,000 |
| Mar 7, 2016 | Never finaled issued May 2019, no final | 1839 18th Av | vertical addition. include addition of master bedroom & bathroom & open area. (2) decks, front & rear to be built.Details
vertical addition. include addition of master bedroom & bathroom & open area. (2) decks, front & rear to be built. | $150,000 |
| Jan 24, 2014 | Completed final sign-off May 2015 | 1530 Hudson Av | construct new deck with staircase at rear of bldg.Details
construct new deck with staircase at rear of bldg. | $6,000 |
| Apr 24, 2012 | Completed final sign-off Feb 2014 | 126 Mullen Av | convert existing two apartments back to single family dwelling. cut opening in wall between units. remove kitchen at 124 mullen. add (n) deck and door to west side. enclose existing entrances at east side.Details
convert existing two apartments back to single family dwelling. cut opening in wall between units. remove kitchen at 124 mullen. add (n) deck and door to west side. enclose existing entrances at east side. | $2,500 |