Matt Sanford Homes
- Based in
- San Francisco
- On San Francisco permits
- Feb 2012 to May 2019
- Last 24 months
- 0 permits filed
35 permits since 2000: 32 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 2 days from filing to permit and 200 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 28, 2019 | Completed final sign-off Sep 2020 | 930 Potrero Av | revision to 201803214196 new 4th storey roof deck including new roof hatch and internal sprinal stair from 3rd flr. remove (e) side passage on 1st flr and convert to living space. roof hatch <12" from top of (e) roofDetails
revision to 201803214196 new 4th storey roof deck including new roof hatch and internal sprinal stair from 3rd flr. remove (e) side passage on 1st flr and convert to living space. roof hatch <12" from top of (e) roof | $50,000 |
| Mar 21, 2018 | Completed final sign-off Sep 2020 | 930 Potrero Av | remodel of the lower unit with 720 sq ft addition of living space at the first floor level connected via new internal stairs. no expansion of the building envelope. maher na; relocate kitchen to 1/f, add bathroom to 2/f, relocate washer/dryerDetails
remodel of the lower unit with 720 sq ft addition of living space at the first floor level connected via new internal stairs. no expansion of the building envelope. maher na; relocate kitchen to 1/f, add bathroom to 2/f, relocate washer/dryer | $200,000 |
| Aug 1, 2017 | Completed final sign-off Sep 2017 | 930 Potrero Av | to comply with physical report cc-8158 item 2-6 repair handrail & stair stringer, remove bed in closetDetails
to comply with physical report cc-8158 item 2-6 repair handrail & stair stringer, remove bed in closet | $3,000 |
| Aug 9, 2016 | Completed final sign-off Feb 2017 | 537 Gennessee St | 2nd flr: relocate opening between kitchen & living room. install (n) fireplace insert, remodel kitchen & bathroom, reconfigure closet & install new exterior door & window, install new exterior stairs to rear yardDetails
2nd flr: relocate opening between kitchen & living room. install (n) fireplace insert, remodel kitchen & bathroom, reconfigure closet & install new exterior door & window, install new exterior stairs to rear yard | $42,000 |
| May 6, 2014 | Completed final sign-off Oct 2014 | 537 Gennessee St | 1st floor:convert storage area @ back of garage to bedroom, bath, laundry. 2nd floor: remove door and jambs at stairs to lower level.Details
1st floor:convert storage area @ back of garage to bedroom, bath, laundry. 2nd floor: remove door and jambs at stairs to lower level. | $48,000 |