Back to kitchen remodel contractors
Matt Sanford Homes
- Based in
- San Francisco
- On San Francisco permits
- Feb 2012 to May 2019
- Last 24 months
- 0 permits filed
35 permits since 2000: 32 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 1 days from filing to permit and 153 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2019 | Completed final sign-off Aug 2019 | 139 Tingley St | bath & kitchen remodel.Details
bath & kitchen remodel. | $52,000 |
| Mar 21, 2018 | Completed final sign-off Sep 2020 | 930 Potrero Av | remodel of the lower unit with 720 sq ft addition of living space at the first floor level connected via new internal stairs. no expansion of the building envelope. maher na; relocate kitchen to 1/f, add bathroom to 2/f, relocate washer/dryerDetails
remodel of the lower unit with 720 sq ft addition of living space at the first floor level connected via new internal stairs. no expansion of the building envelope. maher na; relocate kitchen to 1/f, add bathroom to 2/f, relocate washer/dryer | $200,000 |
| Aug 9, 2016 | Completed final sign-off Feb 2017 | 537 Gennessee St | 2nd flr: relocate opening between kitchen & living room. install (n) fireplace insert, remodel kitchen & bathroom, reconfigure closet & install new exterior door & window, install new exterior stairs to rear yardDetails
2nd flr: relocate opening between kitchen & living room. install (n) fireplace insert, remodel kitchen & bathroom, reconfigure closet & install new exterior door & window, install new exterior stairs to rear yard | $42,000 |
| Jun 10, 2014 | Completed final sign-off Nov 2014 | 188 Alpine Tr | in kind - remodel kitchen and bath at 1st floor and sand and finish floors. remove and replace furnace at basementDetails
in kind - remodel kitchen and bath at 1st floor and sand and finish floors. remove and replace furnace at basement | $60,000 |
| Jul 22, 2013 | Completed final sign-off Oct 2013 | 328 Brazil Av | unit in unit 328: kitchen remodel on the ground fl. remove non bearing walls between kitchen and living roomDetails
unit in unit 328: kitchen remodel on the ground fl. remove non bearing walls between kitchen and living room | $22,000 |