Matt Sanford Homes
- Based in
- San Francisco
- On San Francisco permits
- Feb 2012 to May 2019
- Last 24 months
- 0 permits filed
35 permits since 2000: 32 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 12 completed. Typically 0 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2019 | Completed final sign-off Aug 2019 | 139 Tingley St | bath & kitchen remodel.Details
bath & kitchen remodel. | $52,000 |
| Mar 21, 2018 | Completed final sign-off Sep 2020 | 930 Potrero Av | remodel of the lower unit with 720 sq ft addition of living space at the first floor level connected via new internal stairs. no expansion of the building envelope. maher na; relocate kitchen to 1/f, add bathroom to 2/f, relocate washer/dryerDetails
remodel of the lower unit with 720 sq ft addition of living space at the first floor level connected via new internal stairs. no expansion of the building envelope. maher na; relocate kitchen to 1/f, add bathroom to 2/f, relocate washer/dryer | $200,000 |
| Sep 15, 2017 | Completed final sign-off Feb 2019 | 221 Cayuga Av | developing ground floor accesory rooms adding 1 bath and family rm in residential bldg. adding 2nd floor elevated deck to rear of bldg. residing and replacing (e) rear windows at back elevation. adding (1) bath & family rm to ground flr.Details
developing ground floor accesory rooms adding 1 bath and family rm in residential bldg. adding 2nd floor elevated deck to rear of bldg. residing and replacing (e) rear windows at back elevation. adding (1) bath & family rm to ground flr. | $50,000 |
| Aug 9, 2016 | Completed final sign-off Feb 2017 | 537 Gennessee St | 2nd flr: relocate opening between kitchen & living room. install (n) fireplace insert, remodel kitchen & bathroom, reconfigure closet & install new exterior door & window, install new exterior stairs to rear yardDetails
2nd flr: relocate opening between kitchen & living room. install (n) fireplace insert, remodel kitchen & bathroom, reconfigure closet & install new exterior door & window, install new exterior stairs to rear yard | $42,000 |
| Sep 8, 2015 | Completed final sign-off Oct 2015 | 1953 Hayes St | remove & replace bath tub and vanity sink in 1/2 bathroom no walls moved, removed added or infilled, all existing layouts to remain unchanged.Details
remove & replace bath tub and vanity sink in 1/2 bathroom no walls moved, removed added or infilled, all existing layouts to remain unchanged. | $10,000 |
| Jul 9, 2015 | Completed final sign-off Sep 2015 | 1949 Hayes St | 1/2 bath remodel - remove and repalce bath tub & tile, replace sink vanity. no walls moved, removed, added or installed. all fixture layouts to remain unchanged.Details
1/2 bath remodel - remove and repalce bath tub & tile, replace sink vanity. no walls moved, removed, added or installed. all fixture layouts to remain unchanged. | $13,000 |
| Feb 17, 2015 | Completed final sign-off Jul 2015 | 1951 Hayes St | half bathroom remodel. remove and replace bathtub and tile surround onlyDetails
half bathroom remodel. remove and replace bathtub and tile surround only | $15,000 |
| Jun 10, 2014 | Completed final sign-off Nov 2014 | 188 Alpine Tr | in kind - remodel kitchen and bath at 1st floor and sand and finish floors. remove and replace furnace at basementDetails
in kind - remodel kitchen and bath at 1st floor and sand and finish floors. remove and replace furnace at basement | $60,000 |
| May 6, 2014 | Completed final sign-off Oct 2014 | 537 Gennessee St | 1st floor:convert storage area @ back of garage to bedroom, bath, laundry. 2nd floor: remove door and jambs at stairs to lower level.Details
1st floor:convert storage area @ back of garage to bedroom, bath, laundry. 2nd floor: remove door and jambs at stairs to lower level. | $48,000 |
| Jan 22, 2013 | Completed final sign-off May 2013 | 465 Laidley St | reconfigure 2nd fl master bath and closet to new master bath. replace 2nd fl north (front) evelvation double hung, 3x5 windows with 2 3x5 casetment windows and 1 6x5 sliderDetails
reconfigure 2nd fl master bath and closet to new master bath. replace 2nd fl north (front) evelvation double hung, 3x5 windows with 2 3x5 casetment windows and 1 6x5 slider | $31,000 |
| Jul 18, 2012 | Completed final sign-off Dec 2012 | 2234 47th Av | conversion of part of the ground floor into a bedroom and bathDetails
conversion of part of the ground floor into a bedroom and bath | $50,000 |
| Feb 8, 2012 | Completed final sign-off Mar 2012 | 2539 30th Av | one bath remodel, bath vanity removal and replace in kind, move vanity lights, move plumbing for sink, add insulation and bath vent farnDetails
one bath remodel, bath vanity removal and replace in kind, move vanity lights, move plumbing for sink, add insulation and bath vent farn | $4,500 |