Back to kitchen remodel contractors
Matalon S F Inc Dba Creation 7 Builders
- Based in
- Walnut Creek
- On San Francisco permits
- Aug 2017 to Jun 2025
- Last 24 months
- 4 permits filed
21 permits since 2000: 17 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 5 completed, 2 never finaled. Typically 0 days from filing to permit and 95 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2023 | Completed final sign-off Jan 2024 | 47 Levant St | remove (e) post by the kitchen. remodel like for like (e) bathroom. renovate the (e) fireplace in the livingroom.Details
remove (e) post by the kitchen. remodel like for like (e) bathroom. renovate the (e) fireplace in the livingroom. | $50,000 |
| Aug 25, 2021 | Never finaled issued Aug 2021, no final | 37 Miraloma Dr | remodeling the extg ktichen: cabinets, relocate appliances. new lights. widening and replacing an extg window in the kitchen. closing & blocking another window.Details
remodeling the extg ktichen: cabinets, relocate appliances. new lights. widening and replacing an extg window in the kitchen. closing & blocking another window. | $60,000 |
| Mar 2, 2021 | Never finaled issued May 2021, no final | 1211 Scott St | remodel 2 kitchens. remove 1 wall. remodel 2 laundry areas.Details
remodel 2 kitchens. remove 1 wall. remodel 2 laundry areas. | $100,000 |
| Oct 28, 2019 | Completed final sign-off May 2020 | 407 Bosworth St | correction/upgrade of (e) 3rd bathroom, fix pipes in floor, on main floor. replacing the kitchen sink and counter topDetails
correction/upgrade of (e) 3rd bathroom, fix pipes in floor, on main floor. replacing the kitchen sink and counter top | $200 |
| Nov 5, 2018 | Completed final sign-off Dec 2018 | 175 Langton St | unit 6. kitchen and master bathroom remodel. like for like replace cabinets, sinks, vanity, toilet, tile, replace tub w/ showerDetails
unit 6. kitchen and master bathroom remodel. like for like replace cabinets, sinks, vanity, toilet, tile, replace tub w/ shower | $25,000 |
| Apr 19, 2018 | Completed final sign-off Jul 2018 | 3166 Baker St | interior alterations: removing one wall between kitchen and living room. kitchen remodeling, redo stucco at the back of house.Details
interior alterations: removing one wall between kitchen and living room. kitchen remodeling, redo stucco at the back of house. | $65,000 |
| Dec 1, 2017 | Completed final sign-off Mar 2018 | 175 Langton St | (1) kitchen and (1.5) bathroom remodel. like for like. maher n/aDetails
(1) kitchen and (1.5) bathroom remodel. like for like. maher n/a | $30,000 |